ACI 351.5M-2015 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases.pdf

上传人:inwarn120 文档编号:401239 上传时间:2018-10-28 格式:PDF 页数:12 大小:670.15KB
下载 相关 举报
ACI 351.5M-2015 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases.pdf_第1页
第1页 / 共12页
ACI 351.5M-2015 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases.pdf_第2页
第2页 / 共12页
ACI 351.5M-2015 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases.pdf_第3页
第3页 / 共12页
ACI 351.5M-2015 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases.pdf_第4页
第4页 / 共12页
ACI 351.5M-2015 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases.pdf_第5页
第5页 / 共12页
亲,该文档总共12页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Specification for Installation of Epoxy Grout between Foundations and Equipment BasesReported by ACI Committee 351ACI 351.5M-15An ACI StandardFirst PrintingSeptember 2015ISBN: 978-1-942727-34-7Specification for Installation of Epoxy Grout between Foundations and Equipment BasesCopyright by the Ameri

2、can Concrete Institute, Farmington Hills, MI. All rights reserved. This material may not be reproduced or copied, in whole or part, in any printed, mechanical, electronic, film, or other distribution and storage media, without the written consent of ACI.The technical committees responsible for ACI c

3、ommittee reports and standards strive to avoid ambiguities, omissions, and errors in these documents. In spite of these efforts, the users of ACI documents occasionally find information or requirements that may be subject to more than one interpretation or may be incomplete or incorrect. Users who h

4、ave suggestions for the improvement of ACI documents are requested to contact ACI via the errata website at http:/concrete.org/Publications/DocumentErrata.aspx. Proper use of this document includes periodically checking for errata for the most up-to-date revisions.ACI committee documents are intende

5、d for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. Individuals who use this publication in any way assume all risk and accept total responsi

6、bility for the application and use of this information.All information in this publication is provided “as is” without warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose or non-infringement.ACI an

7、d its members disclaim liability for damages of any kind, including any special, indirect, incidental, or consequential damages, including without limitation, lost revenues or lost profits, which may result from the use of this publication.It is the responsibility of the user of this document to est

8、ablish health and safety practices appropriate to the specific circumstances involved with its use. ACI does not make any representations with regard to health and safety issues and the use of this document. The user must determine the applicability of all regulatory limitations before applying the

9、document and must comply with all applicable laws and regulations, including but not limited to, United States Occupational Safety and Health Administration (OSHA) health and safety standards.Participation by governmental representatives in the work of the American Concrete Institute and in the deve

10、lopment of Institute standards does not constitute governmental endorsement of ACI or the standards that it develops.Order information: ACI documents are available in print, by download, on CD-ROM, through electronic subscription, or reprint and may be obtained by contacting ACI.Most ACI standards a

11、nd committee reports are gathered together in the annually revised ACI Manual of Concrete Practice (MCP).American Concrete Institute38800 Country Club DriveFarmington Hills, MI 48331Phone: +1.248.848.3700Fax: +1.248.848.3701www.concrete.orgACI 351.5M-15 was adopted January 20, 2015 and published Aug

12、ust 2015.Copyright 2015, American Concrete InstituteAll rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reprod

13、uc-tion or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors.This specification covers minimum requirements for epoxy grouting between foundations and equipment bases. Included are require-ments for materials, placement, a

14、nd quality control.Keywords: epoxy grout; foundations; grout.CONTENTS(mandatory portion follows)PART 1GENERAL, p. 11.1Scope, p. 11.2Interpretation, p. 21.3Definitions, p. 21.4Reference standards, p. 21.5Submittals, p. 21.6Delivery, storage, and handling, p. 21.7Quality assurance and control, p. 21.8

15、Acceptance of work, p. 3PART 2PRODUCTS, p. 42.1Materials, p. 42.2Accessories, p. 4PART 3EXECUTION, p. 43.1Preparation, p. 43.2Installation, p. 53.3Testing and inspection, p. 53.4Repair, p. 53.5Cleaning, p. 5(nonmandatory portion follows) NOTES TO SPECIFIER, p. 6General notes, p. 6Foreword to checkli

16、sts, p. 6MANDATORY REQUIREMENTS CHECKLIST, p. 7(mandatory portion follows)PART 1GENERAL1.1Scope1.1.1 This specification covers requirements for installa-tion of epoxy grout between foundations and bases of equip-ment and machinery. Included are requirements for mate-rials, placement, and quality con

17、trol.1.1.2 This specification supplements the Contract Docu-ments and provides requirements for the Contractor.1.1.3 This specification governs for construction within its scope, except the Contract Documents govern if there is a conflict.1.1.4 This specification governs if there is a conflict with

18、referenced material and testing standards.ACI 351.5M-15Specification for Installation of Epoxy Grout between Foundations and Equipment BasesAn ACI StandardReported by ACI Committee 351David Kerins,*Chair Mukti L. Das, SecretaryOmesh B. AbhatRichard P. BohanWilliam L. BoundsWilliam D. BrantMichael M.

