1、 IEC 61280-4-1 Edition 2.0 2009-06 INTERNATIONAL STANDARD NORME INTERNATIONALE Fibre-optic communication subsystem test procedures Part 4-1: Installed cable plant Multimode attenuation measurement Procdures dessai des sous-systmes de tlcommunication fibres optiques Partie 4-1: Installations cbles Me
2、sure de laffaiblissement en multimodal IEC 61280-4-1:2009 colour inside THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright 2009 IEC, Geneva, Switzerland All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic o
3、r mechanical, including photocopying and microfilm, without permission in writing from either IEC or IECs member National Committee in the country of the requester. If you have any questions about IEC copyright or have an enquiry about obtaining additional rights to this publication, please contact
4、the address below or your local IEC member National Committee for further information. Droits de reproduction rservs. Sauf indication contraire, aucune partie de cette publication ne peut tre reproduite ni utilise sous quelque forme que ce soit et par aucun procd, lectronique ou mcanique, y compris
5、la photocopie et les microfilms, sans laccord crit de la CEI ou du Comit national de la CEI du pays du demandeur. Si vous avez des questions sur le copyright de la CEI ou si vous dsirez obtenir des droits supplmentaires sur cette publication, utilisez les coordonnes ci-aprs ou contactez le Comit nat
6、ional de la CEI de votre pays de rsidence. IEC Central Office 3, rue de Varemb CH-1211 Geneva 20 Switzerland Email: inmailiec.ch Web: www.iec.ch About the IEC The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes International Standards fo
7、r all electrical, electronic and related technologies. About IEC publications The technical content of IEC publications is kept under constant review by the IEC. Please make sure that you have the latest edition, a corrigenda or an amendment might have been published. Catalogue of IEC publications:
8、www.iec.ch/searchpub The IEC on-line Catalogue enables you to search by a variety of criteria (reference number, text, technical committee,). It also gives information on projects, withdrawn and replaced publications. IEC Just Published: www.iec.ch/online_news/justpub Stay up to date on all new IEC
9、publications. Just Published details twice a month all new publications released. Available on-line and also by email. Electropedia: www.electropedia.org The worlds leading online dictionary of electronic and electrical terms containing more than 20 000 terms and definitions in English and French, w
10、ith equivalent terms in additional languages. Also known as the International Electrotechnical Vocabulary online. Customer Service Centre: www.iec.ch/webstore/custserv If you wish to give us your feedback on this publication or need further assistance, please visit the Customer Service Centre FAQ or
11、 contact us: Email: csciec.ch Tel.: +41 22 919 02 11 Fax: +41 22 919 03 00 A propos de la CEI La Commission Electrotechnique Internationale (CEI) est la premire organisation mondiale qui labore et publie des normes internationales pour tout ce qui a trait llectricit, llectronique et aux technologies
12、 apparentes. A propos des publications CEI Le contenu technique des publications de la CEI est constamment revu. Veuillez vous assurer que vous possdez ldition la plus rcente, un corrigendum ou amendement peut avoir t publi. Catalogue des publications de la CEI: www.iec.ch/searchpub/cur_fut-f.htm Le
13、 Catalogue en-ligne de la CEI vous permet deffectuer des recherches en utilisant diffrents critres (numro de rfrence, texte, comit dtudes,). Il donne aussi des informations sur les projets et les publications retires ou remplaces. Just Published CEI: www.iec.ch/online_news/justpub Restez inform sur
14、les nouvelles publications de la CEI. Just Published dtaille deux fois par mois les nouvelles publications parues. Disponible en-ligne et aussi par email. Electropedia: www.electropedia.org Le premier dictionnaire en ligne au monde de termes lectroniques et lectriques. Il contient plus de 20 000 ter
15、mes et dfinitions en anglais et en franais, ainsi que les termes quivalents dans les langues additionnelles. Egalement appel Vocabulaire Electrotechnique International en ligne. Service Clients: www.iec.ch/webstore/custserv/custserv_entry-f.htm Si vous dsirez nous donner des commentaires sur cette p
