ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf

上传人:ideacase155 文档编号:400768 上传时间:2018-10-27 格式:PDF 页数:663 大小:4.87MB
下载 相关 举报
ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf_第1页
第1页 / 共663页
ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf_第2页
第2页 / 共663页
ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf_第3页
第3页 / 共663页
ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf_第4页
第4页 / 共663页
ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf_第5页
第5页 / 共663页
亲,该文档总共663页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Part 7: Rules for Survey After Construction RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Rule

2、 Change Notice (201 7 ) Rule Change Notice (2017) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following e

3、ffective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2016 Rules The reference date which is indicated in

4、 the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective e.g., 7-3-2/3.15.3(a)i) “Ballast Tanks” (1 July 2016) is to apply for vessels undergoing survey on or after 1 July 2016. Notice No. 1 (effective on 1 July 2016) to the 2016 Rules,

5、which is incorporated in the 2017 Rules, is summarized below. EFFECTIVE DATE 1 July 2016 shown as (1 July 2016) Part/Para. No. Title/Subject Status/Remarks 7-3-1/13 Vessels with the SH, SHCM or CSR, AB-CM Notation To specify that areas identified as critical areas should be specially considered when

6、 preforming visual examination of spaces. (Incorporates Notice No. 1) 7-3-2/3.15.3(a)i) Ballast Tanks To align the requirements with IACS requirements. (Incorporates Notice No. 1) 7-3-2/5.7.4(a)iv) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurement

7、s taken. (Incorporates Notice No. 1) 7-3-2/5.7.4(b)vi) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.7.4(c)vi) To clarify that vessels parts that are inaccessible need not be surveyed or have thickne

8、ss measurements taken. (Incorporates Notice No. 1) 7-3-2/5.7.4(d)vi) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.13.6(b) Note i) To clarify that what is to be included in the tank testing procedure

9、. (Incorporates Notice No. 1) 7-3-2/5.14.6(b) Note i) To clarify that what is to be included in the tank testing procedure. (Incorporates Notice No. 1) 7-3-2/5.15.4(a)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Not

10、ice No. 1) 7-3-2/5.15.4(b)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.15.4(c)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (In

11、corporates Notice No. 1) 7-3-2/5.15.4(d)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.19.4(a)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measure

12、ments taken. (Incorporates Notice No. 1) ii ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 Part/Para. No. Title/Subject Status/Remarks 7-3-2/5.19.4(b)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.

13、19.4(b)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.19.4(c)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice

14、 No. 1) 7-3-2/5.19.4(c)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.19.4(d)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Inc

15、orporates Notice No. 1) 7-3-2/5.19.4(d)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.21.6(b) Note i) To clarify that what is to be included in the tank testing procedure. (Incorporates Notice No.

16、1) 7-A-16/Table 7 Minimum Requirements for CLOSE-UP Examination at Special Periodical Surveys Bulk Carriers Non Double Skin ESP and Bulk Carrier Features of Combination Carriers Non Double Skin ESP To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurement

17、s taken. (Incorporates Notice No. 1) 7-A-16/Table 11 Minimum Requirements for CLOSE-UP Examination at Special Periodical Surveys Tankers ESP (Oil Carriers and Oil Carrier Features of Combination Carriers Double Hull) and Oil/Fuel Oil Tank Barges Double Hull 122 meters (400 feet) and over in Length T

18、o clarify the requirements for survey for structural elements. (Incorporates Notice No. 1) 7-A-16/Table 15 Minimum Requirements for CLOSE-UP Examination at Special Periodical Surveys Bulk Carriers Double Skin ESP and Bulk Carrier Features of Combination Carriers Double Skin ESP To clarify that vesse

19、ls parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) EFFECTIVE DATE 1 January 2017 shown as (2017) Part/Para. No. Title/Subject Status/Remarks 7-1-1/1.7.1(b) Bulk Carrier To align the requirements with IACS UR Z11 Rev. 5. 7-1-1/1.7.1(c

20、) Ore Carrier To align the requirements with IACS UR Z11 Rev. 5. 7-2-1/13.3.1(a) Extension up to Three (3) Months To clearly specify the “two-and-a-half year extension”. 7-2-1/13.3.1(b) Extension up to One (1) Year To clearly specify the “two-and-a-half year extension”. 7-3-2/1.13.4 Cargo Pump Room

21、To incorporate requirements from OCIMF 1.e) and ISGOTT 10.11.3. 7-3-2/1.21 (New) Compressed Natural Gas Carriers To consolidate survey requirements by relocating the requirements from the ABS Guide for Vessels Intended to Carry Compressed Natural Gas in Bulk. 7-3-2/5.23 (New) Compressed Natural Gas

