1、 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS 2018 CORRIGENDA/EDITORIALS 1 March 2018 Page No. Paragraph Comments Part 1 Rules for Conditions of Classification Offshore Units and Structures Chapter 5 Classification Requirements for Floating Production Installations Section 2 System Classifi
2、cation, Symbols and Notations 78 1-5-2/5.13 Renumber 5.11.5 as 5.13.5. Part 3 Hull Construction and Equipment Chapter 2 Hull Structures and Arrangements Section 5 Surface-Type Drilling Units 96 3-2-5/5.1ii) Revise “Normal Drilling Condition” to read “Normal Operating Condition”. Part 7 Surveys Chapt
3、er 1 Surveys During Construction Section 8 Surveys at Builders Yard Fire and Safety 85 7-1-8/5.3 Renumber 5.3.14 through 5.3.20 as 5.3.13 through 5.3.19. Part 7 Surveys Chapter 2 Surveys After Construction Section 2 Survey Intervals 122 7-2-2/1.9.1 Reference “3/3.7.8 of the Offshore Installation Rul
4、es” to read “3-2-2/7.15 of the Offshore Installation Rules”. Part 7 Surveys Chapter 2 Surveys After Construction Section 6 Drydocking Surveys or Equivalent 165 7-2-6/3.9 Reference “3/3.7.8 of the Offshore Installation Rules” to read “3-2-2/7.15 of the Offshore Installation Rules”. ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2018 1