IEEE 1095-2012 en Guide for the Installation of Vertical Generators and Generator Motors for Hydroelectric Applications《水电用立式发电机和发电机 电动机安装用IEEE指南》.pdf

上传人:livefirmly316 文档编号:1248021 上传时间:2019-09-02 格式:PDF 页数:52 大小:652.61KB
下载 相关 举报
IEEE 1095-2012 en Guide for the Installation of Vertical Generators and Generator Motors for Hydroelectric Applications《水电用立式发电机和发电机 电动机安装用IEEE指南》.pdf_第1页
第1页 / 共52页
IEEE 1095-2012 en Guide for the Installation of Vertical Generators and Generator Motors for Hydroelectric Applications《水电用立式发电机和发电机 电动机安装用IEEE指南》.pdf_第2页
第2页 / 共52页
IEEE 1095-2012 en Guide for the Installation of Vertical Generators and Generator Motors for Hydroelectric Applications《水电用立式发电机和发电机 电动机安装用IEEE指南》.pdf_第3页
第3页 / 共52页
IEEE 1095-2012 en Guide for the Installation of Vertical Generators and Generator Motors for Hydroelectric Applications《水电用立式发电机和发电机 电动机安装用IEEE指南》.pdf_第4页
第4页 / 共52页
IEEE 1095-2012 en Guide for the Installation of Vertical Generators and Generator Motors for Hydroelectric Applications《水电用立式发电机和发电机 电动机安装用IEEE指南》.pdf_第5页
第5页 / 共52页
点击查看更多>>
资源描述

1、 IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric Applications Sponsored by the Energy Development and Power Generation Committee IEEE 3 Park Avenue New York, NY 10016-5997 USA 20 June 2012 IEEE Power +1 978 750 8400. Permission to photocopy portions of a

2、ny individual standard for educational classroom use can also be obtained through the Copyright Clearance Center. Copyright 2012 IEEE. All rights reserved. ivNotice to users Laws and regulations Users of IEEE Standards documents should consult all applicable laws and regulations. Compliance with the

3、 provisions of any IEEE Standards document does not imply compliance to any applicable regulatory requirements. Implementers of the standard are responsible for observing or referring to the applicable regulatory requirements. IEEE does not, by the publication of its standards, intend to urge action

4、 that is not in compliance with applicable laws, and these documents may not be construed as doing so. Copyrights This document is copyrighted by the IEEE. It is made available for a wide variety of both public and private uses. These include both use, by reference, in laws and regulations, and use

5、in private self-regulation, standardization, and the promotion of engineering practices and methods. By making this document available for use and adoption by public authorities and private users, the IEEE does not waive any rights in copyright to this document. Updating of IEEE documents Users of I

6、EEE Standards documents should be aware that these documents may be superseded at any time by the issuance of new editions or may be amended from time to time through the issuance of amendments, corrigenda, or errata. An official IEEE document at any point in time consists of the current edition of

7、the document together with any amendments, corrigenda, or errata then in effect. In order to determine whether a given document is the current edition and whether it has been amended through the issuance of amendments, corrigenda, or errata, visit the IEEE-SA Website at http:/standards.ieee.org/inde

8、x.html or contact the IEEE at the address listed previously. For more information about the IEEE Standards Association or the IEEE standards development process, visit IEEE-SA Website at http:/standards.ieee.org/index.html. Errata Errata, if any, for this and all other standards can be accessed at t

9、he following URL: http:/standards.ieee.org/findstds/errata/index.html. Users are encouraged to check this URL for errata periodically. Patents Attention is called to the possibility that implementation of this standard may require use of subject matter covered by patent rights. By publication of thi

10、s standard, no position is taken by the IEEE with respect to the existence or validity of any patent rights in connection therewith. If a patent holder or patent applicant has filed a statement of assurance via an Accepted Letter of Assurance, then the statement is listed on the IEEE-SA Website at h

11、ttp:/standards.ieee.org/about/sasb/patcom/patents.html. Letters of Assurance may indicate whether the Submitter is willing or unwilling to grant licenses under patent rights without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair

12、discrimination to applicants desiring to obtain such licenses. Copyright 2012 IEEE. All rights reserved. vEssential Patent Claims may exist for which a Letter of Assurance has not been received. The IEEE is not responsible for identifying Essential Patent Claims for which a license may be required,

13、for conducting inquiries into the legal validity or scope of Patents Claims, or determining whether any licensing terms or conditions provided in connection with submission of a Letter of Assurance, if any, or in any licensing agreements are reasonable or non-discriminatory. Users of this standard a

14、re expressly advised that determination of the validity of any patent rights, and the risk of infringement of such rights, is entirely their own responsibility. Further information may be obtained from the IEEE Standards Association. Copyright 2012 IEEE. All rights reserved. viParticipants At the ti

