BFT(写作)-试卷27及答案解析.doc

上传人:appealoxygen216 文档编号:1448806 上传时间:2020-01-30 格式:DOC 页数:2 大小:29.50KB
下载 相关 举报
BFT(写作)-试卷27及答案解析.doc_第1页
第1页 / 共2页
BFT(写作)-试卷27及答案解析.doc_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、BFT(写作)-试卷 27及答案解析(总分:4.00,做题时间:90 分钟)一、Part 1(总题数:1,分数:2.00)1.Read this note from your boss, Mr. Andrew Peterson. December 11th 2011 Lilian, Our company is working on a staff reduction plan. The Executive Committee is planning to hold a meeting with all managers. We will meet from 1 p.m. to 5 p.m.

2、on Dec. 18th in the executive boardroom, Manson Building. The purpose of the meeting is to discuss the details, like range and procedure, of the plan. All managers are required to attend the meeting, and they are expected to report on their units financial picture, and also their units plans and sug

3、gestions for staff reduction. Please tell them to submit their materials to me by Dec. 15th. Thank you. Andrew Write a memorandum to the managers: describing the background of the meeting; stating what the meeting is about; asking the managers to prepare the materials. Write 50-60 words.(分数:2.00)_二、

4、Part 2(总题数:1,分数:2.00)2.The Spring Festival is coming. Suppose you are the secretary at a firm and your manager asks you to write a note(30-40 words)to all the staff for the weeks holiday during the spring festival from 1 till 7 of the lunar calendar. And also demands each section should have someone

5、 be on duty during this period in case of emergency.(分数:2.00)_BFT(写作)-试卷 27答案解析(总分:4.00,做题时间:90 分钟)一、Part 1(总题数:1,分数:2.00)1.Read this note from your boss, Mr. Andrew Peterson. December 11th 2011 Lilian, Our company is working on a staff reduction plan. The Executive Committee is planning to hold a m

6、eeting with all managers. We will meet from 1 p.m. to 5 p.m. on Dec. 18th in the executive boardroom, Manson Building. The purpose of the meeting is to discuss the details, like range and procedure, of the plan. All managers are required to attend the meeting, and they are expected to report on thei

7、r units financial picture, and also their units plans and suggestions for staff reduction. Please tell them to submit their materials to me by Dec. 15th. Thank you. Andrew Write a memorandum to the managers: describing the background of the meeting; stating what the meeting is about; asking the mana

8、gers to prepare the materials. Write 50-60 words.(分数:2.00)_正确答案:(正确答案: To: All Managers From: Lilian, Executive Assistant to the President Date: December 11,2011 Subject: Managers Meeting from 1 p.m. to 5 p.m. on Dec. 18th in the executive boardroom, Manson Building. The focus of this meeting is to

9、discuss the staff reduction plan which our company is working on. The purpose of the meeting is to discuss the details, like range and procedure, of the plan, so please come to the meeting with your units plans and suggestions for staff reduction. Also all managers are expected to report on your uni

10、ts financial picture. All the managers are required to submit your materials to Mr. Andrew Peterson by Dec. 15th. Thank you! Best, Lilian)解析:二、Part 2(总题数:1,分数:2.00)2.The Spring Festival is coming. Suppose you are the secretary at a firm and your manager asks you to write a note(30-40 words)to all th

11、e staff for the weeks holiday during the spring festival from 1 till 7 of the lunar calendar. And also demands each section should have someone be on duty during this period in case of emergency.(分数:2.00)_正确答案:(正确答案: Notes Date : Jan. 12th, 2006 We will have a weeks holiday during the Spring Festival from 1 till 7 of the lunar calendar. Each section should have someone be on duty during this period in case of emergency. Take a good rest and be careful. Wish all will have a prosperous, Lucky and Happy New Year!)解析:

展开阅读全文
相关资源
猜你喜欢
  • SANS 61326-2-4-2009 Electrical equipment for measurement control and laboratory use - EMC requirements Part 2-4 Particular requirements - Test configurations operational conditionstor.pdf SANS 61326-2-4-2009 Electrical equipment for measurement control and laboratory use - EMC requirements Part 2-4 Particular requirements - Test configurations operational conditionstor.pdf
  • SANS 61326-2-5-2009 Electrical equipment for measurement control and laboratory use - EMC requirements Part 2-5 Particular requirements - Test configurations operational conditionsith.pdf SANS 61326-2-5-2009 Electrical equipment for measurement control and laboratory use - EMC requirements Part 2-5 Particular requirements - Test configurations operational conditionsith.pdf
  • SANS 61326-2003 Electrical equipment for measurement control and laboratory use - EMC requirements《测量、控制及实验室用电气设备 电磁兼容(EMC)要求》.pdf SANS 61326-2003 Electrical equipment for measurement control and laboratory use - EMC requirements《测量、控制及实验室用电气设备 电磁兼容(EMC)要求》.pdf
  • SANS 6133-2007 Enumeration of sulfate-reducing bacteria - Most probable number (MPN) technique《硫酸盐还原细菌的计数 最大可能数量(MPN)技术》.pdf SANS 6133-2007 Enumeration of sulfate-reducing bacteria - Most probable number (MPN) technique《硫酸盐还原细菌的计数 最大可能数量(MPN)技术》.pdf
  • SANS 61347-2-10-2010 Lamp controlgear Part 2-10 Particular requirements for electronic invertors and convertors for high-frequency operation of cold start tubular discharge lamps (.pdf SANS 61347-2-10-2010 Lamp controlgear Part 2-10 Particular requirements for electronic invertors and convertors for high-frequency operation of cold start tubular discharge lamps (.pdf
  • SANS 61347-2-11-2001 Lamp controlgear Part 2-11 Particular requirements for miscellaneous electronic circuits used with luminaires《灯的控制装置 第2 11部分:与灯具同用的各种电子电路的特殊要求》.pdf SANS 61347-2-11-2001 Lamp controlgear Part 2-11 Particular requirements for miscellaneous electronic circuits used with luminaires《灯的控制装置 第2 11部分:与灯具同用的各种电子电路的特殊要求》.pdf
  • SANS 61347-2-4-2000 Lamp controlgear Part 2-4 Particular requirements for d c supplied electronic ballasts for general lighting《灯的控制装置 第2 4部分:一般照明用直流电子镇流器的特殊要求》.pdf SANS 61347-2-4-2000 Lamp controlgear Part 2-4 Particular requirements for d c supplied electronic ballasts for general lighting《灯的控制装置 第2 4部分:一般照明用直流电子镇流器的特殊要求》.pdf
  • SANS 61347-2-8-2007 Lamp controlgear Part 2-8 Particular requirements for ballasts for fluorescent lamps《灯控装置 第2-8部分 对荧光灯镇流器的特殊要求》.pdf SANS 61347-2-8-2007 Lamp controlgear Part 2-8 Particular requirements for ballasts for fluorescent lamps《灯控装置 第2-8部分 对荧光灯镇流器的特殊要求》.pdf
  • SANS 6135-1989 Heat insulation of granulated cork bottom filler for footwear《鞋类用软木屑底部填充物的隔热》.pdf SANS 6135-1989 Heat insulation of granulated cork bottom filler for footwear《鞋类用软木屑底部填充物的隔热》.pdf
  • 相关搜索

    当前位置:首页 > 考试资料 > 职业资格

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1