ABS 227-2017 GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS.pdf

上传人:registerpick115 文档编号:400827 上传时间:2018-10-27 格式:PDF 页数:25 大小:232.34KB
下载 相关 举报
ABS 227-2017 GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS.pdf_第1页
第1页 / 共25页
ABS 227-2017 GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS.pdf_第2页
第2页 / 共25页
ABS 227-2017 GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS.pdf_第3页
第3页 / 共25页
ABS 227-2017 GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS.pdf_第4页
第4页 / 共25页
ABS 227-2017 GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS.pdf_第5页
第5页 / 共25页
亲,该文档总共25页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Guide for Lay- up and Reactivation of Mobile Offshore Drilling Units GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS JUNE 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS

2、Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword (1 June 2017) This Guide has been prepared by the American Bureau of Shipping to provide Owners guidelines for the lay-up and reactivation of Mobile Offshore Drilling Units. These guidelines are of a general nature due to the wide

3、variety of MODU configurations, geographic and metocean conditions of lay-up sites and degree of maintenance during lay-up. This Guide expands the “Laid-up” status to provide more precise definitions regarding exact status of a stacked unit. This Guide provides the following five options for laid-up

4、 life cycle status for units classed with ABS: i) Laid-up with no Record Comment ii) Laid-up with the following Record Comments: a) Laid-up Warm Stacked b) Laid-up Cold Stacked c) Enhanced Laid-up Warm Stacked d) Enhanced Laid-up Cold Stacked These conditions will be noted in the units survey status

5、 and the Record. This Guide also introduces an “Enhanced” status for a laid up unit, which means that the unit has had its lay-up location and procedures reviewed and verified by ABS in accordance with this Guide. The goal of having a unit enrolled in Enhanced lay-up is to preserve the total asset v

6、alue, potentially qualify for a reduced insurance premium while stacked, along with reducing the time and cost for reactivation. This Guide becomes effective on the first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this ver

7、sion of this Guide is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. ii ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 Table of Contents GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLI

8、NG UNITS CONTENTS SECTION 1 General 1 1 General . 1 3 Definitions . 1 3.1 Life Cycle Status “Laid-up” 1 3.3 Record Comment “Laid-up Warm Stacked” . 1 3.5 Record Comment “Laid-up Cold Stacked” . 2 3.7 “Enhanced” Record Comment . 2 5 Lay-up Surveys . 2 7 Maintenance of Record Comment 2 9 Lay-up Overvi

9、ew . 3 SECTION 2 Lay-up and Surveys of Laid-up Mobile Offshore Drilling Units . 4 1 Lay-up Procedure Requirements 4 3 Fire and Safety Requirements for all Laid-up Units 4 3.1 Fire and Safety Requirements for Units Laid-up Warm Stacked . 6 3.3 Fire and Safety Requirements for Units Laid-up Cold Stack

10、ed . 6 5 Preservation and Maintenance for all Units 6 5.1 General 6 5.3 Hull and Deck Equipment 7 5.5 Machinery Spaces and Machinery 8 5.7 Boilers . 9 5.9 Boiler Stack Openings . 9 5.11 Electrical Installation 9 5.13 Elevating and Skidding Systems . 10 5.15 Control Systems 10 5.17 Drilling Equipment

11、 . 10 5.19 Optional Lay-up Site and Station Keeping (Mooring) Arrangements 10 7 Surveys . 12 7.1 Initial Lay-up Survey 12 7.3 Annual Surveys . 12 ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 iii SECTION 3 Enhanced Lay-up 13 1 Submittals . 13 1.1 Overall Lay-up Procedu

12、re Describing the Following 13 1.3 Risk Assessment . 13 1.5 Mooring 14 1.7 Manning . 14 1.9 Security 15 1.11 Stability 15 1.13 Services . 15 1.15 Port and Flag State Requirements . 15 1.17 Procedures and Standards for Preservation 15 1.19 Safety Manual 15 1.21 Maintenance Plan 15 1.23 Remote Monitor

13、ing Systems 16 1.25 Repair and Maintenance Log . 16 3 Surveys . 16 3.1 Initial Lay-up Survey 16 3.3 Annual Surveys 16 SECTION 4 Reactivation of Laid-up Mobile Offshore Drilling Units 17 1 General . 17 3 Reactivation Procedures for Units with “Enhanced” Record Comment . 18 5 Hull and Outfit . 18 5.1

14、Underwater Examination . 18 5.3 Witnessing of Functional Testing or Verification of Fitness for Service . 18 7 Machinery 19 9 Elevating Systems and Cantilever Hold Downs 19 11 Electrical 20 13 Drilling Equipment . 20 15 Control Systems and Instrumentation . 20 15.1 Software 20 15.3 Hardware . 21 17