15、me this IEEE guide was completed, the Hydro Generator Installation Working Group had the following membership: Lucas A. Kunz, Chair Ronald F. Krohn, Vice Chair Jay Anders David Apps Terry Bauman Steven Brockschink Rostyslaw Fostiak George Girgis Randall C. Groves David Kornegay Douglas B. Seely Phil

16、ip Spotts Wayne Timm John Yale When the IEEE Standards Board approved this guide on December 6, 1989, the Working Group had the following membership: F. L. Brennan D. L. Evans P. S. Johrde Don G. McLaren David J. Parker M. S. Pierce D. H. Thomas The following members of the individual balloting comm

17、ittee voted on this guide. Balloters may have voted for approval, disapproval, or abstention: William J. Ackerman Thomas Bishop Steven Brockschink Chris Brooks Andrew Brown Gustavo Brunello Matthew Davis Gary Donner James Dymond Ahmed El Serafi Gary Engmann Rostyslaw Fostiak Charles Grose Randall C.

18、 Groves James Gurney Gary Heuston Joseph L. Koepfinger David Kornegay Jim Kulchisky Lucas A. Kunz Chung-Yiu Lam Charles Lennon Lawrence Long Greg Luri Don G. McLaren Charles Millet Michael S. Newman Howard Penrose Christopher Petrola Alvaro Portillo Bartien Sayogo Douglas B. Seely Gil Shultz James S

19、mith Philip Spotts Gary Stoedter Wayne Timm Remi Tremblay John Vergis James Wilson John Yale When the IEEE-SA Standards Board approved this guide on 29 March 2012, it had the following membership: Richard H. Hulett, Chair John Kulick, Vice Chair Robert M. Grow, Past President Judith Gorman, Secretar

20、y Satish Aggarwal Masayuki Ariyoshi Peter Balma William Bartley Ted Burse Clint Chaplin Wael Diab Jean-Philippe Faure Alexander Gelman Paul Houz Jim Hughes Young Kyun Kim Copyright 2012 IEEE. All rights reserved. viiJoseph L. Koepfinger* John Kulick David J. Law Thomas Lee Hung Ling Oleg Logvinov Te

21、d Olsen Gary Robinson Jon Walter Rosdahl Mike Seavey Yatin Trivedi Phil Winston Yu Yuan *Member Emeritus Also included are the following nonvoting IEEE-SA Standards Board liaisons: Richard DeBlasio, DOE Representative Michael Janezic, NIST Representative Julie Alessi IEEE Standards Program Manager,

22、Document Development Malia Zaman IEEE Standards Program Manager, Technical Program Development Copyright 2012 IEEE. All rights reserved. viiiIntroduction This introduction is not part of IEEE Std 1095-2012, IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric

23、 Applications. Large hydraulic turbine-driven generators are shipped as components and completely assembled and installed at the site. The installation, therefore, becomes a continuation of the manufacturing process, and many of the operations involved are those that are normally performed in the fa

24、ctory on smaller generators. Close tolerances must be maintained in the fit and alignment of the various parts. The use of proper installation procedures is essential to achieve satisfactory operation of the unit. This guide, originally intended for new construction, continued to be useful whenever

25、the generator rotor or turbine is reinstalled in its operating placement, following removal for maintenance or repair. This guide incorporates much of the information previously found in the National Electrical Manufacturers Association (NEMA) publication MG 5.2, Installation of Vertical Hydraulic-T

26、urbine-Driven Generators and Reversible Generator/Motors for Pumped Storage Installations. MG 5.2 was originally issued in 1972 and revised in 1975 and 1977. NEMA sponsorship was withdrawn and MG 5.2 was rescinded in September, 1982. The Hydroelectric Power Subcommittee felt that this guide continue

27、d to provide usefulness to the hydropower industry and in 1985 decided to undertake the maintenance of this guide for the benefit of the body of users. In 2006, the Hydroelectric Power Subcommittee decided to review this guide to address significant technology changes impacting the installation of v

28、ertical generators and generator motors for hydroelectric applications that have occurred since this guide was originally prepared. Guidelines contained in this document were harmonized with current international practices. Copyright 2012 IEEE. All rights reserved. ixContents 1. Overview 1 1.1 Scope

29、 . 1 1.2 Purpose 1 2. Normative references 2 3. Tools and facilities . 2 3.1 General 2 3.2 Erection contractor-supplied tools. 2 3.3 Manufacturer-supplied tools 3 3.4 Customer-supplied materials, services, and facilities 4 4. Personnel 4 5. Generator construction . 4 5.1 General arrangement 5 5.2 St

