1、07-10 21 08 00 - 1 SECTION 21 08 00 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Section apply to all sections of Division 21. B. This project will have selected building systems commissioned. The complete list of equipment and systems to be

2、commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning

3、 process. 1.2 RELATED WORK A. Section 01 00 00 GENERAL REQUIREMENTS. B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. 1.3 SUMMARY A. This Section includes requirements for commissioning the Fire Suppression systems, subsystems and

4、equipment. This Section supplements the general requirements specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. B. The commissioning activities have been developed to support the VA requirements to meet guidelines for Federal Leadership in Environmental, Energy, and Economic Performan

5、ce. SPEC WRITER NOTE: Paragraph C is for LEED projects. Delete paragraph or subparagraphs as necessary for specific projects. C. The commissioning activities have been developed to support the United States Green Building Council (USGBC) LEED rating program and to support delivery of project perform

6、ance in accordance with the Contract Documents developed with the approval of the VA. 1. Commissioning activities and documentation for the LEED section on “Energy and Atmosphere” prerequisite of “Fundamental Building Systems Commissioning”. 2. Commissioning activities and documentation for the LEED

7、 section on “Energy and Atmosphere” requirements for the “Enhanced Building System Commissioning” credit. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-10 21 08 00 - 2 3. Activities and documentation for the LEED section on “Measurement and Veri

8、fication” requirements for the Measurement and Verification credit. D. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members. 1.4 DEFINITIONS A. Refer to Section 01 91

9、00 GENERAL COMMISSIONING REQUIREMENTS for definitions. 1.5 COMMISSIONED SYSTEMS A. Commissioning of a system or systems specified in this Division is part of the construction process. Documentation and testing of these systems, as well as training of the VAs Operation and Maintenance personnel, is r

10、equired in cooperation with the VA and the Commissioning Agent. SPEC WRITER NOTE: Paragraph B should list the specific systems that will be commissioned. Edit the list as necessary for specific projects. The list below should match the list included in Section 01 91 00 GENERAL COMMISSIONING REQUIREM

11、ENTS. It is recommended that the list included in Section 01 91 00 be developed first and then copied/pasted into the list below. Both lists should be identical to prevent confusion. B. The following Fire Suppression systems will be commissioned: 1. Fire Protection System (Fire pump, jockey pump, fi

12、re pump automatic transfer switch/controller, Wet-pipe fire suppression, Dry-pipe fire suppression, Pre-action fire suppression, dry system air compressors and motors, and clean agent fire suppression). 1.6 SUBMITTALS A. The commissioning process requires review of selected Submittals. The Commissio

13、ning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details. B. The commissioning process

14、 requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-

15、07-10 21 08 00 - 3 PART 2 - PRODUCTS (NOT USED) PART 3- EXECUTION 3.1 PRE-FUNCTIONAL CHECKLISTS A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The C

16、ommissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of compl

17、eted checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of com

18、pleted checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipmen

19、t will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents. 3.2 CONTRACTORS TESTS A. Contractor tests as requ

20、ired by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. The Commissioning Agent will witness selected Contractor tests. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing. 3.3 SYSTEM

21、S FUNCTIONAL PERFORMANCE TESTING: A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency con

22、ditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required Provided by IHSNot for ResaleNo re

23、production or networking permitted without license from IHS-,-,-07-10 21 08 00 - 4 labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests wer

24、e performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details. 3.4 TRAINING OF VA PERSONNEL A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized pe

25、rsonnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 21 Sections for additional Contractor training requirements. - END - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GME 60209-2013 Determination of Porosity or Coatings on Ferrous Materials (Revision 2 English German This standard may be applied only for current programs It is inactive for all f.pdf GME 60209-2013 Determination of Porosity or Coatings on Ferrous Materials (Revision 2 English German This standard may be applied only for current programs It is inactive for all f.pdf
  • GME 60210-2012 Test Method for Determining Resistance of Organic Coatings to Hot Water Immersion (Revision 2 English German This standard may be applied only for current programs Iho.pdf GME 60210-2012 Test Method for Determining Resistance of Organic Coatings to Hot Water Immersion (Revision 2 English German This standard may be applied only for current programs Iho.pdf
  • GME 60213-2011 Determination of Resistance to Corrosion of Aluminum Radiators by Sea Water Acetic Acid Test (SWAAT) (Issue 2 English German This standard may be applied only for cul .pdf GME 60213-2011 Determination of Resistance to Corrosion of Aluminum Radiators by Sea Water Acetic Acid Test (SWAAT) (Issue 2 English German This standard may be applied only for cul .pdf
  • GME 60232-2007 Force-Deflection Characteristics of Elastomeric Components under Uni-axial Stress (English German This specification may be applied only for current projects incl Gll f.pdf GME 60232-2007 Force-Deflection Characteristics of Elastomeric Components under Uni-axial Stress (English German This specification may be applied only for current projects incl Gll f.pdf
  • GME 60233-2008 Force-Deflection Characteristics of Elastomeric Components under Bi-axial Stress (English German This standard may be applied only for current projects incl Global Ere .pdf GME 60233-2008 Force-Deflection Characteristics of Elastomeric Components under Bi-axial Stress (English German This standard may be applied only for current projects incl Global Ere .pdf
  • GME 60243-2009 Determination of Tension Set under Constant Elongation (English German This standard may be applied only for current projects It is Superceded for all global future .pdf GME 60243-2009 Determination of Tension Set under Constant Elongation (English German This standard may be applied only for current projects It is Superceded for all global future .pdf
  • GME 60248-2010 Scraping of Coatings on Elastomers and Textile Interior Materials (Revision 5 English German Includes Appendix A and B This standard may be applied only for current u.pdf GME 60248-2010 Scraping of Coatings on Elastomers and Textile Interior Materials (Revision 5 English German Includes Appendix A and B This standard may be applied only for current u.pdf
  • GME 60252-2009 The Determination of Indentation Hardness by Means of a Durometer (Shore A and D) (English German This standard may be applied only for current projects It is Supercced.pdf GME 60252-2009 The Determination of Indentation Hardness by Means of a Durometer (Shore A and D) (English German This standard may be applied only for current projects It is Supercced.pdf
  • GME 60258-2009 Accelerated Ageing Test for Elastomers (English German This standard may be applied only for current projects It is Superceded for all global future projects and rep.pdf GME 60258-2009 Accelerated Ageing Test for Elastomers (English German This standard may be applied only for current projects It is Superceded for all global future projects and rep.pdf