1、 Notices and General Information RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Nor
2、thchase Drive Houston, TX 77060 USA Table of Contents part Notices and General Information CONTENTS Introduction . 1 TABLE 1 Applicable Editions of Booklets Comprising 2017 Rules 2 TABLE 2 Division and Numbering of Rules 2 Rule Change Notice (2017) . 3 TABLE 3 Summary of Changes from the 2016 Rules
3、3 ii ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 Notices and General Information Introduction 1. The year 2017 edition of the Rules for Building and Classing Mobile Offshore Drilling Units consists of the nine (9) booklets as shown in Table 1. The purpose of the generic t
4、itle ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1) is to reflect the expanded contents of PART 1, as a result of including consolidated requirements for “Classification” applicable to all types of offshore units, pipelines, risers, and other offshore structures, a
5、s specified in the Foreword to Part 1. With regard to Part 2, the purpose of the generic title ABS Rules for Materials and Welding is to emphasize the common applicability of the requirements to ABS-classed vessels, other marine structures and their associated machinery, and thereby make PART 2 more
6、 readily a common “PART” of various ABS Rules and Guides, as appropriate. 2. The numbering system applied in the Rules is shown in Table 2. 3. The primary changes from the 2016 edition of the Rules are identified and listed in Table 3. The effective date of the indicated Rule Changes is 1 January 20
7、17, unless specifically indicated otherwise. 4. The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following eff
8、ective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 For certain changes that have a major impact on shipyards, designers and vendors, ABS has instituted
9、 a two-year Rule cycle to give the industry more time to prepare for these changes. The text of these changes will appear in a box along with the effective date just under the existing Rule requirement. 5. Until the next edition of the Rules for Building and Classing Mobile Offshore Drilling Units i
10、s published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS website www. eagle.org only, and will be available free for downloading. It is not intended to publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or Guides. The consolida
11、ted edition of the Rules for Building and Classing Mobile Offshore Drilling Units, which includes Rule Change Notices and/or Corrigenda using different colors for easy recognition will be published on the ABS website only when RCN and/or Corrigenda are issued. 6. The listing of CLASSIFICATION SYMBOL
12、S AND NOTATIONS is available from the ABS website www.eagle.org for download. ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 1 Notices and General Information TABLE 1 Applicable Editions of Booklets Comprising 2017 Rules Notices and General Information 2017 Part 1: Rules for
13、 Conditions of Classification Offshore Units and Structures (1)2017 (2)Part 1: Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures) (1)2017 Part 2: Rules for Materials and Welding 2017 (2)Part 3: Hull Construction and Equipment 201
14、7 Part 4: Machinery and Systems 2017 Part 5: Fire and Safety Measures and Features 2017 Part 6: Rules for Equipment and Machinery Certification 2017 Part 7: Surveys 2017 Notes: 1 The requirements for conditions of classification are contained in the separate, generic ABS Rules for Conditions of Clas
15、sification Offshore Units and Structures (Part 1). Additional specific requirements are contained in Part 1 of these Rules. 2 The latest edition of these Rules is to be referred to. These Rules may be downloaded from the ABS website at www.eagle.org, Rules and Guides, Downloads or may be ordered sep
16、arately from the ABS Publications online catalog at www.eagle.org, Rules and Guides, Catalog. TABLE 2 Division and Numbering of Rules Division Number Part Part 1 Chapter Part 1, Chapter 1 Section Section 1-1-1 Subsection (see Note 1) 1-1-1/1 Paragraph (see Note 1) 1-1-1/1.1 Subparagraph 1-1-1/1.1.1
17、Item 1-1-1/1.1.1(a) Subitem 1-1-1/1.1.1(a)i) Appendix Appendix 1-1-A1 or Appendix 1-A1-1 Note: 1 An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having t