16、ublication ou si vous avez des questions, visitez le FAQ du Service clients ou contactez-nous: Email: csciec.ch Tl.: +41 22 919 02 11 Fax: +41 22 919 03 00 IEC 61280-4-1 Edition 2.0 2009-06 INTERNATIONAL STANDARD NORME INTERNATIONALE Fibre-optic communication subsystem test procedures Part 4-1: Inst
17、alled cable plant Multimode attenuation measurement Procdures dessai des sous-systmes de tlcommunication fibres optiques Partie 4-1: Installations cbles Mesure de laffaiblissement en multimodal INTERNATIONAL ELECTROTECHNICAL COMMISSION COMMISSION ELECTROTECHNIQUE INTERNATIONALE XB ICS 33.180.01 PRIC
18、E CODE CODE PRIX ISBN 978-2-88912-046-8 Registered trademark of the International Electrotechnical Commission Marque dpose de la Commission Electrotechnique Internationale colour inside 2 61280-4-1 IEC:2009 CONTENTS FOREWORD.5 1 Scope.7 2 Normative references .7 3 Terms, definitions, graphical symbo
19、ls and acronyms 8 3.1 Terms and definitions 8 3.2 Graphical symbols.9 3.3 Acronyms 11 4 Measurement methods .11 4.1 General .11 4.2 Cabling configurations and applicable test methods 12 4.3 Overview of uncertainties 12 4.3.1 General .12 4.3.2 Test cords .13 4.3.3 Launch conditions at the connection
20、to the cabling under test .13 4.3.4 Optical source .13 4.3.5 Output power reference .13 4.3.6 Received power reference .14 5 Apparatus.14 5.1 General .14 5.2 Light source 14 5.2.1 Stability .14 5.2.2 Spectral characteristics .14 5.2.3 Launch cord 14 5.3 Receive or tail cord .15 5.4 Substitution/dumm
21、y cord .15 5.5 Power meter LSPM methods only.15 5.6 OTDR apparatus .15 5.7 Connector end-face cleaning and inspection equipment 16 5.8 Adapters .16 6 Procedures.16 6.1 General .16 6.2 Common procedures .17 6.2.1 Care of the test cords 17 6.2.2 Make reference measurements (LSPM methods only) .17 6.2.
22、3 Inspect and clean the ends of the fibres in the cabling.17 6.2.4 Make the measurements17 6.2.5 Make the calculations 17 6.3 Calibration.17 6.4 Safety .17 7 Calculations .17 8 Documentation .18 8.1 Information for each test18 8.2 Information to be available 18 Annex A (normative) One-cord reference
23、 method.19 Annex B (normative) Three-cord reference method21 61280-4-1 IEC:2009 3 Annex C (normative) Two-cord reference method 23 Annex D (normative) Optical time domain reflectometer.26 Annex E (normative) Requirements for the source characteristics for multimode measurement .32 Annex F (informati
24、ve) Measurement uncertainty examples.35 Annex G (informative) OTDR configuration information44 Annex H (informative) Test cord insertion loss verification .53 Bibliography61 Figure 1a Socket and plug assembly10 Figure 1b Connector set (plug, adapter, plug) 10 Figure 1c Light source .10 Figure 1d Pow
25、er meter.10 Figure 1 Connector symbols 10 Figure 2 Symbol for cabling under test.10 Figure 3 OTDR schematic16 Figure A.1 Reference measurement.20 Figure A.2 Test measurement 20 Figure B.1 Reference measurement.22 Figure B.2 Test measurement 22 Figure C.1 Reference measurement.24 Figure C.2 Test meas
26、urement24 Figure C.3 Test measurement for plug-socket style connectors24 Figure D.1 Test measurement for Method D.27 Figure D.2 Location of the cabling under test ports 28 Figure D.3 Graphic construction of F 1 and F 2 .29 Figure D.4 Graphic construction of F 1 , F 11 , F 12 and F 2 30 Figure E.1 En
27、circled flux template example33 Figure F.1 Initial power measurement 37 Figure F.2 Verification of reference grade connection 38 Figure F.3 Two offset splices .38 Figure F.4 Five offset splices .38 Figure F.5 EF centred40 Figure F.6 EF underfilling.40 Figure F.7 EF overfilling.41 Figure F.8 L1 loss
28、with mandrel .41 Figure F.9 L1 loss with mandrel and mode conditioner.42 Figure F.10 L2 loss (adjusted) with mandrel.42 Figure F.11 L2 loss (adjusted) with mandrel and mode conditioning.42 Figure F.12 L3 loss (adjusted) with mandrel.43 Figure F.13 L3 loss (adjusted) with mandrel and mode conditionin
29、g.43 Figure G.1 Splice and macro bend attenuation measurement.47 Figure G.2 Attenuation measurement with high reflection connectors.48 4 61280-4-1 IEC:2009 Figure G.3 Attenuation measurement of a short length cabling.49 Figure G.4 OTDR trace with ghost .50 Figure G.5 Cursors positioning.51 Figure H.
