VA 11 53 61-2011 CUSTOM FABRICATED LABORATORY EQUIPMENT.pdf

上传人:towelfact221 文档编号:1074825 上传时间:2019-04-06 格式:PDF 页数:6 大小:59.74KB
下载 相关 举报
VA 11 53 61-2011 CUSTOM FABRICATED LABORATORY EQUIPMENT.pdf_第1页
第1页 / 共6页
VA 11 53 61-2011 CUSTOM FABRICATED LABORATORY EQUIPMENT.pdf_第2页
第2页 / 共6页
VA 11 53 61-2011 CUSTOM FABRICATED LABORATORY EQUIPMENT.pdf_第3页
第3页 / 共6页
VA 11 53 61-2011 CUSTOM FABRICATED LABORATORY EQUIPMENT.pdf_第4页
第4页 / 共6页
VA 11 53 61-2011 CUSTOM FABRICATED LABORATORY EQUIPMENT.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、11-11 11 53 61 - 1 SECTION 11 53 61 CUSTOM FABRICATED LABORATORY EQUIPMENT SPEC WRITER NOTES: 1. Delete between / _ / if not applicable to project. 2. Also, delete other items or paragraphs not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section speci

2、fies necropsy / dissecting tables / and / animal-cage sinks /. 1.2 RELATED WORK A. Plumbing Connections: Section 22 11 00, FACILITY WATER DISTRIBUTION and / Section 22 13 00, FACILITY SANITARY SEWERAGE / Section 22 66 00, CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES /. B. Ductwork

3、: Section 23 31 00, HVAC DUCTS AND CASINGS. C. Electrical Connections: Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. D. Electrical Devices: Section 26 27 26, WIRING DEVICES. 1.3 QUALITY CONTROL A. Manufacturer Qualifications: Manufacturer regularly and presently manufactures necropsy

4、equipment. B. Electrical Components and Devices: UL listed and labeled for intended use. 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Manufacturers Literature and Data: Include illustrations and descriptions of necropsy equipment. C. Shop

5、 Drawings: Show details of installation, coordination with mechanical and electrical work, anchorage, and other work required for complete installation. D. Field Test Reports: Indicate dates and times of tests and certify test results. E. Operating Instructions: Comply with requirements in Section 0

6、1 00 00, GENERAL REQUIREMENTS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 53 61 - 2 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced

7、 in the text by the basic designation only. B. ASTM International (ASTM): E11-09 . Wire Cloth and Sieves for Testing Purposes C. National Electrical Manufacturers Association (NEMA): 250-08 . Enclosures for Electrical Equipment (1000 Volts Maximum) D. Scientific Equipment and Furniture Association (

8、SEFA): 2-10 . Recommended Practices for Installation of Scientific Laboratory Furniture and Equipment 7-10 . Fixtures PART 2 - PRODUCTS SPEC WRITER NOTE: Show types, quantities, and locations of service fixtures required for each type of necropsy unit on drawings. 2.1 NECROPSY EQUIPMENT, GENERAL A.

9、Factory install service fixtures and electrical devices in locations shown on drawings. B. Service Fixtures, General: Heavy-grade designed for mortuary use and complying with relevant requirements in SEFA 7. C. Water Service Fixtures: With integral vacuum breaker and as follows: 1. Outlet: Female, 1

10、0 mm (3/8 inch); threaded outlet for attachment of filter pumps, hose connectors, antihose nozzle, or antisplash spout ends. 2. Goosenecks: With minimum clearance of 191 mm (7-1/2 inches) between threaded outlet and top of table. Bend gooseneck 180 degrees to direct water flow vertically into sinks.

11、 Attach gooseneck to base with adapter-type connection that will permit field conversion of swing-type to fixed-type gooseneck and fixed-type to swing-type gooseneck. 3. Operation: Manual with wrist-blade handles, unless otherwise indicated. D. Pedestals: Cast brass, tapered to a round base; factory

12、 assembled and tested; and with brass shanks, brass locknuts, and washers for attaching to tops or curbs. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 53 61 - 3 SPEC WRITER NOTE: Equipment described in article below corresponds to symbol

13、“HW-800” in “Room Equipment Guide.” 2.2 DOWNDRAFT NECROPSY TABLE A. Description: Stainless-steel table with integral fittings and fixtures and downdraft capability designed to pull air down, away from operators face, and to protect from odors. B. Integral Sink Unit: Equipped with hot- and cold-water

14、 fittings, swing spout faucet, and self-closing trigger control spray head with 2438 mm (8 feet) of hose. C. Integral Drain Pan: Equipped with manual flush down manifold, sloped to one end to allow for complete drainage. D. Integral Exhaust Plenum: Equipped with a manually controlled adjustable damp

15、er, and located the full width of the rear of the table. E. Exhaust Connection: 254 mm (10 inch) diameter flange for connection to the building exhaust system. F. Filter Housing: Equipped with 99.9 percent HEPA filter. G. Waste Disposer: 560-W (3/4-hp) heavy-duty disposer and controls. H. Electrical

16、 Receptacles: One 120-V, single-phase, 15-A, hospital-grade duplex receptacle. SPEC WRITER NOTE: Equipment described in article below corresponds to symbol “HW-803“ in “Room Equipment Guide.“ 2.3 NECROPSY DISSECTING TABLE: A. Description: Stainless-steel unit with sink compartments, work tops, splas

17、h backs, disposer, and shelves. Apply sound-deadening material to underside. B. Waste Disposer: Heavy-duty, 5595-W (7-1/2-hp) commercial-type designed to dispose of type of waste normally accumulated in necropsy area and for continuous commercial use. Equip disposer with sink adaptor, silver trap, f

18、loor support, vacuum breaker, solenoid valve, flow control, motor starting switch, and motor controller. 1. Disposer Action: Subjects waste to simultaneous grinding and flushing action before discharging into building waste system. a. Discharged Materials: 1) Of a consistency to flow freely through

19、waste piping. 2) Using ASTM E 11 U.S.A standard testing sieves, 40 percent of the discharged materials passes through a 2.36 mm (0.093 inch) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 53 61 - 4 sieve, and 65 percent passes through a 6.7

20、 mm (0.265 inch) sieve. 2. Housing: Cast iron or stainless steel, with inlet opening not less than throat diameter. Provide direct water connection into grind chamber. 3. Grind Ring: Rust-resistant steel alloy, with cutting projections of teeth hardened and precision ground, and replaceable without

21、replacing housing. 4. Motor Control: Remote start-stop push-button switch in stainless-steel waterproof box mounted on dissecting table that is wired to wall-mounted prefabricated control center with the following components: a. Magnetic starter with overload and undervoltage protection. b. Solenoid

22、 valve. c. Time-delay relay. d. Control-circuit transformer. e. Flow-control interlock switch. f. Stainless-steel, NEMA 250, Type 4 enclosure. C. Equip each sink with hot- and cold-water fixtures, stainless-steel sink outlet, and chemical-resistant antisiphon drum trap with clean-out plug. SPEC WRIT

23、ER NOTE: Equipment described in article below corresponds to symbol “HW-879“ in “Room Equipment Guide.“ 2.4 ANIMAL-CAGE SCULLERY SINK AND TABLE WITH WASTE DISPOSER A. Description: Stainless-steel sink and table unit with waste disposer. B. Waste Disposer: Heavy-duty, 2238-W (3-hp), commercial-type f

24、ood waste disposer designed for continuous commercial use to dispose of cooked bones, vegetable waste, scullery waste, milk cartons, and plastic individual condiment and jelly containers. Equip disposer with cone, cover, silver trap, floor support, vacuum breaker, solenoid valve, flow control, preri

25、nse spray assembly, on-off switch, and disposer control center. 1. Disposer Action: Subjects waste to simultaneous grinding and flushing action before discharging into building waste system. a. Discharged Materials: 1) Of a consistency to flow freely through waste piping. Provided by IHSNot for Resa

26、leNo reproduction or networking permitted without license from IHS-,-,-11-11 11 53 61 - 5 2) Using ASTM E 11 U.S.A standard testing sieves, 40 percent of the discharged materials passes through a 2.36 mm (0.093 inch) sieve, and 65 percent passes through a 6.7 mm (0.265 inch) sieve. 2. Housing: Cast

27、iron or stainless steel, with inlet opening not less than throat diameter, and with direct water connection into grind chamber. 3. Grind Ring: Rust-resistant steel alloy, with hardened and precision-ground cutting teeth, and replaceable without replacing housing. 4. Cone: Fabricated from 1.3 mm (0.0

28、50 inch) thick stainless steel with top diameter of not less than 381 mm (15 inches) and depth of 203 mm (8 inches). a. Opening at bottom of cone fitted to disposer with vibration-dampening, leakproof connection. b. Equip with one or more water inlets designed to direct water stream so it will dislo

29、dge food waste and convey it into disposer. c. Equip with removable cover to fit cone flush with top of drainboard. Fabricate cover with scrap hole that is approximately 152 mm (6 inches) in diameter and is located directly over bottom opening of cone. d. Equip with removable neoprene scrapping bloc

30、k with integral sleeve, and molded neoprene ring tableware trap that fits bottom of cone. 5. Vacuum Breaker: For water connections to disposer housing and to cone. 6. Motor Control: Remote start-stop push-button switch in stainless-steel waterproof box mounted on table and wired to wall-mounted pref

31、abricated control center containing the following components: a. Magnetic starter with overload and undervoltage protection. b. Solenoid valve. c. Time-delay relay. d. Control-circuit transformer. e. Flow-control interlock switch. f. Stainless-steel, NEMA 250, Type 4 enclosure. Provided by IHSNot fo

32、r ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 53 61 - 6 PART 3 - EXECUTION 3.1 INSTALLATION A. Install necropsy equipment according to manufacturers written instructions and to comply with relevant requirements in SEFA 2. B. Install waste disposers to prevent

33、backflow of polluted water or waste into water supply system or on to work surfaces. C. Install and interconnect electrical controls and switches. 3.2 TESTS A. Field test installed necropsy equipment after water systems are pressurized for proper operation. 1. Operate each component of equipment. Du

34、ring and after testing, there shall be no evidence of leaks, electrical malfunction, or other symptom of failure. 2. For units that fail testing, make adjustments and corrections to installation, or replace necropsy equipment, and repeat tests until necropsy equipment operates properly. 3.3 PROTECTI

35、NG AND CLEANING A. Protect equipment from dirt, water, and chemical or mechanical injury during the remainder of the construction period. B. At the completion of work, clean interior equipment as required to produce ready-for-use condition. 3.4 INSTRUCTIONS Instruct personnel and transmit operating instructions in accordance with requirements in Section 01 00 00, GENERAL REQUIREMENTS. - - - E N D - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1