IEEE NESCIR579-2016 en National Electrical Safety Code《国家电气安全规范》.pdf

上传人:visitstep340 文档编号:1249380 上传时间:2019-09-02 格式:PDF 页数:2 大小:119.18KB
下载 相关 举报
IEEE NESCIR579-2016 en National Electrical Safety Code《国家电气安全规范》.pdf_第1页
第1页 / 共2页
IEEE NESCIR579-2016 en National Electrical Safety Code《国家电气安全规范》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 1 Copyright 2016 IEEE. All rights reserved. Interpretation Section 11. Protective arrangements in electric supply stations Rule 110A General requirements Enclosure of equipment (2012 Edition, page 36) (24 May 2016) IR579 Question: An Interpretation from the NESC is requested on the following: Are f

2、ences around solar farms required to be grounded by NESC Rules? Duke Energy owns a solar farm that was designed and built by a firm that designs and builds solar farms. The facilities were designed and installed per National Electrical Code(NEC) requirements. Because the utility owns the solar farm,

3、 two questions have been raised about requirements for grounding the fence around the solar farm per the NESC. Question 1: Because the solar farm was designed and built to NEC requirements, would the NESC grounding requirements apply to the fence even though it is owned by the utility? Question 2: I

4、f the NESC does apply, is it the intent of Rule 110A to require fence grounding when there are no exposed conductors or equipment? Discussion: The NESC definition of electric supply stations includes generation stations, and paragraph 1, generation stations, includes solar in the definition. In sect

5、ion 11, Rule 110A, the following rule requires fences to be grounded: “Metal fences, when used to enclose electric supply stations having energized electric conductors or equipment, shall have a height not less than 2.13 m (7 ft) overall and shall be grounded in accordance with Section 9.” Article 2

6、50-194 in the NEC (NFPA 70, 2014 edition) has a similar rule, but it includes the word “exposed” electrical conductors and equipment. This is interpreted to mean no fence grounding is required if there are no exposed electrical conductors or equipment. 2 Copyright 2016 IEEE. All rights reserved. Int

7、erpretation This Interpretation is based on an understanding that your request (1) involves a fence around a utility owned solar farm (“perimeter fence”), (2) the solar panels are enclosed by this fence, and (3) the perimeter fence is the only fence or other means used to enclose the solar panels. S

8、ee definition of “enclosed.” On this basis, the answer to both of your questions is yes. First question: The NESC grounding requirements apply to the perimeter fence around the solar farm. As stated in your request, solar farms are generating stations by definition. Accordingly, NESC requirements do

9、 apply to solar farms, including the perimeter fence. See Rule 011A2, which states that the NESC covers: “The generationof electricitythrough public and private utility systems that are installed and maintained under the exclusive control of utilities or their authorized representatives.” Second que

10、stion: Rule 110A, which was quoted in your request, requires metal fences to be grounded in accordance with Section 9 “when used to enclose electric supply stations having energized conductors or equipment” even where there are no “exposed conductors or equipment.” Note that solar panels are “electr

11、ic supply equipment” (see definition) and that Rule 110A is not limited to “exposed” items. Rule 110A also states that the grounding shall be done “in accordance with Section 9.” In Section 9, Rule 092E covers fence grounding, which states “Fences that are required to be grounded by other parts of t

12、his Code shall be designed to limit touch, step, and transferred voltages in accordance with industry practices.” A NOTE in the rule references IEEE Std 80 as one source for guidance. See also Rule 012C. While a proper engineering study may be used to determine the extent of required grounding, it c

13、annot negate the NESC requirement to ground subject perimeter fence. Your request does not include consideration of a presumably necessary step-up transformer station and connection to the electrical grid. Such an installation may require a grounded fence and may affect the perimeter fence in questi

14、on. _ National Electrical Safety Code and NESC are both registered trademarks and service marks of the Institute of Electrical and Electronics Engineers, Inc. The NESC is available from the Institute of Electrical and Electronics Engineers, Inc. (http:/standards.ieee.org/). National Electrical Code, NEC, and NFPA 70 are registered trademarks in the U.S. Patent & Trademark Office, owned by the National Fire Protection Association.

