API BULL D16-2011 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan (Fifth Edition Includes Access to Additional Content)《溢漏预防控制及对策方案制定建议实施规.pdf

上传人:刘芸 文档编号:399441 上传时间:2018-10-21 格式:PDF 页数:75 大小:1.13MB
下载 相关 举报
API BULL D16-2011 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan (Fifth Edition Includes Access to Additional Content)《溢漏预防控制及对策方案制定建议实施规.pdf_第1页
第1页 / 共75页
API BULL D16-2011 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan (Fifth Edition Includes Access to Additional Content)《溢漏预防控制及对策方案制定建议实施规.pdf_第2页
第2页 / 共75页
API BULL D16-2011 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan (Fifth Edition Includes Access to Additional Content)《溢漏预防控制及对策方案制定建议实施规.pdf_第3页
第3页 / 共75页
API BULL D16-2011 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan (Fifth Edition Includes Access to Additional Content)《溢漏预防控制及对策方案制定建议实施规.pdf_第4页
第4页 / 共75页
API BULL D16-2011 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan (Fifth Edition Includes Access to Additional Content)《溢漏预防控制及对策方案制定建议实施规.pdf_第5页
第5页 / 共75页
亲,该文档总共75页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Access to Additional Content for API BULL D16 (Click here to view the publication) This Page is not part of the original publication This page has been added by IHS as a convenience to the user in order to provide access to additional content as authorized by the Copyright holder of this document C

2、lick the link(s) below to access the content and use normal procedures for downloading or opening the files. API BULL D16 TEMPLATES ZIP File Information contained in the above is the property of the Copyright holder and all Notice of Disclaimer however, the Institute makes no representation, warrant

3、y, or guarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict. API publications are published to facilit

4、ate the broad availability of proven, sound engineering and operating practices. These publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not

5、intended in any way to inhibit anyone from using any other practices. All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission fr

6、om the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005. Copyright 2011 American Petroleum Institute FOREWORD Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, o

7、r use of any method, apparatus, or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent. Suggested revisions are invited and should be submitted to the Director of Regulatory and S

8、cientific Affairs, API, 1220 L Street, NW, Washington, DC 20005. Table of Contents GUIDE - i Page FOREWORD Table of Contents Guide-i Introduction . Guide-iii Purpose of SPCC Rule . Guide-2 Timeline for Compliance . Guide-3 Extensions for Implementing the SPCC Plan . Guide-3 Applicability Guide-5 Fig

9、ure 1 General Applicability . Guide-9 Guidance for Selecting Template SPCC Plan Sections . Guide-10 Figure 2 Selecting Template SPCC Plan Sections Guide-12 Guidance, Instruction, Clarification Using the Template SPCC Plan . Guide-13 Figure 3 Flowchart of Applicability Criteria for Substantial Harm G

10、uide-19 GUIDANCE Section 1 General Information 1.1 Management Approval . Guide-14 1.2 Certifications . Guide-15 1.2A Professional Engineer Certification Guide-15 1.2B Professional Engineer Certification (with Produced Water Attestation) Guide-16 1.2C Tier II Qualified Facility Certification . Guide-

11、17 1.2D Professional Engineer Certification of Portions of a Qualified Facilitys Self-Certified Plan Guide-17 1.2E Tier II Qualified Facility Technical Amendment Guide-18 1.3 Substantial Harm Certification Guide-18 Figure 3 Flowchart of Applicability Criteria for Substantial Harm Guide-19 1.4 Contac

12、t List and Phone Numbers Guide-20 1.5 Notification Data Sheet . Guide-20 1.6 Personnel, Training, and Discharge Procedures Guide-20 1.7 Facility Layout and Diagram . Guide-21 1.8 Prevention, Response and Cleanup . Guide-21 1.9 Impracticability Guide-22 1.10 Deviations to Rule Guide-22 1.11 Conforman

13、ce with Other Requirements . Guide-23 Section 2 Facility Information Section 2A Onshore Facilities (Excluding Production) 2A.1 Container and Potential Spills Table Guide-24 2A.2 Bulk Storage Containers Guide-26 2A.2.1 Completely Buried Tanks . Guide-26 2A.2.2 Mobile or Portable Containers Guide-26 2

14、A.3 Facility Containment, Drainage and Effluent Treatment . Guide-26 2A.3.1 Secondary Containment Systems Table Guide-26 2A.3.2 Undiked Area Drainage Guide-26 2A.4 Facility Piping . Guide-27 2A.5 Facility Tank Car thus preventing pollution of navigable waters of the United States. The rule became ef

15、fective January 10, 1974, and has been revised several times over the past thirty-six years. In 2002, EPA finalized changes proposed from 1991 to 1997. API and other litigants subsequently filed suit over certain provisions. In March 2004, most of the issues raised in the litigation SPCC-related sui

16、ts were settled. This revision includes results of the litigation in which API was involved (Exhibit A Settlement Agreements). On June 19, 2009, EPA published in the Federal Register an SPCC compliance date extension for all existing facilities until November 10, 2010. Facilities must amend or prepa

17、re, and implement SPCC Plans by the compliance date in accordance with revisions to the SPCC rule promulgated since 2002. The latest SPCC amendments and definition of “navigable waters” were promulgated on December 2006 (71 FR 77266, December 26, 2006), December 2008 (73 FR 74236, December 5, 2008),

18、 November 2009 (74 FR 58784, November 13, 2009) and November 2008 (73 FR 71941, November 26, 2008), respectively. For more information, on EPA SPCC guidance, visit EPA Website (www.epa.gov/oilspill). This is the fifth revision of the American Petroleum Institutes (APIs) Bulletin D-16. Its sole purpo

19、se is to assist the petroleum industry in understanding the SPCC regulation and to offer guidance for developing SPCC Plans wherever they are needed. Included is a template for developing SPCC Plans (i.e., onshore excluding production; onshore oil production, oil drilling or workover; or offshore oi

20、l drilling, production or workover) in accordance with the regulation and guidance, along with instruction and clarification for completing each section of the template. The development of this Bulletin was commissioned by API and performed by OBriens Response Management Inc. (). GUIDE - iv Suggeste

21、d Procedure for Development of a Spill Prevention Control and Countermeasure (SPCC) Plan GUIDANCE API BULLETIN D-16 FIFTH EDITION, APRIL 2011 American Petroleum Institute Developed by: OBriens Response Management Inc. 6620 Cypresswood Drive, Suite 200 Spring (Houston), Texas 77379 (281) 320-9796 Sp

22、ill Prevention, Control, and Countermeasure Plan Guidance, Instruction, Clarification GUIDE - 2 Purpose of SPCC Rule The regulation is divided into three subparts, which detail the requirements for a Spill Prevention, Control, and Countermeasure (SPCC) Plan. Subpart A ( 112.1 to 112.7) contains an a

23、pplicability section, definitions, and general requirements for all facilities that are SPCC-regulated. Subpart B (112.8 to 112.11) sets out the SPCC requirements for petroleum oil and non-petroleum oils other than animal fats and vegetable oils. Subpart C (112.12) sets out the SPCC Plan requirement

24、s for animal fats, oils, and greases, fish and marine mammal oils; and oils of vegetable origin, including oils from seeds, nuts, fruits, and kernels. The SPCC Plan is the foundation of EPAs oil spill prevention program. Spill Prevention, Control, and Countermeasure Plan Guidance, Instruction, Clari

25、fication GUIDE - 3 Timeline for Compliance On August 3, 2010, EPA published a proposed rule (75 FR 45572) to amend SPCC compliance dates as follows. Note that this citation is to a proposed rule and not a final agency action. Users of this guidance are urged to verify this information and whether th

26、e agency has issued a final action. z If your fixed, mobile, or portable drilling, production, or workover facility that is offshore or is offshore with onshore components, was in operation on or before August 16, 2002, you must amend your Plan as necessary, maintain your plan, and amend as necessar

27、y to comply with the July 17, 2002, revised rule and subsequent amendments and certify the plan on or before November 10, 2010. o If your offshore facility, or offshore facility with onshore components, became operational after August 16, 2002, a Plan must be prepared and implemented on or before No

28、vember 10, 2010. o If your offshore facility, or offshore facility with onshore components, became operational after November 10, 2010, a Plan must be prepared and implemented before beginning operations. z If your onshore facility requiring you to have and submit a Facility Response Plan (FRP) was

29、in operation on or before August 16, 2002, you must amend your Plan as necessary, maintain your plan, and amend as necessary to comply with the July 17, 2002, revised rule and subsequent amendments and certify the plan on or before November 10, 2010. o If your onshore facility requiring an FRP becam

30、e operational after August 16, 2002, a Plan must be prepared and implemented on or before November 10, 2010. o If your onshore facility requiring an FRP became operational after November 10, 2010, a Plan must be prepared and implemented before beginning operations. z If your facility, or mobile or p

31、ortable facility, excluding drilling, production, and workover facilities, including mobile and portable facilities, that are offshore or are offshore with onshore components, and excluding onshore facilities required to have and submit Facility Response Plans, was in operation on or before August 1

32、6, 2002, you must amend your Plan as necessary, maintain your plan, and amend as necessary to comply with the July 17, 2002, revised rule and subsequent amendments and certify the plan on or before November 10, 2011. o If your facility, or mobile or portable facility, excluding drilling, production,

