API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf

上传人:刘芸 文档编号:399440 上传时间:2018-10-21 格式:PDF 页数:88 大小:435.75KB
下载 相关 举报
API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf_第1页
第1页 / 共88页
API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf_第2页
第2页 / 共88页
API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf_第3页
第3页 / 共88页
API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf_第4页
第4页 / 共88页
API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf_第5页
第5页 / 共88页
亲,该文档总共88页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan Plan Template API BULLETIN D16 FIFTH EDITION, APRIL 2011 Suggested Procedure for Development of a Spill Prevention, Control, and Countermeasure (SPCC) PlanTEMPLATE API BULLETIN D-16 FIFTH EDITION, APRIL 2011 A

2、merican Petroleum Institute Developed by: OBriens Response Management Inc. 6620 Cypresswood Drive, Suite 200 Spring (Houston), Texas 77379 (281) 320-9796 SPECIAL NOTES API publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and fede

3、ral laws and regulations should be reviewed. Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herei

4、n, or assume any liability or responsibility for any use, or the results of such use, of any information or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon pri

5、vately owned rights. API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication

6、and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict. API publications are published to facilitate the broad availability of proven, sound engineer

7、ing and operating practices. These publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any

8、 other practices. Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such products do in fact con

9、form to the applicable API standard. All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Pub

10、lisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005. Copyright 2011 American Petroleum Institute FOREWORD Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, o

11、r product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent. Suggested revisions are invited and should be submitted to the Director of Regulatory and Scientific Affairs, API, 1220 L St

12、reet, NW, Washington, DC 20005. Facility: TEMPLATESPCC-i Date: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN (Facility Name) (Facility Location) (Type of Facility) (Operator Name) (Address) (Address) (Owner Name; If Different Than Operator) (Address) (Address) Spill Prevention, Control, and Cou

13、ntermeasure Plan Template Facility: SPCC-ii Date: TABLE OF CONTENTS Page Table of Contents . ii Log of Plan Review and Amendments v Regulatory Cross-Reference vi Section 1 General Information 1.0 General Information. 1-1 1.1 Management Approval 1-1 1.2A Professional Engineer Certification . 1-2 1.2B

14、 Professional Engineer Certification (with Produced Water Attestation) 1-3 1.2C Tier II Qualified Facility Certification 1-4 1.2D Professional Engineer Certification of Portions of a Qualified Facilitys Self-Certified Plan . 1-5 1.2E Tier II Qualified Facility Technical Amendment . 1-6 1.3 Substanti

15、al Harm Certification (excerpt from 40 CFR Part 112 - Attachment CII) 1-7 1.4 Contact List and Phone Numbers . 1-8 1.5 Notification Data Sheet 1-8 1.6 Personnel, Training, and Discharge Prevention Procedures 1-8 1.7 Facility Layout and Diagram 1-10 1.7.1 Facility Layout 1-10 1.7.2 Facility Diagram .

16、 1-10 1.8 Prevention, Response and Cleanup 1-11 1.9 Impracticability. 1-13 1.10 Deviations to Rule . 1-14 1.11 Conformance with other Requirements . 1-15 Section 2A Onshore Facilities (Excluding Production) Information N/A 2A.1 Container and Potential Spills Table . 2A-1 2A.2 Bulk Storage Containers

17、 . 2A-2 2A.2.1 Completely and Partially Buried Tanks . 2A-2 2A.2.2 Mobile or Portable Oil Storage Containers . 2A-2 2A.2.3 Internal Heating Coils . 2A-2 2A.2.4 Fail Safe Precautions . 2A-3 2A.3 Facility Containment, Drainage and Effluent Treatment 2A-4 2A.3.1 Secondary Containment Systems 2A-4 2A.3.

18、2 Facility Diked Drainage to Surface Waters without Facility Treatment System 2A-5 2A.3.3 Facility Drainage to Effluent Treatment System . 2A-5 2A.3.4 Effluent Treatment System . 2A-5 2A.3.5 Facility Undiked Drainage to Surface Waters . 2A-5 2A.3.6 Oil Filled Equipment . 2A-6 2A.4 Facility Transfer

19、Operations, Pumping and Facility Process . 2A-6 2A.4.1 Facility Piping . 2A-6 2A.4.2 Out of Service Piping 2A-7 2A.4.3 Pipe Supports . 2A-7 2A.4.4 Vehicle Warnings 2A-7 2A.5 Facility Tank Car replacement, reconstruction, or movement of containers; reconstruction, replacements, or installation of pip

20、ing systems; construction or demolition that might alter secondary containment structures; changes of product or service; or addition/deletion of standard operation or maintenance procedures related to discharge prevention measures. It is the responsibility of the facility to determine, and confirm

21、with the regulatory authority as necessary, what constitutes a technical amendment. The rule requires a technical amendment only “when there is a change (112.5(a) that materially affects the facilitys potential to discharge oil”. An amendment made under this section will be prepared within six (6) m

