ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf

上传人:ideacase155 文档编号:400767 上传时间:2018-10-27 格式:PDF 页数:649 大小:13.84MB
下载 相关 举报
ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf_第1页
第1页 / 共649页
ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf_第2页
第2页 / 共649页
ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf_第3页
第3页 / 共649页
ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf_第4页
第4页 / 共649页
ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf_第5页
第5页 / 共649页
亲,该文档总共649页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Updates February 2016 consolidation includes: January 2016 version plus Corrigenda/Editorials Rule Change Notice (201 6 ) Rule Change Notice (2016) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Pa

2、rt. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993

3、 Listing by Effective Dates of Changes from the 2015 Rules The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective e.g., 7-3-2/1.1.8 “Structural Fire Protection” (1 July 2015) is to apply for vess

4、els undergoing survey on or after 1 July 2015. Notice No. 1 (effective on 1 July 2015) to the 2015 Rules, which is incorporated in the 2016 Rules, is summarized below. EFFECTIVE DATE 1 July 2015 shown as (1 July 2015) Part/Para. No. Title/Subject Status/Remarks 7-3-1/13 Vessels with the SH, SHCM Not

5、ation To specify that areas identified as critical areas in the SHCM plan should be specially considered when preforming visual examination of spaces. (Incorporates Notice No. 1) 7-3-2/1.1.8 Structural Fire Protection To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7

6、-4-1/1xvi) To clarify the requirements. (Incorporates Notice No. 1) 7-4-1/1xxvi) (New) To align the requirements with Section 3-2-13 of the Steel Vessel Rules. (Incorporates Notice No. 1) 7-4-1/1xxvii) (New) To align the requirements with 4-3-3/9.5 of the Steel Vessel Rules. (Incorporates Notice No.

7、 1) 7-6-2/1.1.9(g) Fixed Fire Fighting System To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7-6-2/3.1.1(t) (New) CO2 and Foam Systems To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7-6-2/3.1.1(u) (New) Fixed Water Spray Systems To

8、provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7-9-16 Crew Habitability on Ships To consolidate the survey requirements for ship and workboat Habitability notations in Part 7. (Incorporates Notice No. 1) 7-9-17 Crew Habitability on Ships To consolidate the survey requi

9、rements for ship and yacht Comfort notations in Part 7. (Incorporates Notice No. 1) 7-9-18 (New) Compliance with the ILO Maritime Labour Convention, 2006 Title 3 Requirements To consolidate the survey requirements for Accommodation notations in Part 7. (Incorporates Notice No. 1) 7-9-19 Yachts To al

10、ign the requirements with the new Yacht Guide. (Incorporates Notice No. 1) ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 iii EFFECTIVE DATE 1 January 2016 shown as (2016) Part/Para. No. Title/Subject Status/Remarks 7-2-1/5.5 Unusual Cases To specify requirements for laid-up vessels. 7-2-1/13 Tailshaf

11、t Surveys To update procedures and methods for tailshaft surveys. 7-3-2/5.1.14(e) To clarify that only mast connection points are to be examined, not the rigging, sails, or spars. 7-3-2/9.5.2 To align the requirements with IACS UR Z10.1, Z10.2, Z10.3, Z10.4, and Z10.5 and to refer to the ABS Health

12、and Safety Manual. 7-3-2/9.5.9 (Deleted) To remove requirements covered by IACS PR 37, which are covered in the ABS Health and Safety Manual. 7-3-2/9.5.10 (Deleted) To remove requirements covered by IACS PR 37, which are covered in the ABS Health and Safety Manual. 7-3-2/11.5.6 To align the requirem

13、ents with IMO Ship Construction File Guidelines. 7-3-2/11.7 (New) Review of Documentation on Board To align the requirements with IMO Ship Construction File Guidelines. 7-5-1/1 (New) General To update procedures and methods for tailshaft surveys. 7-5-1/3 (New) Definitions To update procedures and me

14、thods for tailshaft surveys. 7-5-1/5 (New) Oil Lubricated Shafts or Closed Loop System Fresh Water Lubricated Shafts (Closed System) To update procedures and methods for tailshaft surveys. 7-5-1/7 (New) Water Lubricated Shafts (Open Systems) To update procedures and methods for tailshaft surveys. 7-

15、6-2/1.5.1ii) Operating and Maintenance Instruction Manual To clarify that the Operating and Maintenance Instruction Manual is not required to be approved. 7-6-2/1.7.1ii) Operating and Maintenance Instruction Manual To clarify that the Operating and Maintenance Instruction Manual is not required to b

