1、Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing StructuresAPI RECOMMENDED PRACTICE 4GFOURTH EDITION, APRIL 2012ERRATA, SEPTEMBER 2013ADDENDUM 1, AUGUST 2016Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing StructuresUpstream SegmentAPI RECOMM
2、ENDED PRACTICE 4GFOURTH EDITION, APRIL 2012ERRATA, SEPTEMBER 2013ADDENDUM 1, AUGUST 2016Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local,state, and federal laws and regulations should be reviewed.Neither API nor any of AP
3、Is employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of theinformation contained herein, or assume any liability or responsibility for any use, or the results
4、 of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors,consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.API publications may be used by anyone desiring to do
5、so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, orguarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss ordam
6、age resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API publications are published to facilitate the broad availability of proven, sound engineering and operatingpractices. These publications are not intended to obviate the n
7、eed for applying sound engineering judgmentregarding when and where these publications should be utilized. The formulation and publication of API publicationsis not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance wit
8、h the marking requirements of an API standardis solely responsible for complying with all the applicable requirements of that standard. API does not represent,warrant, or guarantee that such products do in fact conform to the applicable API standard.All rights reserved. No part of this work may be r
9、eproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005.Copyright 2012
10、 American Petroleum InstituteForewordUsers/owners may require a period of time to bring existing structures into conformance with new criteria. Due to thenumber of structures involved and the limited availability of qualified inspectors, the date of the first inspection forexisting structures should
11、 remain flexible.This standard shall become effective on the date of publication. The forms in annexes A through D are intended forfree exchange between owners/operators of the equipment or users of API 4G.Shall: As used in a publication, “shall” denotes a minimum requirement in order to conform to
12、the publication.Should: As used in a publication, “should” denotes a recommendation or that which is advised but not required inorder to conform to the specification.Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for themanufacture, sa
13、le, or use of any method, apparatus, or product covered by letters patent. Neither should anythingcontained in the publication be construed as insuring anyone against liability for infringement of letters patent.This document was produced under API standardization procedures that ensure appropriate
14、notification andparticipation in the developmental process and is designated as an API standard. Questions concerning theinterpretation of the content of this publication or comments and questions concerning the procedures under whichthis publication was developed should be directed in writing to th
15、e Director of Standards, American PetroleumInstitute, 1220 L Street, NW, Washington, DC 20005. Requests for permission to reproduce or translate all or any partof the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or
16、withdrawn at least every five years. A one-timeextension of up to two years may be added to this review cycle. Status of the publication can be ascertained from theAPI Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is publishedannually by API, 1220 L Stre
17、et, NW, Washington, DC 20005.Suggested revisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW,Washington, DC 20005, standardsapi.org.ContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 Objective. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Structures Covered . . . . . . . . . . . . . . . . . . . . .
19、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Normative References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Terms, Definitions, and Abbreviations
20、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13.1 Terms and Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13.2 Abbreviated Terms .
21、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 General Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22、. . . 44.1 Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44.2 Personnel Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23、 . . . . . . . . . . . . . . . . . . . 44.3 Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Use and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.2 Loading. . . . . . . . . . . . . . . . . . .
25、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65.3 Bolted Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65.4 Rac
26、king Platforms. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65.5 Changes in Rig Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27、 . . . . . . . . . 76 Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
28、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76.2 Inspection Categories. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86.3 Frequency of Inspection. . . . . . . . . . . . . . . . . . . . . .
29、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96.4 Acceptance Criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96.5 Rejected Equipment . . . . . . . . . .
30、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97 Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107.1 G
31、eneral . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107.2 Corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32、 . . . . . . . . . . . . . . . . . . . 107.3 Fire and Heat Exposure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108 Modification/Upgrade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
33、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118.1 Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118.2 Design and Modification. . . . . . . . . . . . . . . . . . .
34、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118.3 Padeyes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 128.4 Lifting Eyes . . . . . . .
35、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129 Documentation and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129.1 In
36、spection and Repair Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129.2 Identification/Traceability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
37、. . . . . . 1310 Unidentified EquipmentLoad Rating Determination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1510.1 Procedure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
38、 . . . . . . . . . 1510.2 Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1511 Foundation Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
39、 . . . . . . . . . . . . . . . . . . . . . . . . 1511.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1511.2 Leveling and Shimming . . . . . . . . . . . . . . . . . . . . . . . .
40、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1612 Raising/Bridle Line Inspection and Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1613 Guying for Portable Masts with Guylines. . . . . . . . . . . . . . .
41、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17ContentsPage13.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1713.2 Standing Ropes . . . . . . . .
42、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1713.3 Frequency of Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1713.4 G
43、uywire End Terminations and Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1813.5 Pretension of Guywires . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44、 1814 Guywire Anchors for Portable Masts with Guylines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1814.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
45、. . . . . . . . 1814.2 Capacity Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1814.3 Alternative Anchoring Practices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
46、. . . . . . . . . . . . . . . . . . . . 2014.4 Pull Testing and Site Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2114.5 Responsibilities of Contractor, Operator, and Testing Company . . . . . . . . . . . . . . . . .
47、. . . . . . . . . . . . . . . 2115 Foundations for Masts and Substructures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2215.1 Foundations and Supplemental Footing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
48、. . . . . . . . . . . . 2215.2 Wellhead Cellars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2416 Low-temperature Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49、. . . . . . . . . . . . . . . . . . . . . . . . 24Annex A (informative) Drilling Mast Visual Inspection Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26Annex B (informative) Well Servicing Masts Visual Inspection Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36Annex C (informative) Drilling Derrick Visual Inspection Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43Annex D (informative) Substructure Visual Inspection Form. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .