VA 11 53 71-2011 SOLUTION WARMING CABINETS.pdf

上传人:towelfact221 文档编号:1074826 上传时间:2019-04-06 格式:PDF 页数:3 大小:30.25KB
下载 相关 举报
VA 11 53 71-2011 SOLUTION WARMING CABINETS.pdf_第1页
第1页 / 共3页
VA 11 53 71-2011 SOLUTION WARMING CABINETS.pdf_第2页
第2页 / 共3页
VA 11 53 71-2011 SOLUTION WARMING CABINETS.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、11-11 11 53 71 - 1 SECTION 11 53 71 SOLUTION WARMING CABINETS SPEC WRITER NOTE: Delete items or paragraphs in the section that are not applicable and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies two-compartment, solution warming cabinets for warming and storing so

2、lutions in flasks. 1.2 RELATED WORK Electrical Connections: Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.3 QUALITY CONTROL A. Manufacturer Qualifications: Manufacturer regularly and presently manufactures solution warming cabinets. B. Electrical Components and Devices: UL listed an

3、d labeled for intended use. 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Manufacturers Literature and Data: Include illustrations and descriptions of solution warming cabinets. C. Field Test Reports: Indicate dates and times of tests and

4、certify test results. 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. Scientific Equipment and Furniture Association (SEFA): 2-10 . Recommended Pract

5、ices for Installation of Scientific Laboratory Furniture and Equipment PART 2 - PRODUCTS 2.1 SOLUTION WARMING CABINETS A. Description: Two-compartment, solution warming cabinets with the following characteristics: 1. Double-wall stainless-steel construction insulated with not less than 25 mm (1 inch

6、) of fiberglass or equivalent material. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS11-11 11 53 71 - 2 2. Electrically heated upper and lower compartments capable of maintaining solutions at set temperature between 49 and 57 degrees C (120 and 135 deg

7、rees F). 3. Upper-compartment capacity of not less than 20 two-liter flasks, and lower-compartment capacity of not less than 60 two-liter flasks. B. Components: 1. Door: Insulated with heat-resistant gasket for each compartment. 2. Shelving: a. One stainless-steel adjustable shelf with 6 mm (1/4 inc

8、h) minimum perforated holes in upper compartment. b. Two stainless-steel, removable, adjustable shelves in lower compartment. 3. Control: Automatic with the following components: a. Power switch. b. Heat-indicating light. c. Over temperature protection and indicating light with audible alarm. d. The

9、rmostatic temperature control. 4. Over-temperature Control: Automatically shuts off heating unit when temperature of solutions exceeds set temperature by 6 degrees C (10 degrees F). 5. Air-Circulating Fans: Maintain temperature uniformity in upper and lower compartments. PART 3 - EXECUTION 3.1 INSTA

10、LLATION Install solution warming cabinets according to manufacturers written instructions and relevant requirements in SEFA 2. 3.2 TESTS A. Field test installed solution warming cabinets to verify proper operation. 1. Test Procedure: Fill 20 two-liter flasks with water at 21 degrees C (70 degrees F)

11、, and place in upper compartment. Insert thermocouple into two center flasks and connect to recording potentiometer. 2. Test Performance: a. After 8 hours, potentiometer shall indicate temperature of 57 degrees C (135 degrees F), plus or minus 6 degrees C (10 degrees F). Provided by IHSNot for Resal

12、e-,-,-11-11 11 53 71 - 3 b. At no time during the 8-hour test period shall potentiometer indicate that the water temperature exceeded 63 degrees C (145 degrees F). B. For units that fail testing, make adjustments and corrections to installation, or replace equipment, and repeat tests until equipment

13、 complies with requirements. 3.3 PROTECTING AND CLEANING A. Protect equipment from dirt, water, and chemical or mechanical injury during the remainder of the construction period. B. At the completion of work, clean equipment as required to produce ready-for-use condition. 3.4 OPERATING INSTRUCTIONS Instruct personnel and transmit operating instructions in accordance with requirements in Section 01 00 00, GENERAL REQUIREMENTS. - - - E N D - - - Provided by IHSNot for Resale-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1