19、 ChehabShu-Jin FangFred R. GoodwinShraddhakar HarshErick N. LarsonRobert R. McGlohnCarl A. NelsonRichard OMalleyMichael A. PaipalIra W. PearceCharlie L. RowanWilliam E. Rushing Jr.Yasser SalemLarry W. SchulzePhilip A. SmithWidiantoF. Alan WileySheng-Chi WuConsulting MembersNavin N. PandyaShamsher Pr

20、akashRobert L. Rowan, Jr._*Chair of Task Group 351.TG2 that prepared this report.Members of Task Group 351.TG2 that prepared this report.(mandatory portion follows)11.1.5 The Contractor is permitted to submit written alter-natives to any provision in this specification.1.1.6 Do not use this specific

21、ation in conjunction with ACI 301M, ACI 350.5M, or ACI 530/530.1 unless Contract Documents state that this specification governs for Work covered by 1.1.1.1.1.7 Ignore provisions of this specification that are not applicable to the Work.1.1.8 Values in this specification are stated in SI units. A co

22、mpanion specification in inch-pound units is also available.1.1.9 The Notes to Specifier are not part of this specification.1.2InterpretationUnless otherwise explicitly stated, this specification shall be interpreted using the following principles:(a) Interpret this specification consistent with the

23、 plain meaning of the words and terms used.(b) Definitions provided in this specification govern over the definitions of the same or similar words or terms found elsewhere.(c) Whenever possible, interpret this specification so that its provisions are in harmony and do not conflict.(d) Headings are p

24、art of this specification and are intended to identify the scope of the provisions or sections that follow. If there is a difference in meaning or implication between the text of a provision and a heading, the meaning of the text governs.(e) Where a provision of this specification involves two or mo

25、re items, conditions, requirements, or events connected by the conjunctions “and” or “or,” interpret the conjunction as follows:i) “and” indicates that all of the connected items, condi-tions, requirements, or events apply.ii) “or” indicates that the connected items, conditions, requirements, or eve

26、nts apply singularly.(f) The use of the verbs “may” or “will” indicates that the specification provision is for information to the contractor.1.3Definitions1.3.1 The following definitions govern in this specifica-tion. For definitions not provided herein, refer to “ACI Concrete Terminology.”accepted

27、determined to be satisfactory by Architect/Engineer.Architect/Engineerthe architect, engineer, architec-tural firm, or engineering firm developing Contract Docu-ments, administering the Work under Contract Documents, or both.headboxdevice for controlling the flow of grout into the formwork.submittal

28、document or material provided to Architect/Engineer for review and acceptance.testing agencythe person, firm, or entity under contract for providing testing services.unrestrained areas of groutareas of grout that are not under or within 100 mm of the baseplate.Workthe entire construction or separate

29、ly identifi-able parts thereof required to be furnished under Contract Documents.1.4Reference standardsStandards of ACI and ASTM International cited in this Specification are listed by name and designation, including year.1.4.1 American Concrete InstituteACI 117M-10Specification for Tolerances for C

30、oncrete Construction and Materials and CommentaryACI 301M-10Specifications for Structural Concrete1.4.2 ASTM InternationalASTM C579-01(2012)Standard Test Methods for Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer ConcretesASTM C1107-14Standard Specific

31、ation for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)1.5Submittals1.5.1 GeneralContractor shall provide to Architect/Engineer submittals required by this Specification in accor-dance with Contract Documents.1.5.2 Contractors quality controlSubmit a quality control plan showing means and methods

32、 to control the purchase, use, and placement of epoxy grout. Provide infor-mation related to quality control in accordance with 1.7.5.1.5.3 Contractors testing agencyIf Contractor is nomi-nating a testing agency, submit data on qualifications of proposed testing agency for acceptance.1.5.4 Quality c

33、ontrol procedures1.5.4.1 Submit the following to Architect/Engineer before the start of Work:a) Experience record of supervisory personnelb) List of equipment and proceduresc) Detailed procedures for grouting.1.5.4.2 Submit the following to Architect/Engineer during construction:a) Notification to O