展开阅读全文
相关资源
  • IEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdfIEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdf
  • IEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdfIEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdf
  • IEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdfIEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdf
  • IEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdfIEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdf
  • IEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdfIEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdf
  • IEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdfIEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdf
  • IEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdfIEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdf
  • IEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdfIEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdf
  • IEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdfIEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdf
  • IEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdfIEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdf
  • 猜你喜欢
  • ETSI TS 142 068-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Voice Group Call Service (VGCS) Stage 1 (V14 0 0 3GPP TS 42 068 version 14 0 0 Release 14)《数字蜂窝通信系统.pdf ETSI TS 142 068-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Voice Group Call Service (VGCS) Stage 1 (V14 0 0 3GPP TS 42 068 version 14 0 0 Release 14)《数字蜂窝通信系统.pdf
  • ETSI TS 142 069-2016 Digital cellular telecommunications system (Phase 2+) Voice Broadcast Service (VBS) Stage 1 (V13 0 0 3GPP TS 42 069 version 13 0 0 Release 13)《数字蜂窝通信系统(第2+阶段) .pdf ETSI TS 142 069-2016 Digital cellular telecommunications system (Phase 2+) Voice Broadcast Service (VBS) Stage 1 (V13 0 0 3GPP TS 42 069 version 13 0 0 Release 13)《数字蜂窝通信系统(第2+阶段) .pdf
  • ETSI TS 142 069-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Voice Broadcast Service (VBS) Stage 1 (V14 0 0 3GPP TS 42 069 version 14 0 0 Release 14)《数字蜂窝通信系统(第.pdf ETSI TS 142 069-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Voice Broadcast Service (VBS) Stage 1 (V14 0 0 3GPP TS 42 069 version 14 0 0 Release 14)《数字蜂窝通信系统(第.pdf
  • ETSI TS 143 005-2016 Digital cellular telecommunications system (Phase 2+) Technical performance objectives (V13 0 0 3GPP TS 43 005 version 13 0 0 Release 13)《数字蜂窝通信系统(第2+阶段) 技术性能目.pdf ETSI TS 143 005-2016 Digital cellular telecommunications system (Phase 2+) Technical performance objectives (V13 0 0 3GPP TS 43 005 version 13 0 0 Release 13)《数字蜂窝通信系统(第2+阶段) 技术性能目.pdf
  • ETSI TS 143 005-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Technical performance objectives (V14 0 0 3GPP TS 43 005 version 14 0 0 Release 14)《数字蜂窝通信系统(第2+阶段).pdf ETSI TS 143 005-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Technical performance objectives (V14 0 0 3GPP TS 43 005 version 14 0 0 Release 14)《数字蜂窝通信系统(第2+阶段).pdf
  • ETSI TS 143 010-2016 Digital cellular telecommunications system (Phase 2+) GSM Public Land Mobile Network (PLMN) connection types (V13 0 0 3GPP TS 43 010 version 13 0 0 Release 13).pdf ETSI TS 143 010-2016 Digital cellular telecommunications system (Phase 2+) GSM Public Land Mobile Network (PLMN) connection types (V13 0 0 3GPP TS 43 010 version 13 0 0 Release 13).pdf
  • ETSI TS 143 010-2017 Digital cellular telecommunications system (Phase 2+) (GSM) GSM Public Land Mobile Network (PLMN) connection types (V14 0 0 3GPP TS 43 010 version 14 0 0 Relea.pdf ETSI TS 143 010-2017 Digital cellular telecommunications system (Phase 2+) (GSM) GSM Public Land Mobile Network (PLMN) connection types (V14 0 0 3GPP TS 43 010 version 14 0 0 Relea.pdf
  • ETSI TS 143 013-2016 Digital cellular telecommunications system (Phase 2+) (GSM) Discontinuous Reception (DRX) in the GSM system (V13 0 0 3GPP TS 43 013 version 13 0 0 Release 13)《.pdf ETSI TS 143 013-2016 Digital cellular telecommunications system (Phase 2+) (GSM) Discontinuous Reception (DRX) in the GSM system (V13 0 0 3GPP TS 43 013 version 13 0 0 Release 13)《.pdf
  • ETSI TS 143 013-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Discontinuous Reception (DRX) in the GSM system (V14 0 0 3GPP TS 43 013 version 14 0 0 Release 14)《.pdf ETSI TS 143 013-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Discontinuous Reception (DRX) in the GSM system (V14 0 0 3GPP TS 43 013 version 14 0 0 Release 14)《.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > IEC

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1