22、onths of the change and implemented as soon as possible but not later than six (6) months following preparation of the amendment. Technical Amendments affecting various pages within the plan can be PE certified on those pages, certifying those amendments only, and will be documented on the log form

23、below. MANAGEMENT REVIEW Management will review this SPCC Plan at least each five (5) years and document the review on the form below (112.5(b). By signature below, signor confirms that management has completed a review and evaluation of this SPCC Plan. Review/Amend Date Signature* (Specify) Amend P

24、lan (will/will not) Description of Review/Amendment Affected Page(s) P.E. Certification (Y/N) * Typically signed by Manager, Professional Engineer or plan reviewer.Spill Prevention, Control, and Countermeasure Plan Template Facility: SPCC-vi- Onshore Date: a ONSHORE FACILITY - REGULATORY CROSS-REFER

25、ENCE Citation Description Section 112.3(d)(1) Professional Engineer Certification 1.2 112.3(g)(1) Tier I Qualified Facility Self Certified Plan App. F 112.3(g)(2) Tier II Qualified Facility Self Certified Plan 1, 2A 112.5(b) Management of Five Year Review Foreword, 1.1 112.6 Qualified Facilities Pla

26、n Requirements - 112.6(a)(1) Tier I Preparation and Self-Certification App. F 112.6(a)(2) Technical Amendments App. F 112.6(a)(3) Plan Template and Applicable Requirements App. F 112.6(b)(1) Tier II Preparation and Self-Certification 1, 2A 112.6(b)(2) Technical Amendments 1.2E 112.6(b)(3) Applicable

27、 Requirements 1, 2A 112.6(b)(4) PE Certification of Portions of Self-Certified Plan 1.2D 112.7 General requirements for SPCC Plans for all facilities and all oil types - 112.7(a) General requirements: discussion of facilitys conformance with rule requirements; deviations from Plan requirements; faci

28、lity characteristics that must be described in the Plan; spill reporting information in the Plan; emergency procedures 1, 2, App. A-D 112.7(b) Fault analysis 2A.1 112.7(c) Secondary containment 2A.1, 2A.3.1 112.7(d) Contingency planning App. D 112.7(e) Inspections, tests, and records 2A.5.3, 2A.7, A

29、pp. B 112.7(f) Employee training and discharge prevention procedures 1.6, App. A, App. B 112.7(g) Security (excluding oil production facilities) 2A.4.2, 2A.6 112.7(h) Loading/unloading (excluding offshore facilities) 2A.5 112.7(i) Brittle fracture evaluation requirements 2A.7 112.7(j) Conformance wi

30、th State requirements 1.11 112.7(k) Qualified Oil-filled Operational Equipment 2A.1 112.8 Requirements for onshore facilities (excluding production facilities) - 112.8(a) General and specific requirements 2A.1 2A.4, 2A.7 112.8(b) Facility drainage 2A.3 112.8(c) Bulk storage containers 2A.1, 2A.2, 2A

31、.7 112.8(d) Facility transfer operations, pumping, and facility process 2A.4, 2.A.7 112.9 Requirements for onshore production facilities N/A 112.9(a) General and specific requirements N/A 112.9(b) Oil production facility drainage N/A 112.9(c) Oil production facility bulk storage containers N/A 112.9

32、(d) Facility transfer operations, oil production facility N/A 112.10 Requirements for onshore oil drilling and workover facilities N/A 112.10(a) General and specific requirements N/A 112.10(b) Mobile facilities N/A 112.10(c) Secondary containment catchment basins or diversion structures N/A 112.10(d

33、) Blowout prevention (BOP) N/A 112.11 Requirements for offshore oil drilling, production, or workover facilities N/A 112.11(a) General and specific procedures N/A 112.11(b) Facility drainage N/A 112.11(c) Sump systems N/A 112.11(d) Discharge prevention systems for separators and treaters N/A 112.11(

34、e) Atmospheric storage or surge containers; alarms N/A Spill Prevention, Control, and Countermeasure Plan Template Facility: SPCC-vii- Onshore Date: a ONSHORE FACILITY - REGULATORY CROSS-REFERENCE (Contd) 112.11(f) Pressure containers; alarm systems N/A 112.11(g) Corrosion protection N/A 112.11(h) P

35、ollution prevention system procedures N/A 112.11(i) Pollution prevention systems; testing and inspection N/A 112.1(j) Surface and subsurface well shut-in valves and devices N/A 112.11(k) Blowout prevention N/A 112.11(l) Manifolds N/A 112.11(m) Flowlines, pressure sensing devices N/A 112.11(n) Piping

36、; corrosion protection N/A 112.11(o) Sub-marine piping; environmental stresses N/A 112.11(p) Inspections of sub-marine piping N/A Spill Prevention, Control, and Countermeasure Plan Template Facility: SPCC-viii- Onshore Production Date: a ONSHORE OIL PRODUCTION FACILITY - REGULATORY CROSS-REFERENCE C

37、itation Description Section 112.3(d)(1) Professional Engineer Certification 1.2 112.3(g)(1) Tier I Qualified Facility Self Certified Plan App. G 112.3(g)(2) Tier II Qualified Facility Self Certified Plan 1, 2B 112.5(b) Management of Five Year Review Foreword, 1.1 112.6 Qualified Facilities Plan Requ

38、irements - 112.6(a)(1) Tier I Preparation and Self-Certification App. F 112.6(a)(2) Technical Amendments App. F 112.6(a)(3) Plan Template and Applicable Requirements App. F 112.6(b)(1) Tier II Preparation and Self-Certification 1, 2B 112.6(b)(2) Technical Amendments 1. 2E 112.6(b)(3) Applicable Requ

39、irements 1, 2B 112.6(b)(4) PE Certification of Portions of Self-Certified Plan 1. 2D 112.7 General requirements for SPCC Plans for all facilities and all oil types - 112.7(a) General requirements: discussion of facilitys conformance with rule requirements; deviations from Plan requirements; facility

40、 characteristics that must be described in the Plan; spill reporting information in the Plan; emergency procedures 1, 2, App. A-E 112.7(b) Fault analysis 2B.1 112.7(c) Secondary containment 2B.1, 2B.3 112.7(d) Contingency planning App. D 112.7(e) Inspections, tests, and records 2B.6 112.7(f) Employe

41、e training and discharge prevention procedures 1.6, App. A, App. B 112.7(g) Security (excluding oil production facilities) N/A 112.7(h) Loading/unloading (excluding offshore facilities) 2B.5 112.7(i) Brittle fracture evaluation requirements 2B.6 112.7(j) Conformance with State requirements 1.11 112.

42、7(k) Qualified Oil-filled Operational Equipment 2B.1 112.8 Requirements for onshore facilities (excluding production facilities) N/A 112.8(a) General and specific requirements N/A 112.8(b) Facility drainage N/A 112.8(c) Bulk storage containers N/A 112.8(d) Facility transfer operations, pumping, and

43、facility process N/A 112.9 Requirements for onshore production facilities - 112.9(a) General and specific requirements 2B.1 - 2B.4, 2B.6 112.9(b) Oil production facility drainage 2B.3 112.9(c) Oil production facility bulk storage containers 2B.1, 2B.2 112.9(d) Facility transfer operations, oil produ

44、ction facility 2B.4 112.10 Requirements for onshore oil drilling and workover facilities N/A 112.10(a) General and specific requirements N/A 112.10(b) Mobile facilities N/A 112.10(c) Secondary containment - catchment basins or diversion structures N/A 112.10(d) Blowout prevention (BOP) N/A 112.11 Re

45、quirements for offshore oil drilling, production, or workover facilities N/A 112.11(a) General and specific procedures N/A 112.11(b) Facility drainage N/A 112.11(c) Sump systems N/A 112.11(d) Discharge prevention systems for separators and treaters N/A 112.11(e) Atmospheric storage or surge containe

46、rs; alarms N/A 112.11(f) Pressure containers; alarm systems N/A Spill Prevention, Control, and Countermeasure Plan Template Facility: SPCC-ix- Onshore Production Date: a ONSHORE OIL PRODUCTION FACILITY - REGULATORY CROSS-REFERENCE (Contd) 112.11(g) Corrosion protection N/A 112.11(h) Pollution preven

47、tion system procedures N/A 112.11(i) Pollution prevention systems; testing and inspection N/A 112.1(j) Surface and subsurface well shut-in valves and devices N/A 112.11(k) Blowout prevention N/A 112.11(l) Manifolds N/A 112.11(m) Flowlines, pressure sensing devices N/A 112.11(n) Piping; corrosion pro

48、tection N/A 112.11(o) Sub-marine piping; environmental stresses N/A 112.11(p) Inspections of sub-marine piping N/A Spill Prevention, Control, and Countermeasure Plan Template Facility: SPCC-x- Onshore Drilling Date: a ONSHORE OIL DRILLING AND WORKOVER FACILITY - REGULATORY CROSS-REFERENCE Citation D

49、escription Section 112.3(d)(1) Professional Engineer Certification 1.2 112.3(g)(1) Tier I Qualified Facility Self Certified Plan App. F 112.3(g)(2) Tier II Qualified Facility Self Certified Plan 1, 2C 112.5(b) Management of Five Year Review Foreword, 1.1 112.6 Qualified Facilities Plan Requirements - 112.6(a)(1) Tier I Preparation and Self-Certification App. F 112.6(a)(2) Technica

展开阅读全文
相关资源
  • API SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdfAPI SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdf
  • API MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdfAPI MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdf
  • API MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdfAPI MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdf
  • API MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdfAPI MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdf
  • API MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdfAPI MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdf
  • API MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdfAPI MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdf
  • API MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdfAPI MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdf
  • API MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdfAPI MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdf
  • API MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdfAPI MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdf
  • API MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdfAPI MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > API

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1