VA 21 08 00-2010 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.pdf

上传人:syndromehi216 文档编号:1074859 上传时间:2019-04-06 格式:PDF 页数:4 大小:20.97KB
下载 相关 举报
VA 21 08 00-2010 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.pdf_第1页
第1页 / 共4页
VA 21 08 00-2010 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.pdf_第2页
第2页 / 共4页
VA 21 08 00-2010 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.pdf_第3页
第3页 / 共4页
VA 21 08 00-2010 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、07-10 21 08 00 - 1 SECTION 21 08 00 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Section apply to all sections of Division 21. B. This project will have selected building systems commissioned. The complete list of equipment and systems to be

2、commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning

3、 process. 1.2 RELATED WORK A. Section 01 00 00 GENERAL REQUIREMENTS. B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. 1.3 SUMMARY A. This Section includes requirements for commissioning the Fire Suppression systems, subsystems and

4、equipment. This Section supplements the general requirements specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. B. The commissioning activities have been developed to support the VA requirements to meet guidelines for Federal Leadership in Environmental, Energy, and Economic Performan

5、ce. SPEC WRITER NOTE: Paragraph C is for LEED projects. Delete paragraph or subparagraphs as necessary for specific projects. C. The commissioning activities have been developed to support the United States Green Building Council (USGBC) LEED rating program and to support delivery of project perform

6、ance in accordance with the Contract Documents developed with the approval of the VA. 1. Commissioning activities and documentation for the LEED section on “Energy and Atmosphere” prerequisite of “Fundamental Building Systems Commissioning”. 2. Commissioning activities and documentation for the LEED

7、 section on “Energy and Atmosphere” requirements for the “Enhanced Building System Commissioning” credit. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-10 21 08 00 - 2 3. Activities and documentation for the LEED section on “Measurement and Veri

8、fication” requirements for the Measurement and Verification credit. D. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members. 1.4 DEFINITIONS A. Refer to Section 01 91

9、00 GENERAL COMMISSIONING REQUIREMENTS for definitions. 1.5 COMMISSIONED SYSTEMS A. Commissioning of a system or systems specified in this Division is part of the construction process. Documentation and testing of these systems, as well as training of the VAs Operation and Maintenance personnel, is r

10、equired in cooperation with the VA and the Commissioning Agent. SPEC WRITER NOTE: Paragraph B should list the specific systems that will be commissioned. Edit the list as necessary for specific projects. The list below should match the list included in Section 01 91 00 GENERAL COMMISSIONING REQUIREM

11、ENTS. It is recommended that the list included in Section 01 91 00 be developed first and then copied/pasted into the list below. Both lists should be identical to prevent confusion. B. The following Fire Suppression systems will be commissioned: 1. Fire Protection System (Fire pump, jockey pump, fi

12、re pump automatic transfer switch/controller, Wet-pipe fire suppression, Dry-pipe fire suppression, Pre-action fire suppression, dry system air compressors and motors, and clean agent fire suppression). 1.6 SUBMITTALS A. The commissioning process requires review of selected Submittals. The Commissio

13、ning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details. B. The commissioning process

14、 requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-

15、,-,-07-10 21 08 00 - 3 PART 2 - PRODUCTS (NOT USED) PART 3- EXECUTION 3.1 PRE-FUNCTIONAL CHECKLISTS A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The C

16、ommissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of compl

17、eted checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of com

18、pleted checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipmen

19、t will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents. 3.2 CONTRACTORS TESTS A. Contractor tests as requ

20、ired by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. The Commissioning Agent will witness selected Contractor tests. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing. 3.3 SYSTEM

21、S FUNCTIONAL PERFORMANCE TESTING: A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency con

22、ditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required Provided by IHSNot for ResaleNo re

23、production or networking permitted without license from IHS-,-,-07-10 21 08 00 - 4 labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests wer

24、e performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details. 3.4 TRAINING OF VA PERSONNEL A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized pe

25、rsonnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 21 Sections for additional Contractor training requirements. - END - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • (通史版)2020版高考历史大一轮复习专题三中国传统文化主流思想的演变和古代中国的科技文艺8汉代儒学成为正统思想课件.pptx (通史版)2020版高考历史大一轮复习专题三中国传统文化主流思想的演变和古代中国的科技文艺8汉代儒学成为正统思想课件.pptx
  • (通史版)2020版高考历史大一轮复习专题三中国传统文化主流思想的演变和古代中国的科技文艺9宋明理学课件.pptx (通史版)2020版高考历史大一轮复习专题三中国传统文化主流思想的演变和古代中国的科技文艺9宋明理学课件.pptx
  • (通史版)2020版高考历史大一轮复习专题三中国传统文化主流思想的演变和古代中国的科技文艺专题整合课件.pptx (通史版)2020版高考历史大一轮复习专题三中国传统文化主流思想的演变和古代中国的科技文艺专题整合课件.pptx
  • (通史版)2020版高考历史大一轮复习专题九20世纪以来的重大思想理论成果和现代中国的科学技术与文化教育事业2320世纪以来的中国重大思想理论成果课件.pptx (通史版)2020版高考历史大一轮复习专题九20世纪以来的重大思想理论成果和现代中国的科学技术与文化教育事业2320世纪以来的中国重大思想理论成果课件.pptx
  • (通史版)2020版高考历史大一轮复习专题九20世纪以来的重大思想理论成果和现代中国的科学技术与文化教育事业24现代中国的科学技术与文化教育事业课件.pptx (通史版)2020版高考历史大一轮复习专题九20世纪以来的重大思想理论成果和现代中国的科学技术与文化教育事业24现代中国的科学技术与文化教育事业课件.pptx
  • (通史版)2020版高考历史大一轮复习专题九20世纪以来的重大思想理论成果和现代中国的科学技术与文化教育事业专题整合课件.pptx (通史版)2020版高考历史大一轮复习专题九20世纪以来的重大思想理论成果和现代中国的科学技术与文化教育事业专题整合课件.pptx
  • (通史版)2020版高考历史大一轮复习专题二古代中国的经济结构与特点5农业的主要耕作方式、土地制度及手工业的发展课件.pptx (通史版)2020版高考历史大一轮复习专题二古代中国的经济结构与特点5农业的主要耕作方式、土地制度及手工业的发展课件.pptx
  • (通史版)2020版高考历史大一轮复习专题二古代中国的经济结构与特点6商业的发展、资本主义萌芽与“重农抑商”和“海禁”政策课件.pptx (通史版)2020版高考历史大一轮复习专题二古代中国的经济结构与特点6商业的发展、资本主义萌芽与“重农抑商”和“海禁”政策课件.pptx
  • (通史版)2020版高考历史大一轮复习专题二古代中国的经济结构与特点专题整合课件.pptx (通史版)2020版高考历史大一轮复习专题二古代中国的经济结构与特点专题整合课件.pptx
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1