1、Guide to Quality Management Auditing in the Concrete IndustryReported by ACI Committee 121ACI 121.1R-16First PrintingNovember 2016ISBN: 978-1-945487-37-8Guide to Quality Management Auditing in the Concrete IndustryCopyright by the American Concrete Institute, Farmington Hills, MI. All rights reserve
2、d. This material may not be reproduced or copied, in whole or part, in any printed, mechanical, electronic, film, or other distribution and storage media, without the written consent of ACI.The technical committees responsible for ACI committee reports and standards strive to avoid ambiguities, omis
3、sions, and errors in these documents. In spite of these efforts, the users of ACI documents occasionally find information or requirements that may be subject to more than one interpretation or may be incomplete or incorrect. Users who have suggestions for the improvement of ACI documents are request
4、ed to contact ACI via the errata website at http:/concrete.org/Publications/DocumentErrata.aspx. Proper use of this document includes periodically checking for errata for the most up-to-date revisions.ACI committee documents are intended for the use of individuals who are competent to evaluate the s
5、ignificance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. Individuals who use this publication in any way assume all risk and accept total responsibility for the application and use of this information.All infor
6、mation in this publication is provided “as is” without warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose or non-infringement.ACI and its members disclaim liability for damages of any kind, includ
7、ing any special, indirect, incidental, or consequential damages, including without limitation, lost revenues or lost profits, which may result from the use of this publication.It is the responsibility of the user of this document to establish health and safety practices appropriate to the specific c
8、ircumstances involved with its use. ACI does not make any representations with regard to health and safety issues and the use of this document. The user must determine the applicability of all regulatory limitations before applying the document and must comply with all applicable laws and regulation
9、s, including but not limited to, United States Occupational Safety and Health Administration (OSHA) health and safety standards.Participation by governmental representatives in the work of the American Concrete Institute and in the development of Institute standards does not constitute governmental
10、endorsement of ACI or the standards that it develops.Order information: ACI documents are available in print, by download, on CD-ROM, through electronic subscription, or reprint and may be obtained by contacting ACI.Most ACI standards and committee reports are gathered together in the annually revis
11、ed ACI Manual of Concrete Practice (MCP).American Concrete Institute38800 Country Club DriveFarmington Hills, MI 48331Phone: +1.248.848.3700Fax: +1.248.848.3701www.concrete.orgACI Committee Reports, Guides, and Commentaries are intended for guidance in planning, designing, executing, and inspecting
12、construction. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. The American Concrete Institute disclaims any and a
13、ll responsibility for the stated principles. The Institute shall not be liable for any loss or damage arising therefrom.Reference to this document shall not be made in contract documents. If items found in this document are desired by the Architect/Engineer to be a part of the contract documents, th
14、ey shall be restated in mandatory language for incorporation by the Architect/Engineer.ACI 121.1R-16 was adopted and published November 2016.Copyright 2016, American Concrete InstituteAll rights reserved including rights of reproduction and use in any form or by any means, including the making of co
15、pies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reproduction or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors.1ACI 121.1R-16Guide to Quality
16、 Management Auditing in the Concrete IndustryReported by ACI Committee 121Thomas G. Tyler*, Chair Jon B. Ardahl, Vice Chair Michelle E. Walters*, SecretaryGodwin Q. AmekuediMihaela Birley*Casimir J. BognackiPaul D. BrooksMartin BruggerMartin J. FraduaThomas M. GreenePaul HedliStephen MarcheseAnand S
17、. MehtaOon-Soo OoiMichael J. OsburnJerry ParnesJohan C. F. SchorEugene TakhtovichJames R. Turnham*Woodward L. Vogt*Subcommittee members who prepared this report.Consulting MembersStefanos J. EapenAlejandro GrafMorris HuffmanLawrence G. MrazekGajanan M. Sabnis Paul Zoltanetzky Jr.This guide provides
18、the background and methods for conducting an audit of an organizations quality management system. Such an audit can assess the organizations commitment to quality manage-ment and conformance to standards, codes, and contract require-ments. Audits can also identify portions of the quality management
