ABS 184 CORR-2017 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS.pdf

上传人:孙刚 文档编号:400709 上传时间:2018-10-27 格式:PDF 页数:2 大小:37.17KB
下载 相关 举报
ABS 184 CORR-2017 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS.pdf_第1页
第1页 / 共2页
ABS 184 CORR-2017 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS AUGUST 2011 CORRIGENDA/EDITORIALS 1 January 2012 CORRIGENDA/EDITORIALS 1 July 2013 CORRIGENDA/EDITORIALS 1 February 2014 CORRIGENDA/EDITORIALS 1 February 2017 Page No. Paragraph Comments Section 3 Loads 22 3/5.7.2(a) Definition of pn, to read “2.06 N/cm2(0

2、.21 kgf/cm2, 3.00 lbf/in2)”. Section 4 Initial Scantling Evaluation 54 4/3.3.2 In definition of SM, reference “3/3.3.1” to read “4/3.3.1”. 74 4/11.3 In U.S. units equation for t, “n.” to read “in.”. 79 4/13.5 In definition of pis, reference “4/11.5.1” to read “3/11.5.1”. Section 6 Hull Structure Bey

3、ond 0.4L Amidships 122 6/9.1 Title to read “Deck Structures in Forebody”. Section 7 Topside and Hull Interface Structures 131 7/9.1.1(a)ii) Revise second paragraph to read, “For local detail FE model analyses (localized highly stressed area, 50 50 mm element size. In no case is the plate element siz

4、e required to be less than the plate thickness) provided fatigue strength is satisfied for the local detail:”. Appendix 4 Finite Element Analysis for Drillships 182 A4/9.1xi) Reference “Appendix 4, Figure 4” to read “3 Appendix 4, Figure 1”. 188 A4/15.3.2 In definition of fvi, fhi, and fli, referenc

5、e “A3/15.3.1” to read “A4/15.3.1”. 189 A4/15.3.3 In last line, reference “A4/15.5.3” to read “A4/15.3.2”. Appendix 5 Offshore Hull Construction Monitoring Program 196 A5/9 In Item iii), reference “3-2-7/5 and 7 of the MODU Rules” to read “7-1-2/11 of the MODU Rules”. 197 A5/9 In Note 4 of table, ref

6、erence “3-2-7/5.1 of the ABS Rules for Building and Classing Mobile Offshore Drilling Units” to read “7-1-2/11 of the ABS Rules for Building and Classing Mobile Offshore Drilling Units”. 197 A5/9 In Note 5 of table, reference “2-25 of the ABS Guide for Nondestructive Testing of Hull Welds” to read “

7、8-3 of the ABS Guide for Nondestructive Inspection of Hull Welds”. ABSGUIDE FOR BUILDING AND CLASSING DRILLSHIPS .2011 1 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Appendix 6 Material Selection 198 A6/1 Reference “3-1-3/5 of the MODU Rules” to read “3-1-4/5 of the MODU Rules”. 199 A6/1.3 Reference “3-1-3/5 of the MODU Rules” to read “3-1-4/5 of the MODU Rules”. 200 A6/1.5.4 In Item i), reference “Section 3-1-3 of the MODU Rules” to read “Section 3-1-4 of the MODU Rules”. 2 ABSGUIDE FOR BUILDING AND CLASSING DRILLSHIPS .2011

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1