22、Carriers To consolidate survey requirements by relocating the requirements from the ABS Guide for Vessels Intended to Carry Compressed Natural Gas in Bulk. 7-5-1/3.37 Alternative Means To clarify that a tailshaft condition monitoring system and/or similar program are acceptable in lieu of meeting so

23、me requirements for other systems. ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 iii Part/Para. No. Title/Subject Status/Remarks 7-6-2/3.1.1(t) Fixed Gas and Foam Extinguishing Systems To clarify the titles of the sections. 7-6-2/3.1.1(u) Fixed Water Spray and Mist Systems To clarify the titles of th

24、e sections. 7-7-1/9 Hydrostatic Testing To clarify the requirements. 7-9-6/3.1 Annual Surveys To provide sets of tests required to be done annually. 7-9-6/3.5 Special Surveys To provide sets of tests required to be done annually. 7-9-23 Inventory of Hazardous Materials To consolidate survey requirem

25、ents by relocating the requirements from the ABS Guide For The Inventory Of Hazardous Materials. 7-11-2/3 Special Periodical Surveys To correct the Special Periodical Survey (SPS) definition by removal the three (3) month window after the date of build for completion of SPS and to align with definit

26、ion in 7-2-1/5 for vessels with unrestricted service. 7-11-4/1.5 Ballasting and Deballasting Systems To indicate that pressure testing to 1.25 times the MAWP only applies to piping systems exposed to seawater. 7-11-7 (New) Relocation or Reinstallation of Portable Diving Systems To add requirements f

27、or relocation/reinstallation of a portable diving system. 7-A-4/23 Thickness Measurements Carried Out Afloat To remove the requirement for submitting of request for thickness measurement afloat authorization, as it is no longer ABS Survey practice 7-A-11/Figure 3B (New) Location for Hardness Measure

28、ments Across the Weldment To clearly indicate location for hardness measurements during weld procedure qualification for repair of shafts. 7-A-14/15 Condition Monitoring (CM) To add new requirements for Condition Based Maintenance. 7-A-14/18 (New) Condition Based Maintenance (CBM) To add new require

29、ments for Condition Based Maintenance. iv ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 PART Foreword 7 Foreword (2001) In an effort to facilitate usage and better maintain survey after construction Rules, ABS has consolidated twenty-two (22) ABS Rules and Guides into this “Rules for Survey after Con

30、struction” booklet for 2001. These requirements apply to and supersede all survey after construction Rules required by the ABS Rules and Guides listed in Chapter 1, Section 1, Subsection 1 “Application” (7-1-1/1) of these Rules. These Rules do not apply to any other ABS Rules or Guide containing sur

31、vey after construction requirements unless a particular Rule or Guide references any of the survey requirements of the ABS Rules or Guides listed in 7-1-1/1. Chapters 1 through 8 contains survey Rules that have common requirements for different vessel types and geographical service areas. Where surv

32、ey requirements differ according to the vessels geographical limitation in these Rules, the chapter has been sectioned into Unrestricted Service, Great Lakes Service, and Rivers and Intracoastal Waterways Services. Where survey requirements are common to different vessel types, each survey type will

33、 contain requirements applicable to all vessels. When additional requirements are applicable to a specific vessel type, or are in lieu of the common requirement, they will be listed after the requirements for all vessels. The requirements for vessels in the Enhanced Survey Program (ESP) have been in

34、corporated into each survey type. Chapter 9 contains survey requirements to maintain a Class Notation for an additional system or service. Chapters 10 through 12 contain unique survey Rules for Floating Drydocks, Underwater Vehicles and Sailing Yachts not Receiving AMS Notation. The survey interval

35、and survey requirements noted in these chapters only apply to these vessel types. The Appendix includes several ABS Guides relating to survey after construction and also contains planning, reporting and certification of thickness measurement firms required by the Enhanced Survey Program. In order to

36、 further explain the new formatting contained in these Rules, sample vessels and their applicable survey requirements are illustrated in the table on the following page. ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 v Examples: Sample Vessels: null A1 Bulk Carrier, null, null AMS, null ACCU (ESP) nul

37、l A1 Oil Carrier, null, null AMS (ESP) A1 Container Carrier, AMS, ACCU, OMBO null A1 Barge, River, Bay and Sound Service Survey Type Bulk Carrier Oil Carrier Container Carrier Barge Annual Survey Hull All Vessel Requirements Specific Vessel requirements 7-3-2/1.1 7-3-2/1.7 7-3-2/1.1 7-3-2/1.13 7-3-2

38、/1.1 7-3-2/1.1 7-3-2/1.5 Intermediate Survey Hull All Vessel Requirements Specific Vessel requirements 7-3-2/3.1 7-3-2/3.7 7-3-2/3.1 7-3-2/3.17 7-3-2/3.1 7-3-2/3.1 7-3-2/3.5 Special Periodical Survey Hull All Vessel Requirements Specific Vessel requirements Thickness Measurement requirements 7-3-2/5