30、1 Obtaining reference power level P 0 .54 Figure H.2 Obtaining power level P 1 55 Figure H.3 Obtaining reference power level P 0 .56 Figure H.4 Obtaining power level P 1 56 Figure H.5 Obtaining reference power level P 0 .57 Figure H.6 Obtaining power level .57 Figure H.7 Obtaining reference power le
31、vel P 0 .58 Figure H.8 Obtaining power level P 1 58 Figure H.9 Obtaining power level P 5 58 Figure H.10 Obtaining reference power level P 0 .59 Figure H.11 Obtaining power level P 1 .59 Table 1 Cabling configurations.12 Table 2 Test methods and configurations.12 Table 3 Spectral requirements .14 Tab
32、le E.1 Threshold tolerance .33 Table E.2 EF requirements for 50 m core fibre cabling at 850 nm 34 Table E.3 EF requirements for 50 m core fibre cabling at 1 300 nm .34 Table E.4 EF requirements for 62,5 m core fibre cabling at 850 nm .34 Table E.5 EF requirements for 62,5 m core fibre cabling at 1 3
33、00 nm.34 Table F.1 Expected loss for examples (note 1).35 Table G.1 Default effective group index of refraction values.46 61280-4-1 IEC:2009 5 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ FIBRE-OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES Part 4-1: Installed cable plant Multimode attenuation measure
34、ment FOREWORD 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all questions concerning standardization i
35、n the electrical and electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their preparation is entrus
36、ted to technical committees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work. International, governmental and non- governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the Interna
37、tional Organization for Standardization (ISO) in accordance with conditions determined by agreement between the two organizations. 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since ea
38、ch technical committee has representation from all interested IEC National Committees. 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of I
39、EC Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user. 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in th
40、eir national and regional publications. Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter. 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity assess
41、ment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any services carried out by independent certification bodies. 6) All users should ensure that they have the latest edition of this publication. 7) No liability shall attach to IEC or its directors, employ
42、ees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and expenses arising out of the
43、publication, use of, or reliance upon, this IEC Publication or any other IEC Publications. 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is indispensable for the correct application of this publication. 9) Attention is drawn to the po
44、ssibility that some of the elements of this IEC Publication may be the subject of patent rights. IEC shall not be held responsible for identifying any or all such patent rights. International Standard IEC 61280-4-1 has been prepared by subcommittee 86C: Fibre optic systems and active devices, of IEC
45、 technical committee 86: Fibre optics. This second edition cancels and replaces the first edition, published in 2003, and constitutes a technical revision. The main changes with respect to the previous edition are listed below: An additional measurement method based on optical time domain reflectome
46、try (OTDR) is documented, with guidance on best practice in using the OTDR and interpreting OTDR traces. The requirement for the sources used to measure multimode fibres is changed from one based on coupled power ratio (CPR) and mandrel requirement to one based on measurements of the near field at t
47、he output of the launching test cord. 6 61280-4-1 IEC:2009 Highlighting the importance of, and giving guidance on, good measurement practices including cleaning and inspection of connector end faces. This bilingual version (2010-07) replaces the English version. The text of this standard is based on
48、 the following documents: FDIS Report on voting 86C/879/FDIS 86C/892/RVD Full information on the voting for the approval of this standard can be found in the report on voting indicated in the above table. The French version of this standard has not been voted upon. This publication has been drafted in accordance with the ISO/IEC Directives, Part 2. A list of all the parts in the IEC 61280 series, under the general title Fibre-optic communication subsystem test procedure, can be found on the IEC website. For the Part 4, the new subtitle will be Installed cable plant. Subtitles of existin