ABS 174-2010 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS《现有防喷器及相关系统的认证指南评注》.pdf

上传人:eventdump275 文档编号:400687 上传时间:2018-10-27 格式:PDF 页数:7 大小:45.67KB
下载 相关 举报
ABS 174-2010 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS《现有防喷器及相关系统的认证指南评注》.pdf_第1页
第1页 / 共7页
ABS 174-2010 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS《现有防喷器及相关系统的认证指南评注》.pdf_第2页
第2页 / 共7页
ABS 174-2010 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS《现有防喷器及相关系统的认证指南评注》.pdf_第3页
第3页 / 共7页
ABS 174-2010 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS《现有防喷器及相关系统的认证指南评注》.pdf_第4页
第4页 / 共7页
ABS 174-2010 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS《现有防喷器及相关系统的认证指南评注》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS DECEMBER 2010 Guide to Color Coding Used in Online Version of the Guidance Notes The following summarizes the colors corresponding to Rule Changes, Corrigenda items and editorial changes in the Guidance Notes file

2、s which are available for download. Rule Changes: Corrigenda: CORRIGENDA/EDITORIALS 15 February 2011 Editorials: Editorial Changes ABSGUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS .2010 1 Guidance Notes on Certification of Existing Blowout Preventers and Assoc

3、iated Systems GUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS DECEMBER 2010 (Updated February 2011 see next page) American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2010 American Bureau of Shipping ABS Plaza 16

4、855 Northchase Drive Houston, TX 77060 USA Updates February 2011 consolidation includes: December 2010 version plus Corrigenda/Editorials ABSGUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS .2010 iii Table of Contents GUIDANCE NOTES ON CERTIFICATION OF EXISTING B

5、LOWOUT PREVENTERS AND ASSOCIATED SYSTEMS CONTENTS 1 Purpose . 1 2 Scope. 1 3 Design Review 1 4 Required Documentation. 1 5 Survey . 2 6 Maintenance of Certification 2 This Page Intentionally Left Blank ABSGUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS .2010 1 1

6、 Purpose The purpose of these Guidance Notes is to identify the required inspections, documentation and testing procedures for obtaining and maintaining ABS certification of existing blowout prevention systems (BOPs) on Mobile Offshore Drilling Units. 2 Scope These requirements are intended to cover

7、 the following equipment: Ram-type BOPs Annular BOPs Connectors, ram blocks, and BOP choke and kill valves Control systems Riser/stack choke and kill and service lines ROV intervention panels Note: All terms used in this publication are based on common terminology used throughout the industry and AP

8、I RP 53. 3 Design Review Design documentation is to be submitted by the manufacturer or owner/operator and is to include the reports, calculations, plans, manuals and other documentation necessary to verify the design is in compliance with the ABS Guide for the Classification of Drilling Systems and

9、 in accordance with any Coastal State Regulations for the area of intended operation. 4 Required Documentation 4.1 The original equipment manufacturers data book is to be submitted for review and is to include the following information: Name of equipment Part number Name of manufacturer and supplier

10、 Serial number of main assemblies and/or components Description of design and manufacture, indicating safety factors used Statement of manufacture and inspection signed by the manufacturer Material certificates and indications where the various materials have been used for primary pressure retaining

11、 or controlling components Welding procedure specifications Report on nondestructive testing (including pressure and function testing), including where tests were performed 2 ABSGUIDANCE NOTES ON CERTIFICATION OF EXISTING BLOWOUT PREVENTERS AND ASSOCIATED SYSTEMS .2010 4.2 In cases where material ce

12、rtificates are not available, sample coupons are to be taken from major components for material testing and verification. 4.3 A record of all repairs and modifications to any of the covered equipment is to be submitted for review. 5 Survey Survey of all equipment to the equivalent of a Special Perio

13、dical Survey will be required. This survey is to be carried out by an ABS surveyor and is to include the following tests and inspections: i) Full dismantling of the BOP stack to each individual component to the extent associated with a major overhaul. ii) Internal examinations, including dimensional

14、 examination of the bore, ram pockets, hydraulic cylinders, locking mechanisms, and all ports and fittings. iii) Volumetric nondestructive testing of full penetration welds. iv) Hardness readings are to be taken at each weld in accordance with NACE MR 01-75. v) All sealing surfaces and ring grooves

15、are to be dimensionally examined and non-destructively tested by a suitable crack detection method. vi) A full-body test at 1.25 times the maximum allowable working pressure is to be carried out provided that there is verification that a 1.5 times the maximum allowable working pressure test was done

16、 at manufacture or the last major repair. If this verification cannot be made, then a test at 1.5 times maximum allowable working pressure will be required. vii) Function testing and pressure testing at rated working pressure of all controls and actuators (including umbilicals, hoses, jumpers and fl

17、exible lines) is to be carried out in accordance with the manufacturers testing plan and API RP 53. This plan is to be submitted to ABS for review prior to the test. viii) All blowout prevention components that may be subject to well pressure are to be tested, first to a low pressure of 200 to 300 p

18、si (1.38 to 2.1 MPa), and then to the maximum allowable working pressure of the equipment. The low pressure testing is to be carried out first and a stable low pressure test is to be maintained for at least 5 minutes. All testing is to be carried out in accordance with API RP 53 Section 18.3.2, incl

19、uding Table 3. ix) Shear rams and casing shear rams are to be tested in accordance with item viii) above and are to undergo operational testing with the maximum diameter and highest grade of pipe or casing that the design allows for. This test is to be witnessed by an ABS surveyor. 6 Maintenance of Certification Annual and Special Periodical Surveys are to be carried out in accordance with the requirements of the ABS Guide for the Classification of Drilling Systems.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1