34、wners Representative in time to permit in-place inspection of foundation and formwork prior to placement of groutb) Test resultsc) Record set markup of drawings1.5.4.3 Submit formwork and formwork accessories as specified in Contract Documents.1.6Delivery, storage, and handlingDeliver, store, and ha

35、ndle grout per manufacturers instructions and material safety data sheets (MSDS).1.7Quality assurance and control1.7.1 GeneralGrout materials and operations may be tested and inspected by Owner as Work progresses. Failure to detect defective Work or material will not prevent rejec-tion if a defect i

36、s discovered later nor shall it obligate Archi-tect/Engineer for final acceptance.American Concrete Institute Copyrighted Material www.concrete.org2 INSTALLATION OF EPOXY GROUT BETWEEN FOUNDATIONS AND EQUIPMENT BASES (ACI 351.5M-15)1.7.2 Testing agency acceptanceTesting agencies shall be accepted by

37、 Architect/Engineer before performing any Work.1.7.3 Grout testField tests of grout required in 1.7.4 and 1.7.5 shall be performed by personnel trained in testing epoxy grouts.1.7.4 Duties and responsibilities of ContractorUnless otherwise specified in Contract Documents, Contractor shall assume the

38、 following duties and responsibilities:a) Qualify proposed materials.b) Allow access to project site or to source of materials and assist Owners testing agency in obtaining and handling samples at project site or at source of materials.c) Advise Owners testing agency at least 24 hours in advance of

39、operations to allow for completion of quality tests and for assignment of personnel.d) Provide and maintain adequate facilities on project site for safe storage and initial curing of grout test specimens for the sole use of testing agency.1.7.5 Quality controlQuality control shall be performed to en

40、sure that:a) Specified epoxy grout is being used and has not exceeded its shelf lifeb) Foundation and baseplate have been properly preparedc) Formwork is fit for purposesd) Required tests are performed at specified frequencye) Correct placing methods are usedf) Curing temperature is maintained for r

41、equired timeg) Shims, wedges, or leveling devices are removed, if specified to be removed elsewhere in Contract Documents, after material has reached full cureh) Temperature of baseplate, grouting materials, founda-tion, and environment are within specified parametersi) Moisture condition of grout a

42、ggregate and foundations are within specified parameters.1.8Acceptance of work1.8.1 GeneralCompleted grout shall conform to appli-cable requirements of this specification and Contract Documents.1.8.1.1 Grout that fails to meet one or more requirements of Contract Documents but subsequently is repair

43、ed to bring the grout into compliance will be accepted.1.8.1.2 Grout that fails to meet one or more requirements of Contract Documents and cannot be brought into compli-ance is subject to rejection.1.8.1.3 Repair rejected grout by removing and replacing or by additional construction to strengthen or

44、 otherwise satisfy project requirement as directed by Architect/Engineer. To bring rejected Work into compliance, use repair methods that meet applicable requirements for function, durability, dimensional tolerances, and appearance as determined by Architect/Engineer.1.8.1.4 Submit proposed repair m

45、ethods, materials, and modifications needed to repair the grout to meet the require-ments of Contract Documents.1.8.1.5 Contractor shall be responsible to bring grout into compliance with requirements of Contract Documents.1.8.2 Dimensional tolerances1.8.2.1 Unless otherwise specified, construction

46、toler-ances shall conform to ACI 117M.1.8.2.2 Formed surfaces resulting in grout with dimen-sions smaller than permitted by the tolerances of ACI 117M may be considered deficient in strength and subject to the provisions of 1.8.4.1.8.2.3 Formed surfaces resulting in grout with dimen-sions larger tha

47、n permitted by ACI 117M are subject to rejec-tion. Remove excess materials when required by Architect/Engineer.1.8.2.4 Inaccurately formed grout surfaces that exceed ACI 117M tolerances are subject to rejection.1.8.3 Appearance1.8.3.1 Grout surfaces not meeting the requirements of 3.2.7 or 3.2.12 sh

48、all be brought into compliance in accor-dance with 1.8.1.1.8.4 Strength1.8.4.1 Criteria for determining potential strength defi-ciencyStrength may be considered deficient and grout work is subject to rejection when the Work fails to comply with requirements that control the strength of the grout inc

49、luding, but not limited to, the conditions given in (a) through (f).a) Grout strength failing to comply with specified parametersb) Reinforcement size, quantity, grade, position, or arrangement at variance with the requirements of 3.1.5 or other Contract Documentsc) Grout that differs from the required dimensions or locationd) Curing not performed in accordance with Contract Documentse) Insufficient protection of grout from extreme tempera-ture and other adverse environmental conditions during early stages of hardening