15、Cranes . 21 19 Propulsion Trials and Sea Trials . 21 21 Documentation and Certification . 21 iv ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 Section 1: General SECTION 1 General (1 June 2017) At the request of the owner and to assist in the maintenance of class, ABS w

16、ill review, survey, and confirm by issuance of a factual Lay-up Report, the actions taken to preserve and protect a unit in lay-up. This Guide contains those precautions and procedures considered by ABS to accomplish this objective; alternative approaches to accomplish the same may be considered. 1

17、General i) Upon the owners written notification to ABS of a units lay-up, it will be noted in the units survey status and the Record will be updated to reflect the change in status. Surveys falling due during lay-up are then to be held in abeyance until the unit reactivates, at which time they are t

18、o be brought up to date. ii) The Reactivation Survey requirements for the unit are subject to special considerations based on the survey status at the time of the commencement of lay-up, the length of the lay-up period, and the conditions under which the unit has been maintained during that period.

19、iii) Where initial lay-up preparations and procedures are reviewed and surveyed by ABS, and also verified annually by survey, consideration may be given to deducting part or all of the time in lay-up from the progression of survey intervals, or to modifying the requirements for up-dating surveys at

20、time of reactivation. iv) There are three conditions for a Unit with a Laid-up “Life Cycle State” in the Record, Laid-up with no Record Comment; Laid-up Warm Stacked with the corresponding Record Comment and Laid-up Cold Stacked with the corresponding Record Comment. The Record Comments “Laid-up War

21、m Stacked” and “Laid-up Cold Stacked” can also have the Enhanced modifier, to have Record Comments showing “Enhanced Laid-up Warm Stacked” and “Enhanced Laid-up Cold Stacked”. These conditions are described in Subsection 1/3 below. 3 Definitions 3.1 Life Cycle Status “Laid-up” All laid-up units will

22、 have a Life Cycle Status of “Laid-up”. When a unit has a “Laid-up” Life Cycle Status in the Record without any additional Record Comment, this means that the unit is out of service for an undetermined length of time. The owners have informed ABS that the unit is laid up, but no procedures for lay-u

23、p have been reviewed by ABS. While in laid up status, class surveys are held in abeyance and statutory surveys are maintained when required by the flag Administration. Prior to returning to service a Reactivation Survey in accordance with Section 4 of this Guide, including all due and overdue class

24、and statutory surveys is to be carried out. An initial layup survey and annual surveys are not required for this Life Cycle Status and no attendant Record Comment. Units with lay-up procedures, initial lay-ups surveys and periodic examinations verified by ABS will have additional Record Comments des

25、cribing the type of lay-up as listed below. 3.3 Record Comment “Laid-up Warm Stacked” When a unit has a “Laid-up Warm Stacked” Record Comment in the Record, this means the unit is not in operation, is positioned in a sheltered location and there is a crew onboard carrying out the maintenance and pre

26、servation activities described in the ABS agreed lay-up procedure. In this case, 1/1iii) is applicable. Class surveys are held in abeyance and statutory surveys are maintained when required by the flag Administration. However, annual lay-up surveys are required to be carried out. Prior to returning

27、to service, a reactivation survey taking into account the degree of maintenance conducted while laid-up, including all due and overdue statutory surveys is to be carried out. ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 1 Section 1 General 3.5 Record Comment “Laid-up

28、Cold Stacked” When a unit has a “Laid-up Cold Stacked” Record Comment in the Record, this means that the unit is not operating, is positioned in a sheltered location, is unmanned, and that the Lay-up procedures have been reviewed by ABS. In this case, 1/1iii) is applicable. All class and statutory s

29、urveys are held in abeyance. However, annual lay-up surveys are required to be carried out. Prior to returning to service, a reactivation survey taking into account the degree of maintenance conducted while laid-up, including all due and overdue statutory surveys, are to be carried out. 3.7 “Enhance

30、d” Record Comment The goal of having a unit enrolled in the Enhanced Lay-up program is to manage the lifecycle and asset value by minimizing risk exposure, along with reducing the time and cost for reactivation. In addition to the requirements of Laid-up Warm Stacked or Laid-up Cold Stacked, when a

31、unit has an “Enhanced Lay-up” Record Comment in the Record, this means that the unit has had its lay-up location and procedures reviewed and verified in accordance with Section 2 of this Guide. For this Record Comment, a review of the proposed lay-up procedure, including the location chosen, the moo

32、rings, a risk analysis of the location, and the capability of emergency response is required. The Record Comment will show in the Record as follows: Enhanced Laid-up Cold Stacked Enhanced Laid-up Warm Stacked 5 Lay-up Surveys When a unit is laid-up with a “Laid-up Warm Stacked”, “Laid-up Cold Stacke

