1、 GUIDE FOR PROPULSION SYSTEMS FOR LNG CARRIERS SEPTEMBER 2005 NOTICE NO. 3 October 2017 The following changes were approved by the ABS Rules Committee on 1 September 2017 and become EFFECTIVE AS OF 1 OCTOBER 2017. (See http:/www.eagle.org for the consolidated version of the Guide for Propulsion Syst
2、ems for LNG Carriers 2005, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3 of the ABS Rules for Conditions of Cla
3、ssification (Part 1).) SECTION 3 BOIL-OFF GAS UTILIZATION 2 Supply of BOG to Utilization Units (1 October 2017) (Replace existing Subsection 3/2 with the following:) For Arrangement of Spaces Containing Gas Consumers and Gas Fuel Supply, reference is to be made to 5C-8-16/3 and 5C-8-16/4 of the Stee
4、l Vessel Rules. SECTION 6 DUAL FUEL DIESEL ENGINES PROPULSION SYSTEM 3 Gas Fuel Supply for Arrangements with Single Wall Fuel Gas Piping (Revise Paragraph 6/3.4, as follows:) 3.4 Manual Shut Off (1 October 2017) The gas shut-off valve as per 6/3.3 for each dual fuel engine compartment that can be closed from within the engine compartment, at the engine control station, at the cargo control room and at the navigation bridge is also to be provided within the cargo area. See Subsection 3/2 of this Guide. ABSGUIDE FOR PROPULSION SYSTEMS FOR LNG CARRIERS .2005 1