ISO IEC 27002 CORR 2-2015 Information technology - Security techniques - Code of practice for information security controls Technical Corrigendum 2《信息技术 安全技术 信息.pdf

上传人:lawfemale396 文档编号:1257158 上传时间:2019-09-02 格式:PDF 页数:2 大小:255.50KB
下载 相关 举报
ISO IEC 27002 CORR 2-2015 Information technology - Security techniques - Code of practice for information security controls Technical Corrigendum 2《信息技术 安全技术 信息.pdf_第1页
第1页 / 共2页
ISO IEC 27002 CORR 2-2015 Information technology - Security techniques - Code of practice for information security controls Technical Corrigendum 2《信息技术 安全技术 信息.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 INTERNATIONAL STANDARD ISO/IEC 27002:2013 TECHNICAL CORRIGENDUM 2 Published 2015-11-15 INTERNATIONAL ORGANIZATION FOR STANDARDIZATION ORGANISATION INTERNATIONALE DE NORMALISATION INTERNATIONAL ELECTROTECHNICAL COMMISSION COMMISSION LECTROTECHNIQUE INTERNATIONALEInformation technology Security techn

2、iques Code of practice for information security controls TECHNICAL CORRIGENDUM 2 Technologies de linformation Techniques de scurit Code de bonne pratique pour le management de la scurit de linformation RECTIFICATIF TECHNIQUE 2 Technical Corrigendum 2 to ISO/IEC 27002:2013 was prepared by Joint Techn

3、ical Committee ISO/IEC JTC 1, Information technology, Subcommittee SC 27, IT Security techniques ICS 35.040 Ref. No. ISO/IEC 27002:2013/Cor.2:2015(E) ISO/IEC 2015 All rights reserved Published in Switzerland ISO/IEC 27002:2013/Cor.2:2015(E) 2 ISO/IEC 2015 All rights reservedPage 61, Subclause 14.2.8

4、 Replace Implementation Guidance New and updated systems require thorough testing and verification during the development processes, including the preparation of a detailed schedule of activities and test inputs and expected outputs under a range of conditions. For in-house developments, such tests

5、should initially be performed by the development team. Independent acceptance testing should then be undertaken (both for in-house and for outsourced developments) to ensure that the system works as expected and only as expected (see 14.1.1 and 14.1.9). The extent of testing should be in proportion

6、to the importance and nature of the system. With Implementation Guidance New and updated systems require thorough testing and verification during the development processes, including the preparation of a detailed schedule of activities and test inputs and expected outputs under a range of conditions

7、 For in-house developments, such tests should initially be performed by the development team. Independent acceptance testing should then be undertaken (both for in-house and for outsourced developments) to ensure that the system works as expected and only as expected (see 14.1.1 and 14.2.9). The extent of testing should be in proportion to the importance and nature of the system.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1