ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf

上传人:王申宇 文档编号:400719 上传时间:2018-10-27 格式:PDF 页数:4 大小:50.37KB
下载 相关 举报
ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf_第1页
第1页 / 共4页
ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf_第2页
第2页 / 共4页
ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf_第3页
第3页 / 共4页
ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016 CORRIGENDA/EDITORIALS 1 February 2017 Page No. Paragraph Comments Foreword iii Foreword In sixth paragraph, reference “Appendix 1” to read “Annex 1”. iii Foreword In sixth paragraph, reference “4/3.4.3” to read “4/3.5”. iii Foreword In seventh paragraph

2、, reference “Appendix 2B” to read “Appendix 3”. iii Foreword In eighth paragraph, reference “Appendix 3B” to read “Appendix 5”. iv Foreword In ninth paragraph, reference “Appendices 2 and 3” to read “Appendices 3, 4 and 5”. iv Foreword In ninth paragraph, references “Appendices 2A and 3A accordingly

3、” to read “Appendices 4, 6 and 7, respectively”. Section 1 General 3 1/9 Reference “Appendix 1” to read “Annex 1”. Annex 1 United States Coast Guard Type Approval 6 1/Annex 1 In title, “Appendix 1” to read “Annex 1”. 6 1/Annex 1 At the end of the first paragraph, add, “which states the following:”.

4、Section 3 General Requirements 11 3/3 Delete last paragraph of Subsection 3/3. 11 3/5.1 Relocate last paragraph of Subsection 3/3 to first paragraph of 3/5.1: “To receive the BWT notation, the BWMS installed onboard is to receive a Type Approval Certificate issued by an IMO Member State. For a syste

5、m that makes use of active substances, documentation relating to the IMO Basic Approval and Final Approval are required to be submitted to ABS.”. ABSGUIDE FOR BALLAST WATER TREATMENT .2016 1 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Section 3 General Requirements 12 3/5.1 Rel

6、ocate text of 3/5.5 to the end of 3/5.1: “For obtaining ABS certification, the acceptability of an IMO Member State TA by ABS will be subject to the following requirements: i) The approval of a BWMS installation or the issuance of an ABS PDA/TA Certificate, will be subject to the condition that the

7、documentation submitted includes the current valid flag Administration TA Certificate, Instruction Manual with the associated original approved piping schematics, along with its related components positively identified in the vendors/manufacturers submission for review or approval. ii) The approval

8、of a BWMS installation will only be considered subject to, and only if, the exact configuration of the entire system, with each of its components has been included in the schematics to be approved, as identified in the documentation in 3/5.1i) above. iii) The acceptance of any deviation from the ori

9、ginal flag Administration TA will be subject to the submission of documentation to ABS, issued by the TA issuing flag Administration or an RO on behalf of the TA issuing flag Administration with the endorsement of the flag Administration certifying that the deviation is acceptable within the framewo

10、rk of the original flag Administration TA certification. Such certification of acceptance will not be valid if issued by an RO only, in lieu of issuance of certification by an RO on behalf of the TA issuing flag Administration.”. 12 3/5.1 In first line, “IMO Member State TA” to read “IMO Member Stat

11、e Type Approval (TA)”. 12 3/5.5 Delete 3/5.5. 12 3/7.1.1 In second paragraph, reference “Appendix 5” to read “Appendix 7”. 13 3/7.1.2 Revise “to maintain its currency” to read “and maintained up to date”. Section 4 System-Related and Installation Criteria 15 4/3xiii) Revise to read “If servicing haz

12、ardous ballast tanks and installed in a hazardous area, among the other requirements indicated in this Guide, the BWMS is to comply with Appendix 6. If installed in a non-hazardous area, the BWMS is to comply with Appendices 1, 2, 3, 4, and 5 of this Guide, as applicable.” 15 4/3xiii) Reference “App

13、endix 4” to read “Appendix 6”. 15 4/3xiii) Reference “Appendices 1, 2A, 2B, 3A and 3B” to read “Appendices 1, 2, 3, 4, and 5”. 16 4/3.3.1ii) Reference “4/3.4.3” to read “4/3.5”. 17 4/3.3.2ii) Reference “4/3.4.3” to read “4/3.5”. 17 4/3.3.2ii)a) Revise “shutdown” to read “shut down”. 17 4/3.3.2ii)b)1

14、) Revise “shutdown” to read “shut down”. 17 4/3.3.2ii)c)1) Revise “shutdown” to read “shut down”. 18 4/3.4 Revise title to read, “BWMS Installations in Hazardous Areas on the Deck of Oil Carriers, Chemical Carriers or Tank Barges”. 18 4/3.4i) Modified text “compartment” to read “compartments”. 18 4/

15、3.4.1 Revise title to read, “Requirements for Non-hazardous BWMS Compartments”. 2 ABSGUIDE FOR BALLAST WATER TREATMENT .2016 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Section 4 System-Related and Installation Criteria 18 4/3.4.1 Revise “may be considered as non-hazardous” to

16、read “may be considered and designated as non-hazardous”. 19 4/3.4.2 Revise title to read, “Requirements for Hazardous BWMS Compartments”. 19 4/3.4.2 Revise “60C (140F) (closed cup test), the ballast water” to read “60C (140F) (closed cup test), and the ballast water”. 19 4/3.4.2viii) Delete “For co

17、mpartments installed on the deck of a vessel”. 19 4/3.4.2ix) Reference “Appendix 4” to read “Appendix 6”. 20 4/3.4.3 Renumber as 4/3.5. 20 4/3.4.3 (New 4/3.5) Add date “(1 August 2016)”. 20 4/3.4.3ii)c) (New 4/3.5ii)c) Reference “4/3.4.3i)” to read “4/3.5i)”. 23 4/3.5 Renumber as 4/3.6. 25 4/3.11.1

