1、 ABSGUIDE FOR BUILDING AND CLASSING DRILLSHIPS .2011 1 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS AUGUST 2011 CORRIGENDA/EDITORIALS 1 January 2012 CORRIGENDA/EDITORIALS 1 July 2013 CORRIGENDA/EDITORIALS 1 February 2014 Page No. Paragraph Comments Section 3 Loads 22 3/5.7.2(a) Definition of pn, to re
2、ad “2.06 N/cm2(0.21 kgf/cm2, 3.00 lbf/in2)”. Section 4 Initial Scantling Evaluation 54 4/3.3.2 In definition of SM, reference “3/3.3.1” to read “4/3.3.1”. 74 4/11.3 In U.S. units equation for t, “n.” to read “in.”. 79 4/13.5 In definition of pis, reference “4/11.5.1” to read “3/11.5.1”. Section 6 Hu
3、ll Structure Beyond 0.4L Amidships 122 6/9.1 Title to read “Deck Structures in Forebody”. Appendix 4 Finite Element Analysis for Drillships 182 A4/9.1xi) Reference “Appendix 4, Figure 4” to read “3 Appendix 4, Figure 1”. 188 A4/15.3.2 In definition of fvi, fhi, and fli, reference “A3/15.3.1” to read
4、 “A4/15.3.1”. 189 A4/15.3.3 In last line, reference “A4/15.5.3” to read “A4/15.3.2”. Appendix 5 Offshore Hull Construction Monitoring Program 196 A5/9 In Item iii), reference “3-2-7/5 and 7 of the MODU Rules” to read “7-1-2/11 of the MODU Rules”. 197 A5/9 In Note 4 of table, reference “3-2-7/5.1 of
5、the ABS Rules for Building and Classing Mobile Offshore Drilling Units” to read “7-1-2/11 of the ABS Rules for Building and Classing Mobile Offshore Drilling Units”. 197 A5/9 In Note 5 of table, reference “2-25 of the ABS Guide for Nondestructive Testing of Hull Welds” to read “8-3 of the ABS Guide
6、for Nondestructive Inspection of Hull Welds”. Appendix 6 Material Selection 198 A6/1 Reference “3-1-3/5 of the MODU Rules” to read “3-1-4/5 of the MODU Rules”. 199 A6/1.3 Reference “3-1-3/5 of the MODU Rules” to read “3-1-4/5 of the MODU Rules”. 200 A6/1.5.4 In Item i), reference “Section 3-1-3 of the MODU Rules” to read “Section 3-1-4 of the MODU Rules”.