16、e approved. 7-6-2/3.1.2(a) Main and Auxiliary Internal Combustion Engines To specify that medium speed diesels should not be treated differently than slow speed diesels. 7-9-10/3 (New) Vessels with SPS Notation To provide ship-specific requirements for equipment, safety devices, and documentation fo

17、r OSVs. 7-9-10/5 (New) Offshore Supply Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/7 (New) Vessels with the Supply HNLS Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-1

18、0/9 (New) Vessels with the AH, TOW, and AH, TOW Notations To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/11 (New) Vessels with the ROV Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-

19、9-10/13 (New) Vessels with the ROV Capable and DSV Capable Notations To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/15 (New) Vessels with the DSV Notation To provide ship-specific requirements for equipment, safety devices, and documentation f

20、or OSVs. 7-9-10/17 (New) Vessels with the Pipe Lay Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/19 (New) Vessel with the Heavy Lift Notation To provide ship-specific requirements for equipment, safety devices, and documentation for

21、OSVs. 7-9-10/21 (New) Vessels with the Escort or QR Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. iv ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 Part/Para. No. Title/Subject Status/Remarks 7-9-10/23 (New) Vessels with the WIND-IMR Notation

22、 To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/25 (New) Vessels with the Cable Lay Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/27 (New) Vessels with the WI Notation To provi

23、de ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/29 (New) Vessels with in the WI-Ready Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/31 (New) Vessels with the WI-Temp Notation To provide

24、 ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/33 (New) Well Intervention Vessels with no Specific Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/35 (New) OSV Well Stimulation Vessel with

25、 no Class Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/37 (New) Vessels with the WS-Ready Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/39 (New) Vessels with the WS-

26、Temp Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/41 (New) Vessels with the WS Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/43 (New) Vessels with Well Test Systems

27、with no Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/45 (New) Vessels with the WT-Ready and WT-Temp Notations To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/47 (New) Vessels w

28、ith the Well Test Service Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-A-4/Table 2 Individual Wastage Allowances, Conventional Vessels Under 90 Meters (295 Feet) To align the requirements with IACS and the ABS Steel Vessel Rules. 7-A-12/

29、9 Personnel Requirements To provide reference to applicable standards for operator training and qualification for NDT. 7-A-14/13.1 General To encourage operators to apply planned maintenance activities on their assets. 7-A-14/15.1 General To encourage operators to apply condition monitoring techniqu

30、es as a part of the maintenance activities on their assets. 7-A-14/15.9.4 Diesel Engine Bearing Wear Monitoring Systems To clarify that the system to be installed is to be type approved and the technician should know how and where to install the critical sensors for the system. ABSRULES FOR SURVEY A

31、FTER CONSTRUCTION .2016 v PART Foreword 7 Foreword (2001) In an effort to facilitate usage and better maintain survey after construction Rules, ABS has consolidated twenty-two (22) ABS Rules and Guides into this “Rules for Survey after Construction” booklet for 2001. These requirements apply to and

32、supersede all survey after construction Rules required by the ABS Rules and Guides listed in Chapter 1, Section 1, Subsection 1 “Application” (7-1-1/1) of these Rules. These Rules do not apply to any other ABS Rules or Guide containing survey after construction requirements unless a particular Rule

33、or Guide references any of the survey requirements of the ABS Rules or Guides listed in 7-1-1/1. Chapters 1 through 8 contains survey Rules that have common requirements for different vessel types and geographical service areas. Where survey requirements differ according to the vessels geographical

34、limitation in these Rules, the chapter has been sectioned into Unrestricted Service, Great Lakes Service, and Rivers and Intracoastal Waterways Services. Where survey requirements are common to different vessel types, each survey type will contain requirements applicable to all vessels. When additio

35、nal requirements are applicable to a specific vessel type, or are in lieu of the common requirement, they will be listed after the requirements for all vessels. The requirements for vessels in the Enhanced Survey Program (ESP) have been incorporated into each survey type. Chapter 9 contains survey r

36、equirements to maintain a Class Notation for an additional system or service. Chapters 10 through 12 contain unique survey Rules for Floating Drydocks, Underwater Vehicles and Sailing Yachts not Receiving AMS Notation. The survey interval and survey requirements noted in these chapters only apply to

37、 these vessel types. The Appendix includes several ABS Guides relating to survey after construction and also contains planning, reporting and certification of thickness measurement firms required by the Enhanced Survey Program. In order to further explain the new formatting contained in these Rules,

38、 sample vessels and their applicable survey requirements are illustrated in the table on the following page. vi ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 Examples: Sample Vessels: null A1 Bulk Carrier, null, null AMS, null ACCU (ESP) null A1 Oil Carrier, null, null AMS (ESP) A1 Container Carrier,

