ABS 112 NOTICE 3-2017 GUIDE FOR PROPULSION SYSTEMS FOR LNG CARRIERS SEPTEMBER 2005.pdf

上传人:outsidejudge265 文档编号:400516 上传时间:2018-10-27 格式:PDF 页数:1 大小:25.99KB
下载 相关 举报
ABS 112 NOTICE 3-2017 GUIDE FOR PROPULSION SYSTEMS FOR LNG CARRIERS SEPTEMBER 2005.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 GUIDE FOR PROPULSION SYSTEMS FOR LNG CARRIERS SEPTEMBER 2005 NOTICE NO. 3 October 2017 The following changes were approved by the ABS Rules Committee on 1 September 2017 and become EFFECTIVE AS OF 1 OCTOBER 2017. (See http:/www.eagle.org for the consolidated version of the Guide for Propulsion Syst

2、ems for LNG Carriers 2005, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3 of the ABS Rules for Conditions of Cla

3、ssification (Part 1).) SECTION 3 BOIL-OFF GAS UTILIZATION 2 Supply of BOG to Utilization Units (1 October 2017) (Replace existing Subsection 3/2 with the following:) For Arrangement of Spaces Containing Gas Consumers and Gas Fuel Supply, reference is to be made to 5C-8-16/3 and 5C-8-16/4 of the Stee

4、l Vessel Rules. SECTION 6 DUAL FUEL DIESEL ENGINES PROPULSION SYSTEM 3 Gas Fuel Supply for Arrangements with Single Wall Fuel Gas Piping (Revise Paragraph 6/3.4, as follows:) 3.4 Manual Shut Off (1 October 2017) The gas shut-off valve as per 6/3.3 for each dual fuel engine compartment that can be closed from within the engine compartment, at the engine control station, at the cargo control room and at the navigation bridge is also to be provided within the cargo area. See Subsection 3/2 of this Guide. ABSGUIDE FOR PROPULSION SYSTEMS FOR LNG CARRIERS .2005 1

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1