33、 and workover facilities, including mobile and portable facilities, that are offshore or are offshore with onshore components, and excluding onshore facilities required to have and submit Facility Response Plans, became operational after August 16, 2002, a Plan must be prepared and implemented on or

34、 before November 10, 2011. o If your facility, or mobile or portable facility, excluding drilling, production, and workover facilities, including mobile and portable facilities, that are offshore or are offshore with onshore components, and excluding onshore facilities required to Spill Prevention,

35、Control, and Countermeasure Plan Guidance, Instruction, Clarification GUIDE - 4 have and submit Facility Response Plans, became operational after November 10, 2011, a Plan must be prepared and implemented before beginning operations. z Acquired facilities are covered existing facilities and must be

36、in compliance with the same requirements based on their operational status as described above. z Mobile drilling or workover facilities without SPCC Plans are out of compliance and should take all necessary steps to get into compliance as soon as possible. If it is necessary to amend an existing Pla

37、n to comply with the revised rule, then it must be amended on or before November 10, 2010. Extensions for Implementing the SPCC Plan If an owner/operator cannot comply with the time requirement due to non-availability of qualified personnel or delay in construction or equipment delivery beyond his c

38、ontrol, he/she may request an extension of time by a letter request to the EPA Regional Administrator (112.3(f)(2). The letter must include: z A full explanation of the cause for any such delay and the specific aspects of the SPCC Plan affected by the delay; z A full discussion of actions being take

39、n or contemplated to minimize or mitigate such delay; and, z A proposed time schedule for the implementation of any corrective actions being taken or contemplated, including interim dates for completion of tests or studies, installation and operation of any necessary equipment, or other preventive m

40、easures. The Regional Administrator may request a copy of the SPCC Plan or any additional information at any time. The D-16 Bulletin provides the owner/operator of a regulated facility with the basic information to prepare, and guidance to assist users with the implementation of, an SPCC Plan (Acron

41、yms used in the Bulletin are listed in Exhibit B). The first step is to determine applicability (see GENERAL APPLICABILITY, Figure 1). If applicable, instructions on utilizing the Bulletins templates are outlined under GUIDELINES FOR PLAN PREPARATION AND IMPLEMENTATION.) These guidelines supplement

42、details or clarify information required to prepare an SPCC Plan. The suggested sections attached in the template will assist the user in developing a Plan. All facilities will use Section 1 and the appropriate Section 2 based on facility type (see PREPARATION AND IMPLEMENTATION, Figure 2). The templ

43、ate may be utilized and/or copied as necessary in the preparation of either single or multiple facility SPCC Plans. The use of the template will simplify preparation and provide uniformity in completed Plans. The appendices are provided to assist the user with supporting documentation (i.e. site dia

44、gram, notifications, inspection logs, etc.) Individual state requirements are not part of the guidance and template. Users of the Bulletin should consult the state agency(ies) associated with oil spill prevention for state requirements (See Exhibit A.) Spill Prevention, Control, and Countermeasure P

45、lan Guidance, Instruction, Clarification GUIDE - 5 Applicability The applicability of this rule to a facility can be determined by following the flow chart provided in Figure 1. The flow chart summarizes the three-step decision process. Additional guidance and clarification is provided below: STEP 1

46、: Determine if your facility (defined in 112.2) is a non-transportation related onshore or offshore facility. An SPCC Plan must be prepared by the owner or operator of onshore and offshore non-transportation related facilities engaged in drilling, producing, gathering, storing, processing, refining,

47、 transferring, distributing, using, and/or consuming oil and oil products who meet the additional requirements under Steps 2 and 3. z “Facility means any mobile or fixed, onshore or offshore building, property, parcel, lease, structure, installation, equipment, pipe, or pipeline (other than a vessel

48、 or a public vessel) used in oil well drilling operations, oil production, oil refining, oil gathering, oil processing, oil transfer, oil distribution, and oil waste treatment, or in which oil is used, as described in Appendix A to this part. The boundaries of a facility depend on several site-speci

49、fic factors, including, but not limited to, the ownership or operation of buildings, structures, and equipment on the same site and the types of activity at the site. Contiguous or non-contiguous buildings, properties, parcels, leases, structures, installations, pipes, or pipelines under the ownership or operation of the same person may be considered separate facilities. Only this definition governs whether a facility is subject to this part” (40 CFR 112.2 Definitions). In the preamble of the 2002 rule, the table

展开阅读全文
相关资源
  • API SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdfAPI SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdf
  • API MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdfAPI MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdf
  • API MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdfAPI MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdf
  • API MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdfAPI MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdf
  • API MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdfAPI MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdf
  • API MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdfAPI MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdf
  • API MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdfAPI MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdf
  • API MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdfAPI MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdf
  • API MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdfAPI MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdf
  • API MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdfAPI MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > API

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1