18、o renumber the existing text and associated cross-references, as applicable, within the Rules and associated process instructions, check sheets, etc. 2 ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 Notices and General Information Rule Change Notice (2017) TABLE 3 Summary of
19、 Changes from the 2016 Rules EFFECTIVE DATE 1 July 2016 shown as (1 July 2016) Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification Offshore Units and Structures 1-1-A2/5.5 Product Quality Assurance Certification (PQA) Tier 4 (IACS UR Z26 Alternative Certificatio
20、n Scheme) To incorporate IACS UR Z26, which replaces UR M5 refrigerating, stabilizing, ventilation and air conditioning machinery; and trunk to such spaces, provided they are not handling or using flammable liquids) are not considered to be high fire risk areas. (Incorporates Notice No. 1) ABSRULES
21、FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 3 Notices and General Information Part/Para. No. Title/Subject Status/Remarks 4-3-5/1.1.3(d) Creepage Distances To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with resp
22、ect to testing. (Incorporates Notice No. 1) 4-3-5/1.1.3(e) (Renumbered) Creepage Distances To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.1.3(f) (Deleted) Non-standardize
23、d Parts To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.9.2(b) Warning Plate To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) a
24、nd IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.9.3(h) Test after Installation To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.13.4 Acce
25、ssibility To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) PART 6 Material, Marine Equipment and Machinery Certification 6-1-7/15.3.2(d) Shutters To align the requirements with the
26、 updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 6-1-7/15.3.2(f) Arc Flash and Associated Installation Requirements To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and I
27、EC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 6-1-7/15.3.3(a) Application To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) EFFECTIVE DATE 1 January 2017 sh
28、own as (2017) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks PART 3 Hull Construction and Equipment 3-1-4/5.7.2 Note 5 (New) To specify conditions for material substitution. 3-1-A2/3 Equations for Water Velocity To correct the
29、formula. 3-1-A2/7 Equation for Dynamic Pressure To align the figure with the equations in 3-1-A2/5. 3-2-3/7.1.2 Leg Scantlings To make reference to the ABS Guidance Notes on Dynamic Analysis Procedure for Self-Elevating Units, which provides guidance on the evaluate the dynamic response of SEUs. 3-2
30、-3/15.3 Design Head To define the design head for side and end bulkhead plating and stiffeners of deckhouses on the deck above the freeboard deck. 3-2-4/3.9.1 Permissible Load To align the requirements with 3-2-8/3.1 of the ABS Steel Vessel Rules. 3-2-4/3.9.4 Pillars under the Tops of Tanks To align
31、 the requirements with 3-2-8/3.7 of the ABS Steel Vessel Rules. 3-2-4/7.1 General To specify the required supports for deckhouses subject to differential deflections of the global hull structure. 3-3-A2/Table 1 Acceptable Tolerances To clearly indicate the meaning “slash /” in accordance with ABS in
32、ternal process instructions. 4 ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 Notices and General Information Part/Para. No. Title/Subject Status/Remarks 3-4-1/Table 2 Equipment for Self-propelled Ocean-going Units To modify the criteria for using chain of material grade sup
33、erior to Grade 3 according to ABS Guide for the Certification of Offshore Mooring Chain 2009. PART 4 Machinery and Systems 4-2-2/27.1 Ventilating Systems To clarify that other equivalent means may to be considered acceptable. 4-2-3/1.9.5(b)ix) To provide requirements for side covers, in line with IA
34、CS UR P3 Rev 4. 4-2-4/5.3 Installation To clarify the definition of extra heavy flange joints, in line with 4-6-4/5.5.4(c) of the ABS Steel Vessel Rules. 4-2-4/11.3 Installation To clarify the definition of extra heavy flange joints, in line with 4-6-4/5.5.4(c) of the ABS Steel Vessel Rules. 4-2-6/1
35、.7.3 Low-oil-pressure Alarm To specify that main and auxiliary combustion engines, above 37 kW, must be fitted with an alarm device with audible and luminous signals for failure of the lubricating oil system, in line with IACS UR M2. 4-3-2/13.3 Navigation Light System To remove inconsistencies and a