30、ator construction. 7 5.3 Rotor construction . 8 5.4 Shaft and coupling. 9 5.5 Thrust bearing 9 5.6 Guide bearings. 11 5.7 Brakes and jacks 11 5.8 Field assembly requirements . 12 6. Preparation of generator and turbine shafts in factory 13 6.1 Factory preassembly and alignment 13 6.2 Field alignment

31、 13 7. Installation precautions. 13 7.1 Position references. 13 7.2 Handling of generator parts . 13 7.3 Matching of parts. 14 7.4 Use of plumb lines. 14 7.5 Precautions in welding. 14 7.6 Cleanliness. 14 7.7 Record keeping 15 8. Receiving, storing, and unpacking . 15 8.1 Receiving. 15 8.2 Storing .

32、 16 8.3 Unpacking 18 9. Erection procedures 18 9.1 General 18 9.2 Generator shipped completely assembled 19 9.3 Generator assembled in the field, thrust bearing above the rotor, spring type or self-equalizing type thrust bearing . 19 9.4 Generator assembled in the field, thrust bearing above the rot

33、or, adjustable-shoe type thrust bearing. 20 9.5 Generator assembled in the field, thrust bearing below the rotor, spring type or self-equalizing thrust bearing. 22 Copyright 2012 IEEE. All rights reserved. x9.6 Generator assembled in the field, thrust bearing below the rotor, adjustable-shoe type th

34、rust bearing 23 10. Details of erection procedures 24 10.1 Placing of foundation bolts 24 10.2 Positioning and grouting of soleplates. 25 10.3 Assembly of stator . 25 10.4 Assembly of rotor 26 10.5 Assembly of thrust bearing 29 10.6 Assembly of guide bearings. 29 10.7 Installation of lubrication sys

35、tem. 30 10.8 Checking air gap 30 10.9 Check of insulation against shaft currents . 30 10.10 Closing of generator-turbine coupling. 31 10.11 Shaft-plumb and straightness check 31 10.12 Equalizing the load on adjustable-shoe type bearings . 31 10.13 Check of shaft runout. 32 10.14 Assembly of collecto

36、r rings and brush rigging 32 10.15 Assembly of rotating dc or brushless exciters . 32 10.16 Installation of instruments and relays 33 11. Mechanical run . 33 11.1 General 33 11.2 Preparation for initial start. 33 11.3 Initial start 34 11.4 Check of shaft runout. 34 12. Balancing 35 13. Insulation te

37、sting and drying out 35 13.1 Measurement of winding insulation resistance 35 13.2 Drying out of windings 36 13.3 High-potential tests 36 14. Initial operation 37 14.1 No-load operation with excitation . 37 14.2 Connection to power system 37 14.3 Load rejection tests 37 14.4 Operation check of vibrat

38、ion and shaft runout 38 15. Field tests 38 15.1 Vertical hydraulic-turbine generator shaft runout tolerances, installation check. 38 15.2 Electrical tests 39 Annex A (informative) Bibliography 40 Copyright 2012 IEEE. All rights reserved. 1IEEE Guide for the Installation of Vertical Generators and Ge

39、nerator/Motors for Hydroelectric Applications IMPORTANT NOTICE: IEEE Standards documents are not intended to ensure safety, health, or environmental protection, or ensure against interference with or from other devices or networks. Implementers of IEEE Standards documents are responsible for determi

40、ning and complying with all appropriate safety, security, environmental, health, and interference protection practices and all applicable laws and regulations. This IEEE document is made available for use subject to important notices and legal disclaimers. These notices and disclaimers appear in all

41、 publications containing this document and may be found under the heading “Important Notice” or “Important Notices and Disclaimers Concerning IEEE Documents.” They can also be obtained on request from IEEE or viewed at http:/standards.ieee.org/IPR/disclaimers.html. 1. Overview 1.1 Scope The procedur

42、es for installation described in this guide apply to all types of synchronous generators and generator/motors rated 5 MVA and above to be coupled to hydraulic turbines or hydraulic pump/turbines having vertical shafts. 1.2 Purpose Large hydraulic turbine-driven generators are shipped as components a

43、nd completely assembled and installed at the site. The installation, therefore, becomes a continuation of the manufacturing process, and many of the operations involved are those that are normally performed in the factory on smaller generators. Close tolerances must be maintained in the fit and alig

44、nment of the various parts. The use of proper installation procedures is essential to achieve satisfactory operation of the unit. IEEE Std 1095-2012 IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric Applications Copyright 2012 IEEE. All rights reserved. 22

45、. Normative references The following referenced documents are indispensable for the application of this document (i.e., they must be understood and used, so each referenced document is cited in text and its relationship to this document is explained). For dated references, only the edition cited app