33、d”, or “Enhanced” Record Comment in the Record, an Initial Lay-up Survey is required. After being laid up, the unit will also be subjected to periodic surveys. The scope of such surveys will consist of verification of all items on the ABS agreed lay-up procedure. In the case of “Cold Stacked” units,

34、 in addition to the verification detailed in Subsection 2/7 of this Guide, the equivalent to an Annual Hull Survey is to be carried out. In the case of “Warm Stacked” units, in addition to the verification listed in Subsection 2/7 of this Guide, the equivalent to an Annual Hull Survey and an Annual

35、Machinery Survey is to be carried out. Units with “Enhanced Lay-up” will have verification requirements in accordance with Subsection 3/3 of this Guide in addition to those in Subsection 2/7. 7 Maintenance of Record Comment When the unit has a Record Comment of “Laid-up Warm Stacked”, “Laid-up Cold

36、Stacked”, or “Enhanced”, consideration may be given to deducting part or all of the time in lay-up from the progression of survey intervals, or to modifying the requirements for updating surveys at the time of reactivation. The unit will not be eligible for deduction of any time in lay-up from the s

37、urvey cycle in any of the following circumstances: i) If the periodical surveys required for maintenance of the Record Comment are not carried out by their due dates and no extension has been granted ii) If recommendations issued by the Surveyor regarding degree of compliance with the lay-up procedu

38、re are not carried out by their due dates and no extension has been granted iii) If any damage, failure, or repair has not been completed as recommended 2 ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 Section 1 General 9 Lay-up Overview Record Comment None Laid-up Cold

39、 Stacked* Laid-up Warm Stacked* Enhanced Laid-up Cold Stacked Enhanced Laid-up Warm Stacked Owner sends notification to ABS that unit is Laid-up X X X X X Lay-up Procedure Reviewed X X X X Engineering Review of Mooring design * * X X Survey of Mooring * * X X Initial Lay-up Survey X X X X Annual Hul

40、l Survey equivalent X X X X Annual Machinery Survey Equivalent X X Underwater Examination of mooring system every 3 years * * X X Surveys held in abeyance X X X X X Deduction of time in lay-up X X X X Reactivation Survey X X X X X Reactivation Survey considers Lay-up Procedure X X X X Reactivation f

41、ollows submitted Reactivation Procedure X X Key: X Required * Can be conducted at Owners request ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 3 Section 2: Lay- up and Surveys of Laid- up Mobile Offshore Drilling Units SECTION 2 Lay-up and Surveys of Laid-up Mobile Off

42、shore Drilling Units (1 June 2017) This Section applies to units requesting a Record Comment of Laid-up Warm Stacked, Laid-up Cold Stacked, and units with the Enhanced modifier. 1 Lay-up Procedure Requirements (1 June 2017) Lay-up procedures submitted to ABS are to contain the following information

43、for each unit: i) General description of the lay-up plan a) Location of the unit while laid-up b) Description of the mooring c) Number of personnel expected to be on board d) Status of cranes during lay-up e) Description of any external verification such as security personnel or unit patrols ii) Lis

44、t of systems active while laid-up iii) List of systems partially active while laid-up iv) List of systems shut down and preserved while laid-up v) Procedures for preserving each system that is shut down vi) Procedures for tracking overdue maintenance or parts required for reactivation vii) Procedure

45、s for periodic maintenance of preservation while laid up viii) Procedures for backup and storage of software necessary for operation of the unit ix) Units with “Enhanced” Record Comment modifier also need to submit items listed in Section 3 3 Fire and Safety Requirements for all Laid-up Units (1 Jun

46、e 2017) i) All the units fire safety equipment including emergency fire pump are to be proved in good order immediately prior to lay-up and maintained ready for immediate use thereafter. ii) The units fire extinguishing piping is to be proven in good condition. If the piping is drained, drains are t

47、o be kept only sufficiently open to allow drainage of condensate. Alternatively, the fire main lines may be filled with inhibited fresh water, including anti-freeze if necessary, or left in service. The International Shore connection, where provided, is to be loosely installed and its location promi

48、nently marked. Fire line valve stems are to be freed up and lubricated. iii) All ventilators and air intake or exhaust openings for spaces not active are to be adequately covered. Supply and exhaust openings for necessary emergency diesel generator or fire pump engines are to be arranged for immedia

49、te or automatic opening. 4 ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 Section 2 Lay-up and Surveys of Laid-up Mobile Offshore Drilling Units iv) A source of power for providing emergency lighting, fire extinguishing water, and bilge pumping throughout the unit is to be immediately available. Where the emergency source of power is a portable diesel generator set mounted on deck, adequate arrangements are to be made to install and secure the equipment, including fire safety of the fuel and exhaust systems, fire extinguishing arrangements, weather

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1