39、 AMS, ACCU, OMBO null A1 Barge, River, Bay and Sound Service Survey Type Bulk Carrier Oil Carrier Container Carrier Barge Annual Survey Hull All Vessel Requirements Specific Vessel requirements 7-3-2/1.1 7-3-2/1.7 7-3-2/1.1 7-3-2/1.13 7-3-2/1.1 7-3-2/1.1 7-3-2/1.5 Intermediate Survey Hull All Vessel

40、 Requirements Specific Vessel requirements 7-3-2/3.1 7-3-2/3.7 7-3-2/3.1 7-3-2/3.17 7-3-2/3.1 7-3-2/3.1 7-3-2/3.5 Special Periodical Survey Hull All Vessel Requirements Specific Vessel requirements Thickness Measurement requirements 7-3-2/5.1 7-3-2/5.7 7-3-2/5.7.3 7-3-2/5.1 7-3-2/5.13 7-3-2/5.13.4 7

41、-3-2/5.1 7-3-2/5.1.14(c) 7-3-2/5.1 7-3-2/5.5 7-3-4/1 7-3-4/1.3 Drydocking Survey 7-4-1/1 7-4-1/1 7-4-1/1 7-4-1/1 Tailshaft Survey 7-5-1/1 7-5-1/1 7-5-1/1 Not applicable Annual Survey Machinery All Vessel Requirements Specific Vessel requirements OMBO notation 7-6-2/1.1 7-6-2/1.1 7-6-2/1.3 7-6-2/1.1

42、7-9-3/1.1 7-6-2/1.1 Special Periodical Survey Machinery All Vessel Requirements Specific Vessel requirements 7-6-2/3.1 7-6-2/3.1 7-6-2/3.3 7-6-2/3.1 7-6-2/3.1 Boiler Survey 7-7-1 7-7-1 7-7-1 Not applicable Annual Survey Automation 7-8-1 7-8-1 7-8-1 Not applicable Special Periodical Survey Automation

43、 7-8-2 7-8-2 7-8-2 Not applicable ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 vii PART Table of Contents 7 Rules for Survey After Construction CONTENTS CHAPTER 1 Conditions for Survey After Construction . 1 Section 1 General Information . 3 CHAPTER 2 Survey Intervals 15 Section 1 Vessels for Unrest

44、ricted Service 17 Section 2 Vessels in Great Lakes Service . 23 Section 3 Vessels in Rivers and Intracoastal Waterway Service 25 Section 4 Survey After Ocean Transit Tow 27 CHAPTER 3 Hull Surveys 28 Section 1 Requirements for Internal Examination of All Vessels . 31 Section 2 Vessels for Unrestricte

45、d Service 35 Section 3 Vessels in Great Lakes Service . 131 Section 4 Vessels in Rivers and Intracoastal Waterways Service . 133 CHAPTER 4 Drydocking Surveys . 134 Section 1 Survey Requirements 135 CHAPTER 5 Tailshaft Surveys 137 Section 1 Survey Requirements 139 Section 2 Allowable Bearing Weardown

46、 146 CHAPTER 6 Machinery Surveys . 147 Section 1 General 148 Section 2 Survey Requirements 149 Section 3 Vessels in Great Lakes Service . 167 CHAPTER 7 Boiler Surveys 168 Section 1 Survey Requirements 169 CHAPTER 8 Shipboard Automatic and Remote-control Systems . 171 Section 1 Annual Surveys 172 Sec

47、tion 2 Special Periodical Surveys 173 viii ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 CHAPTER 9 Survey Requirements for Additional Systems and Services . 174 Section 1 Cargo Refrigeration Systems . 179 Section 2 Hull Condition Monitoring System 185 Section 3 One Man Bridge Operated System 186 Sect

48、ion 4 Propulsion Redundancy System 187 Section 5 Quick Release System. 188 Section 6 Thrusters and Dynamic Positioning System 189 Section 7 Vapor Emission Control Systems 194 Section 8 Fire Fighting Service 197 Section 9 Safety Standby Service 199 Section 10 Offshore Installations Support Service 20

49、1 Section 11 Oil Recovery Service . 212 Section 12 Automatic or Remote Control and Monitoring Systems for Vessels in Port 214 Section 13 Bridge Design and Navigational Equipment/Systems . 215 Section 14 Integrated Tug-Barge (ITB) Combinations Intended to Operate on the Great Lakes 216 Section 15 Environmental Safety . 217 Section 16 Crew Habitability on Ships and Workboats . 220 Section 17 Comfort on Ships and Yachts 222 Section 18 Compliance with the ILO Maritime Labour Convention, 2006 Title 3 Req

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1