18、Reference “Appendix 4” to read “Appendix 6”. 30 4/9.5.1 Reference “Appendix 4” to read “Appendix 6”. Section 5 Considerations for Oil, Gas, Chemical Carriers and Tank Barges 33 5/1.1 Renumber second and third i) as ii), and iii), respectively. 33 5/3ii) Reference “Appendix 4” to read “Appendix 6”. 3

19、4 5/7.3iii) Reference “Appendices 1, 2A, 2B, 3A and 3B” to read “Appendices 1, 2, 3, 4, and 5”. 34 5/7.3iv) Reference “A3A/3, A3A/5, A3A/7” to read “A4/3, A4/5, A4/7”. 34 5/7.3 Note 2 References “Appendix 2A” and “Appendix 2B”, to read “Appendix 2” and “Appendix 3”, respectively. 34 5/7.3 Note 3 Ref

20、erences “Appendix 3A” and “Appendix 3B”, to read “Appendix 4” and “Appendix 5”, respectively. 34 5/7.3 Note 4 Reference “Appendix 4” to read “Appendix 6”. Section 7 Survey Requirements 39 7/1.3 Revise “stripping, the duration” to read “stripping. The duration”. Section 8 Ballast Water Management Pla

21、n 42 8/3.3 Reference “Subsection 4/17” to read “Subsection 4/16”. 42 8/5 Reference “Appendix 5” to read “Appendix 7”. Appendix 2 Acceptable Isolation Arrangements of a BWMS Dosing Piping System on Oil or Chemical Tankers (From a Non-hazardous Area to a Hazardous Area) 46 A2 Renumber Appendix 2A as A

22、ppendix 2. 46 A2 In first paragraph of item 7, reference “A3A/3” to read “A4/7”. 46 A2 In item 7c), references “A3A/3”, “A3A/5”, and “A3A/7” to read “A4/7”, “A4/7”, and “A4/7”, respectively. ABSGUIDE FOR BALLAST WATER TREATMENT .2016 3 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comment

23、s Appendix 3 Acceptable Isolation Arrangement of a BWMS Dosing Piping system on Oil or Chemical Tankers (From a Non-hazardous Compartment to a non-hazardous Area Routed Through a Hazardous Area) 48 A3 Renumber Appendix 2B as Appendix 3. 48 A3 In first paragraph, reference “4/3.4.3” to read “4/3.5”.

24、49 A3 In item 4, “penetration of piping” to read “penetration by piping”. Appendix 4 BWMS in a Non-hazardous Area Serving Ballast Tanks in a Hazardous Area 51 A4 Renumber Appendix 3A as Appendix 4. 51 A4/1 In item 1, references “Appendix 2A, Figure 1” and “Appendix 2B, Figure 1”, to read “Appendix 2

25、, Figure 1” and “Appendix 3, Figure 1”, respectively. 54 A4/7 In item 1, references “A3A/5.3.1”, “A3A/5.3.2”, and “A3A/5.3.3” to read “A4/5.3.1”, “A4/5.3.2”, and “A4/5.3.3”, respectively. 55 A4/9 In Figure, references “A3/3”, “A3/5”, and “A3/7” to read “A4/3”, “A4/5”, and “A4/7”, respectively. 55 A4

26、/9 In item 1, references “A3A/3”, “A3A/5”, and “A3A/7” to read “A4/3”, “A4/5”, and “A4/7”, respectively. Appendix 5 BWMS Installations on Dedicated Articulated Tug-Barge (ATB) Combinations 56 A5 Renumber Appendix 3B as Appendix 5. 56 A5/1 In second-to-last paragraph, reference “3/5.5” to read “3/5.1

27、”. 57 A5/3vi) Reference “Appendix 3B, Figure 1” to read “Appendix 5, Figure 1”. 57 A5/3vi)i) Reference “Appendix 3B, Figure 1” to read “Appendix 5, Figure 1”. 57 A5/3vi)ii) References “A3A/1”, “A3A/3”, “A3A/5”, and “A3A/7” to read “A4/1”, “A4/3”, “A4/5”, and “A4/7”, respectively. 57 A5/3vi) Referenc

28、e “Appendix 3B, Figure 2” to read “Appendix 5, Figure 2”. 57 A5/3vi)i) Reference “Appendix 3B, Figure 2” to read “Appendix 5, Figure 2”. 57 A5/3vi)ii) Reference “Appendix 2A” to read “Appendix 2”. 57 A5/3vi) Reference “Appendix 3B, Figure 3” to read “Appendix 5, Figure 3”. 57 A5/3vi)i) Reference “Ap

29、pendix 3B, Figure 3” to read “Appendix 5, Figure 3”. 57 A5/3vi)iii) Reference “Appendix 3A” to read “Appendix 4”. 57 A5/3vi)iv) Reference “Appendix 2A” to read “Appendix 2”. 58 A5, Figure 1 Reference “App. 3” to read “App. 4”. 60 A5, Figure 3 Reference “App. 3” to read “App. 4”. Appendix 6 Additional Arrangements for the Placement of Electric Equipment in Hazardous Areas 61 A6 Renumber Appendix 4 as Appendix 6. Appendix 7 Ballast Water Management Plan 63 A7 Modified Title “Appendix 5” to read “Appendix 7”. 4 ABSGUIDE FOR BALLAST WATER TREATMENT .2016