46、lies. For undated references, the latest edition of the referenced document (including any amendments or corrigenda) applies. IEC 60034-1, Rotating Electrical Machines - Part 1: Rating and Performance.1IEC 60034-7, Rotating Electrical Machines - Part 7: Classification of Types of Construction and Mo

47、unting Arrangements (IM Code).IEEE Std 43TM, IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery.2IEEE Std 115TM, IEEE Guide: Test Procedures for Synchronous Machines.IEEE Std 421.3TM, IEEE Standard for High Potential Test Requirements for Excitation Systems for Synchro

48、nous Machines. IEEE Std 810TM, IEEE Standard for Hydraulic Turbine and Generator Integrally Forged Shaft Couplings and Shaft Runout Tolerances. IEEE Std C50.12TM, IEEE Standard for Salient-Pole 50 Hz and 60 Hz Synchronous Generators and Generator/Motors for Hydraulic Turbine Applications Rated 5 MVA

49、 and Above. 3. Tools and facilities 3.1 General In general, the erector should have the complement of necessary tools and materials ready for use prior to the start of installation. Considerable time and money can be lost if these items are not ready when needed. The responsibility for the supply of erection tools and materials falls into the following main categories: a) Those supplied by the erector b) Those supplied by the manufacturer c) Those supplied by the customer The following subclauses will briefly describe these categories and will act as a guide for a t

展开阅读全文
相关资源
  • IEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdfIEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdf
  • IEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdfIEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdf
  • IEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdfIEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdf
  • IEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdfIEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdf
  • IEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdfIEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdf
  • IEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdfIEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdf
  • IEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdfIEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdf
  • IEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdfIEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdf
  • IEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdfIEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdf
  • IEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdfIEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdf
  • 猜你喜欢
  • BS 7855-1-1996 Metric rivets for the attachment of friction linings - Specification for semi-tubular rivets《磨擦片衬里的附件用公制铆钉 半管状铆钉规范》.pdf BS 7855-1-1996 Metric rivets for the attachment of friction linings - Specification for semi-tubular rivets《磨擦片衬里的附件用公制铆钉 半管状铆钉规范》.pdf
  • BS 7856-2017 Specification for special design and other features of alternating current watthour meters for active energy for use in the UK (Accuracy Classes A and B)《在英国使用的有功电量用交流.pdf BS 7856-2017 Specification for special design and other features of alternating current watthour meters for active energy for use in the UK (Accuracy Classes A and B)《在英国使用的有功电量用交流.pdf
  • BS 7858-2012 Security screening of individuals employed in a security environment Code of practice《安全环境使用人员的安全屏蔽 实施规程》.pdf BS 7858-2012 Security screening of individuals employed in a security environment Code of practice《安全环境使用人员的安全屏蔽 实施规程》.pdf
  • BS 7861-1-2007 Strata reinforcement nsupport system ncomponents used in coal nmines – nPart 1 Specification for rockbolting《煤矿用地层加强支持系统部件 岩石锚栓规范》.pdf BS 7861-1-2007 Strata reinforcement nsupport system ncomponents used in coal nmines – nPart 1 Specification for rockbolting《煤矿用地层加强支持系统部件 岩石锚栓规范》.pdf
  • BS 7861-2-2009 Strata reinforcement support systems components used in coal mines - Specification for flexible systems for roof reinforcement《煤矿用地层支撑系统部件 屋顶加固用柔性系统规范》.pdf BS 7861-2-2009 Strata reinforcement support systems components used in coal mines - Specification for flexible systems for roof reinforcement《煤矿用地层支撑系统部件 屋顶加固用柔性系统规范》.pdf
  • BS 7863-2009 Recommendations for colour coding to indicate the extinguishing media contained in portable fire extinguishers《便携灭火器中灭火介质指示色码的推荐规程》.pdf BS 7863-2009 Recommendations for colour coding to indicate the extinguishing media contained in portable fire extinguishers《便携灭火器中灭火介质指示色码的推荐规程》.pdf
  • BS 7865-1997 Specification for steel electrical conductor rail for railway motive power supply《铁路供电用导电钢轨规范》.pdf BS 7865-1997 Specification for steel electrical conductor rail for railway motive power supply《铁路供电用导电钢轨规范》.pdf
  • BS 7867-1997 Specification for portable fire extinguishers for use in aircraft《航空用便携式灭火器规范》.pdf BS 7867-1997 Specification for portable fire extinguishers for use in aircraft《航空用便携式灭火器规范》.pdf
  • BS 7868-1996 Guide for calibration tapes for broadcast VTRs《广播磁带录像机校准带指南》.pdf BS 7868-1996 Guide for calibration tapes for broadcast VTRs《广播磁带录像机校准带指南》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > IEC

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1