39、.1 7-3-2/5.7 7-3-2/5.7.3 7-3-2/5.1 7-3-2/5.13 7-3-2/5.13.4 7-3-2/5.1 7-3-2/5.1.14(c) 7-3-2/5.1 7-3-2/5.5 7-3-4/1 7-3-4/1.3 Drydocking Survey 7-4-1/1 7-4-1/1 7-4-1/1 7-4-1/1 Tailshaft Survey 7-5-1/1 7-5-1/1 7-5-1/1 Not applicable Annual Survey Machinery All Vessel Requirements Specific Vessel require

40、ments OMBO notation 7-6-2/1.1 7-6-2/1.1 7-6-2/1.3 7-6-2/1.1 7-9-3/1.1 7-6-2/1.1 Special Periodical Survey Machinery All Vessel Requirements Specific Vessel requirements 7-6-2/3.1 7-6-2/3.1 7-6-2/3.3 7-6-2/3.1 7-6-2/3.1 Boiler Survey 7-7-1 7-7-1 7-7-1 Not applicable Annual Survey Automation 7-8-1 7-8

41、-1 7-8-1 Not applicable Special Periodical Survey Automation 7-8-2 7-8-2 7-8-2 Not applicable vi ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 PART Table of Contents 7 Rules for Survey After Construction CONTENTS CHAPTER 1 Conditions for Survey After Construction . 1 Section 1 General Information . 3

42、 CHAPTER 2 Survey Intervals . 15 Section 1 Vessels for Unrestricted Service 17 Section 2 Vessels in Great Lakes Service . 23 Section 3 Vessels in Rivers and Intracoastal Waterway Service 25 Section 4 Survey After Ocean Transit Tow 27 CHAPTER 3 Hull Surveys . 28 Section 1 Requirements for Internal Ex

43、amination of All Vessels . 31 Section 2 Vessels for Unrestricted Service 35 Section 3 Vessels in Great Lakes Service . 135 Section 4 Vessels in Rivers and Intracoastal Waterways Service . 137 CHAPTER 4 Drydocking Surveys. 138 Section 1 Survey Requirements 139 CHAPTER 5 Tailshaft Surveys . 141 Sectio

44、n 1 Survey Requirements 143 Section 2 Allowable Bearing Weardown 150 CHAPTER 6 Machinery Surveys 151 Section 1 General 152 Section 2 Survey Requirements 153 Section 3 Vessels in Great Lakes Service . 171 CHAPTER 7 Boiler Surveys 172 Section 1 Survey Requirements 173 CHAPTER 8 Shipboard Automatic and

45、 Remote-control Systems . 175 Section 1 Annual Surveys 176 Section 2 Special Periodical Surveys 177 ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 vii CHAPTER 9 Survey Requirements for Additional Systems and Services 178 Section 1 Cargo Refrigeration Systems . 183 Section 2 Hull Condition Monitoring S

46、ystem 189 Section 3 One Man Bridge Operated System 190 Section 4 Propulsion Redundancy System 191 Section 5 Quick Release System . 192 Section 6 Thrusters and Dynamic Positioning System 193 Section 7 Vapor Emission Control Systems 199 Section 8 Fire Fighting Service 202 Section 9 Safety Standby Serv

47、ice 204 Section 10 Offshore Installations Support Service 206 Section 11 Oil Recovery Service . 217 Section 12 Automatic or Remote Control and Monitoring Systems for Vessels in Port 219 Section 13 Bridge Design and Navigational Equipment/Systems . 220 Section 14 Integrated Tug-Barge (ITB) Combinatio

48、ns Intended to Operate on the Great Lakes 221 Section 15 Environmental Safety . 222 Section 16 Crew Habitability on Ships and Workboats 225 Section 17 Comfort on Ships and Yachts 227 Section 18 Compliance with the ILO Maritime Labour Convention, 2006 Title 3 Requirements . 230 Section 19 Yachts 232

49、Section 20 Tailshaft Condition Monitoring . 233 Section 21 Oil Carriers Equipped for Mooring at Single Point Moorings 234 Section 22 Inert Gas Systems for Ballast Tanks . 235 Section 23 Inventory of Hazardous Materials 236 CHAPTER 10 Steel Floating Drydocks . 237 Section 1 Survey Interval . 238 Section 2 Hull Surveys . 239 Section 3 Machinery Surveys 241 CHAPTER 11 Underwater Vehicles, Systems and Hyperbaric Facilities 242 Section 1 General 245 Section 2 Survey Interval . 246 Section 3 Annual Surveys 247 Section 4 Special Periodical Surveys 2

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1