19、system that need correction or improvement.Keywords: audit; nonconformance; opportunity for improvement; process audit; quality management system; quality manual.CONTENTSCHAPTER 1INTRODUCTION AND SCOPE, p. 31.1Introduction, p. 31.2Scope, p. 3CHAPTER 2DEFINITIONS, p. 3CHAPTER 3PRINCIPLES OF AUDITING,
20、 p. 5CHAPTER 4COMMONLY EMPLOYED QUALITY MANAGEMENT SYSTEMS, p. 54.1Simple, self-invented systems, p. 54.2Contractually-based systems, p. 54.3Systems modeled after ISO formats, current and noncurrent, p. 54.4Other systems that may be encountered, p. 6CHAPTER 5AUDIT PROGRAM CHARACTERISTICS, p. 75.1Bas
21、is for audit: applicable to all quality management systems, p. 75.2Creating an environment for successful audit program, p. 85.3Audit objectives: compliance, conformance, and improvement, p. 8CHAPTER 6PERFORMING AN AUDIT, p. 96.1Notification and scheduling, p. 9American Concrete Institute Copyrighte
22、d Material www.concrete.org2 GUIDE TO QUALITY MANAGEMENT AUDITING IN THE CONCRETE INDUSTRY (ACI 121.1R-16)6.2Audit team selection, p. 96.3Document collection and review, p. 96.4Audit plan preparation, p. 96.5Preparation of checklists and supporting documents, p. 106.6Conducting the audit, p. 106.7Au
23、dit report preparation, p. 116.8Audit procedure templates and forms, p. 11CHAPTER 7QUALITY MANAGEMENT COMMON ELEMENTS AND PROCESSES, p. 117.1Quality management system, p. 127.2Management responsibility: leadership, p. 127.3Design control, p. 137.4Document and data control, p. 147.5Quality records, p
24、. 147.6Purchasing/management of subs and suppliers, p. 157.7Process control, p. 167.8Procedures, p. 167.9Inspection and testing, p. 177.10Control of inspection, measuring, and testing equipment, p. 187.11Inventory control, p. 187.12Human resources/training, p. 197.13Control of nonconforming product,
25、 p. 217.14Corrective and preventive action, p. 217.15Internal audit/continual improvement, p. 217.16Statistical analysis, p. 21CHAPTER 8AUDIT OF CONCRETE DESIGN PROCESSES, p. 228.1Introduction and overview, p. 228.2Categorization of design projects, p. 238.3Design development, p. 238.4Deliverables,
26、p. 248.5Construction support, p. 288.6Quality assurance, p. 29CHAPTER 9AUDIT OF CONCRETE CONSTRUCTION PROCESSES, p. 299.1Quality management: General, p. 309.2Work methods, p. 309.3Concrete mixtures, p. 309.4Formwork and embedded items, p. 309.5Reinforcement, p. 319.6nullConcrete acceptance testing,
27、p. 319.7nullConcrete handling and placement, p. 319.8nullConcrete flatwork finishing, p. 319.9Curing, p. 339.10Recordkeeping, p. 339.11Statistical analysis, p. 33CHAPTER 10REFERENCES, p. 33Authored documents, p. 34APPENDIX ASAMPLE AUDIT PROCEDURE, TEMPLATES, AND FORMS, p. 35A.1QMP 010: Audit Procedu
28、re, p. 35A.2QMP 010A: Audit Schedule, p. 40A.3QMP 010B: Audit Agenda, p. 41A.4QMP 010C: Audit Checklist, p. 42A.5QMP 010D: Audit Report, p. 43A.6QMP 010E: OFI Report, p. 44A.7Nonconformance report, p. 45APPENDIX BCHAPTER 7 SAMPLE AUDIT QUESTIONS, p. 46B.1Sample audit questions for 7.1, Quality manag
29、ement system, p. 46B.2Sample audit questions for 7.2, Management responsibility, p. 46B.3Sample audit questions for 7.3, Design control, p. 47B.4Sample audit questions for 7.4, Document and data control, p. 47B.5Sample audit questions for 7.5, Quality records, p. 47B.6Sample audit questions for 7.6,
30、 Purchasing/management of subs and suppliers, p. 48B.7Sample audit questions for 7.7, Process control, p. 49B.8Sample audit questions for 7.8, Procedures, p. 50B.9Sample audit questions for 7.9, Inspection and testing, p. 50B.10Sample audit questions for 7.10, Control of inspection, measuring, and t
31、esting equipment, p. 50B.11Sample audit questions for 7.11, Inventory control, p. 51B.12Sample audit questions for 7.12, Human resources/training, p. 51B.13Sample audit questions for 7.13, Control of nonconforming product, p. 51B.14Sample audit questions for 7.14, Corrective and preventive action, p
32、. 52B.15Sample audit questions for 7.15, Internal audit/continual improvement, p. 52B.16Sample audit questions for 7.16, Statistical analysis, p. 52APPENDIX CCHAPTER 8 SAMPLE AUDIT QUESTIONS, p. 53C.1Sample audit questions for 8.3, Design development, p. 53C.2Sample audit questions for 8.3.2, Stages
33、 of design development, p. 53C.3Sample audit questions for 8.3.3, Types of reviews, p. 53C.4Sample audit questions for 8.4.2, Calculations, p. 54C.5Sample audit questions for 8.4.3, Drawings, p. 55C.6Sample audit questions for 8.4.4, Specifications, p. 56C.7Sample audit questions for 8.4.5, Delivera
34、bles turnover packages, p. 57C.8Sample audit questions for 8.5, Construction support, p. 57C.9Sample audit questions for 8.6, Quality assurance, p. 58American Concrete Institute Copyrighted Material www.concrete.orgGUIDE TO QUALITY MANAGEMENT AUDITING IN THE CONCRETE INDUSTRY (ACI 121.1R-16) 3APPEND