36、lign the requirements with the Steel Vessel Rules. 4-3-2/17.1.2(b) To align the requirements with IACS UI SC35 and MSC.311(88). 4-3-2/17.1.2(c) To clarify that the power supply failure alarms of general emergency alarm system are to be provided in a normally manned control station. 4-3-3/1.7 Emergen
37、cy Shutdown Procedures To require additional submission requirements related the Emergency Shutdown systems. 4-3-4/5 Programmable Electronic System (PES) To define a system based on one or more programmable electronic devices as a Programmable Electronic System, in line with ISO 17894:2005/4.8. 4-3-
38、5/7.1 Emergency Shutdown Facilities To require that ESD Stations that can enable a total unit shutdown should not be located in locations which are unmanned under normal operations. To require submission of an ESD Operation Manual which defines the ESD levels and describes which ESD levels are avail
39、able at each ESD station. To require submission of a Cause and Effect Chart for gas detection and ESD activations. 4-3-6/6.11 Mud Laboratory To clarify that mud samples for analysis are not likely to create a hazardous atmosphere. PART 5 Fire and Safety Measures and Features 5-1-1/3.5 Details, Mater
40、ials and Methods of Construction To align the requirements with the current version of the International Code for the Application of Fire Test Procedures (FTP Code 2010). 5-1-1/3.7 Fire Integrity of Bulkheads and Decks To mitigate the effects of hydrocarbon fires and explosions, in line with USCG re
41、commendations. 5-1-1/Table 1 Fire Integrity of Bulkheads Separating Adjacent Spaces To mitigate the effects of hydrocarbon fires and explosions, in line with USCG recommendations. 5-1-1/3.9.2 Note 1 To clarify the Control Station Definition for MODU Structural Fire Protection. 5-1-1/3.17iii) To alig
42、n the requirements with the current version of the International Code for the Application of Fire Test Procedures (FTP Code 2010). 5-1-1/3.17iv) To align the requirements with the current version of the International Code for the Application of Fire Test Procedures (FTP Code 2010). 5-1-1/5.1.3 (New)
43、 To mitigate the effects of hydrocarbon fires and explosions, in line with USCG recommendations. 5-1-1/5.27iv) (New) To align the requirements with 7-2-4/1.1.3 of the ABS MODU Rules. 5-2-2/1.1.5(a) General To clarify the pump capacity requirement for each fire main pump utilized for the other fire p
44、rotection or fire-fighting purposes. ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 5 Notices and General Information Part/Para. No. Title/Subject Status/Remarks 5-2-3/1.3.1 Fixed Fire Extinguishing Systems on Drilling Area and Temporary Well Test Area To align the requireme
45、nts with IACS UR D11.3.2. To require wellheads with maximum shut-in tubing pressures exceeding 600 psi to be protected with a water spray system. 5-2-3/3.1.2 Design To align the requirements with FSS Code Chapter 5, adopted by Resolution MSC.206(81) and amended by Resolution MSC.339(91). 5-2-3/3.1.3
46、 Alarm To align the requirements with FSS Code Chapter 5, adopted by Resolution MSC.206(81) and amended by Resolution MSC.339(91). 5-2-3/7 Fixed Pressure Water Spraying and Automatic Sprinkler Systems To include automatic sprinkler systems. 5-2-3/8.7.3 Controls To align the requirements with FSS Cod
47、e Chapter 5, adopted by Resolution MSC.206(81) and amended by Resolution MSC.339(91). 5-2-3/9.3.2 Portable Extinguishers To specify that semi-portable fire extinguishers can be provided on the helicopter deck as portable extinguishers, in line with 9.16.4.1 of the 2009 IMO MODU Code. 5-2-4/3.1 Numbe
48、r To align the requirements with 9.13.1 of the IMO MODU Code. 5-2-4/3.17 (New) Fire-fighters Outfit To align the requirements with SOLAS II-2/Reg.10.4. 5-3-1/7 Emergency Control Stations To specify that the gas detectors are to have indicators at the emergency control station. PART 6 Material, Marin
49、e Equipment and Machinery Certification 6-1-2/9.3 Sliding Watertight Doors To align the requirements with the Steel Vessel Rules. 6-1-2/Table 1 (Deleted) Material Certification Details To correct Approval Tiers and references. 6-1-3/Table 1 Certification Details Prime Movers To clarify the table and correct Approval Tiers and references. 6-1-4/Table 1 Certification Details Propulsion and Maneuvering Systems To clarify the table and correct Approval Tiers and references. 6-1-5/Table 1 Certification Details Boilers, Pressure Vessels and Fired Equipment To clarify t