ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf

上传人:bowdiet140 文档编号:418498 上传时间:2018-11-06 格式:PDF 页数:3 大小:41.33KB
下载 相关 举报
ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf_第1页
第1页 / 共3页
ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf_第2页
第2页 / 共3页
ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018 CORRIGENDA/EDITORIALS 1 March 2018 Page No. Paragraph Comments Part 4 Vessel Systems and Machinery Chapter 1 General Section 1 Classification of Machinery 11 4-1-1/Table 3 For Item 21, Rule Reference to read “4-8-5/5.17.11”. Part 4 Vesse

2、l Systems and Machinery Chapter 6 Piping Systems Section 2 Metallic Piping 374 4-6-2/Table 8 For NPS of 5 in., outside diameter in inches to read “5.563”. Part 5 Specialized Services Chapter 1 Vessels Intended for Offshore Support Services Section 1 General 5 5-1-1/Table 1 Notation “Well Test Servic

3、e” to read “Well Test”. Part 5 Specialized Services Chapter 1 Vessels Intended for Offshore Support Services Section A1 Review of Temporary Industrial Equipment and Modules 16 5-1-A1/1 In first paragraph, “portable industrial module are installed” to read “portable industrial module is installed”. 1

4、6 5-1-A1/1.5 In first paragraph, “scantlings shall comply” to read “scantlings are to comply”. 16 5-1-A1/1.5 In second paragraph, “forces, than these loads” to read “forces, then these loads”. 17 5-1-A1/3 In last line, “IEC 60092-502, than the list” to read “IEC 60092-502, then the list”. 17 5-1-A1/

5、5.1 In first paragraph, “General Arrangement drawing must be submitted” to read “General Arrangement drawing is to be submitted”. 17 5-1-A1/5.1 In first paragraph “shall be” to read “is to be”. (4 places) 17 5-1-A1/5.1 In first paragraph “If the location of equipment changes than” to read “If the lo

6、cation of equipment changes, then”. 17 5-1-A1/5.1 In first paragraph “equipment has been removed notice” to read “equipment has been removed, a notice”. 17 5-1-A1/5.1 In second paragraph “and to be surveyed” to read “and are to be surveyed”. 17 5-1-A1/5.3 In first paragraph “securing devices must be

7、 reviewed” to read “securing devices are to be reviewed”. 17 5-1-A1/5.3 In first paragraph “securing details shall be shown” to read “securing details are to be shown”. 17 5-1-A1/5.3 In first paragraph “Cargo Securing Manual than” to read “Cargo Securing Manual, then”. 17 5-1-A1/5.3.1 In second para

8、graph “effectiveness of the clips shall be reduced” to read “effectiveness of the clips is to be reduced”. ABSRULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS .2018 1 Corrigenda/Editorials 1 March 2018 Page No. Paragraph Comments Part 5 Specialized Services Chapter 1 Vessels Intended for Off

9、shore Support Services Section A1 Review of Temporary Industrial Equipment and Modules 17 5-1-A1/5.3.1 In third paragraph “means of securing than” to read “means of securing, then”. 17 5-1-A1/5.3.1 In third paragraph “shall be able to resist” to read “are to be able to resist”. 18 5-1-A1/5.3.2 In fi

10、rst paragraph “pieces of lashing equipment being used shall comply” to read “pieces of lashing equipment being used are to comply”. 18 5-1-A1/5.3.2 In second paragraph “shall be able to resist” to read “are to be able to resist”. 19 5-1-A1/5.3.3 In first paragraph “parts shall be provided” to read “

11、parts are to be provided”. 19 5-1-A1/5.3.3 In first paragraph “manufacturer and model shall by noted” to read “manufacturer and model are to be noted”. 19 5-1-A1/5.5 In first paragraph “static weight shall be provided” to read “static weight is to be provided”. 19 5-1-A1/5.5 In third paragraph “load

12、s shall incorporate accelerations” to read “loads are to incorporate accelerations”. 19 5-1-A1/5.7 In first paragraph “contact area to the deck shall be specified” to read “contact area to the deck is to be specified”. 19 5-1-A1/5.7 In third paragraph “part of the design than” to read “part of the d

13、esign, then”. 19 5-1-A1/5.7 In third paragraph “shall be” to read “are to be”. (2 places) 19 5-1-A1/5.9 In first paragraph “Dynamic loads shall be provided” to read “Dynamic loads are to be provided”. 19 5-1-A1/5.9 In second paragraph “design loads than this information shall be furnished” to read “

14、design loads, then this information is to be furnished”. 19 5-1-A1/5.9 In second paragraph “design loads shall include” to read “design loads are to include”. 19 5-1-A1/5.9 In second paragraph “Therefore these loads must be applied” to read “Therefore, these loads are to be applied”. 19 5-1-A1/5.9 I

15、n second paragraph “design loads it is the discretion of ABS” to read “design loads, it is at the discretion of ABS”. 19 5-1-A1/7.1 In first paragraph “ventilation openings and their proximity to hazards and cargoes shall comply with the Section 5-2-3” to read “ventilation openings and their proximi

16、ty to hazards and cargoes are to comply with Section 5-2-3”. 19 5-1-A1/7.1 In first paragraph “than a revised ventilation arrangement shall be submitted” to read “then a revised ventilation arrangement is to be submitted”. 20 5-1-A1/7.3 In first paragraph “hatches and other tonnage openings shall co

17、mply with the Section 5-2-3” to read “hatches and other tonnage openings are to comply with Section 5-2-3”. 20 5-1-A1/7.3 In first paragraph “than the appropriate revised plans arrangement shall be submitted” to read “then the appropriate revised plans arrangement is to be submitted”. 20 5-1-A1/7.5

18、In first paragraph “vessels Fire Control Plan” to read “vessels Fire Control Plan”. 20 5-1-A1/7.5 In first paragraph “industrial equipment, shall be submitted” to read “industrial equipment is to be submitted”. 2 ABSRULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS .2018 Corrigenda/Editorials

19、 1 March 2018 Page No. Paragraph Comments Part 5 Specialized Services Chapter 1 Vessels Intended for Offshore Support Services Section A1 Review of Temporary Industrial Equipment and Modules 20 5-1-A1/7.5 In second paragraph “other means of life saving shall be in accordance” to read “other means of

20、 life saving are to be in accordance”. 20 5-1-A1/9.1 Revise “systems than drawings showing the proposed modifications shall be provided” to read “systems, then drawings showing the proposed modifications are to be provided”. 20 5-1-A1/11.1.1 Revise “than a hazardous zone plan shall be submitted” to

21、read “then a hazardous zone plan is to be submitted”. 20 5-1-A1/13 In first paragraph “than the appropriate Notation” to read “then the appropriate Notation”. 21 5-1-A1/13.1 In third paragraph “contact areas than ABS may request” to read “contact areas, then ABS may request”. 21 5-1-A1/13.1 In fourth paragraph “dynamic loading than it is” to read “dynamic loading, then it is”. ABSRULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS .2018 3

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1