35、IX DCHAPTER 9 SAMPLE AUDIT QUESTIONS, p. 59D.1Sample audit questions for 9.1, Quality management, p. 59D.2Sample audit questions for 9.2, Work methods, p. 59D.3Sample audit questions for 9.3, Concrete mixtures, p. 60D.4Sample audit questions for 9.4, Formwork, p. 61D.5Sample audit questions for 9.5,
36、 Reinforcement, p. 62D.6Sample audit questions for 9.6, Concrete acceptance testing, p. 64D.7Sample audit questions for 9.7, Concrete handling and placement, p. 65D.8Sample audit questions for 9.8, Concrete flatwork finishing, p. 66D.9Sample audit questions for 9.9, Curing, p. 67D.10Sample audit que
37、stions for 9.10, Recordkeeping, p. 67D.11Sample audit questions for 9.11, Statistical analysis, p. 68CHAPTER 1INTRODUCTION AND SCOPE1.1IntroductionAn effective means of determining an organizations commitment to quality management is an audit, whether the organization is involved in design, construc
38、tion, inspection, testing, or other operations. Before procurement, an initial audit can evaluate operations of a supplier or subcontractor. During the course of a project, an audit can verify an organi-zations quality management, efficiency, and conformance to contract, codes, procedures, and stand
39、ards. By looking closely into a suppliers operations and asking key questions, a customer can be assured that what is presented or proposed in the bid, proposal, promotional literature, or quality plan is consistent with the suppliers capabilities and methods in their normal course of business.Furth
40、ermore, an organization can assess the effective-ness of its own quality management system and, thereby, its internal performance, efficiency, and conformance by conducting an internal audit. The results of such an audit can be the basis for determination of capabilities, self-declara-tion of confor
41、mance to a standard, and discovery of opportu-nities for improvement.This guide incorporates some of the principles contained in ISO 19011:2011, which can be used as reference should the auditor determine that ISO 19011 is applicable.The level of expectations can vary depending on the needs of the c
42、lient and what the client determines as adequate. A high order of performance can be determined by using the criteria established in ISO 9001:2008, in which case it is recommended that ACI 121R be used as a guide to determine the level of performance as it applies to the concrete industry.The questi
43、ons presented herein are intended to cover a broad range of issues, and some organizations may not be able to respond to them affirmatively. That does not neces-sarily indicate the organization is not a good choice for the task, as the questions themselves are not necessarily the criteria for accept
44、ance or rejection. In the absence of well-defined criteria, as would be required by contract, code, or self-proclaimed conformance, there is no right or wrong answer, only the facts, which are to be interpreted by the party requesting the audit. The quality management system capabilities encountered
45、 can range from the simple and basic to the robust. The level of quality management necessary to perform the task is determined by the party requesting the audit.1.2ScopeThis guide is intended for use in the concrete construc-tion industry. Recommendations and practices presented are intended to be
46、nonmandatory and only meant as guidance. This document is not intended to offer guidance in initiating a quality management system or to serve as a standard for third-party registration audits.This guide addresses several disciplines within the concrete construction industry with questions specific
47、to those disciplines. It begins with the principles and objectives of audits, followed by audit protocol, methods, techniques, and competency of auditors. Chapter 7 covers common processes of quality management typical to all industries with an emphasis on their application within the concrete const
48、ruction industry. Chapters 8 and 9 cover the processes for design and construction. Processes are presented with background information, their impacts on operations, common pitfalls, and sample questions to prompt audit investigations and discussions. For someone not familiar with quality management
49、 considerations for a certain disci-pline within the industry, this guide provides background and a starting point with some of the appropriate questions to ask.The application of this guide is suited for assembling a list of good practices to use in an audit procedure that is commensurate with the size and complexity of the organi-zations assigned or proposed task. Its application is also relevant to audits of large organizations with more complex systems and the re