1、ASD STANDARD NORME ASD ASD NORM prEN 4800-006 Edition P 2 September 2009 PUBLISHED BY THE AEROSPACE AND DEFENCE INDUSTRIES ASSOCIATION OF EUROPE - STANDARDIZATIONAvenue de Tervuren, 270 - B-1150 Brussels - Tel. + 32 2 775 8126 - Fax. + 32 2 775 8131 - www.asd-stan.orgICS: Supersedes edition P 1 of S
2、eptember 2002 Descriptors: ENGLISH VERSION Aerospace series Titanium and titanium alloys Technical specification Part 006: Pre-production and production forgings Srie arospatiale Titane et alliages de titane Spcification technique Partie 006 : Pices types et pices de srie, forges et matrices Luft- u
3、nd Raumfahrt Titan und Titanlegierungen Kneterzeugnisse Technische Lieferbedingungen Teil 006: Ausfallmuster- und Serienschmiedestcke This “Aerospace Series“ Prestandard has been drawn up under the responsibility of ASD-STAN (The AeroSpace and Defence Industries Association of Europe - Standardizati
4、on). It is published for the needs of the European Aerospace Industry. It has been technically approved by the experts of the concerned Domain following member comments. Subsequent to the publication of this Prestandard, the technical content shall not be changed to an extent that interchangeability
5、 is affected, physically or functionally, without re-identification of the standard. After examination and review by users and formal agreement of ASD-STAN, it will be submitted as a draft European Standard (prEN) to CEN (European Committee for Standardization) for formal vote and transformation to
6、full European Standard (EN). The CEN national members have then to implement the EN at national level by giving the EN the status of a national standard and by withdrawing any national standards conflicting with the EN. Edition approved for publication 30 September 2009 Comments should be sent withi
7、n six months after the date of publication to ASD-STAN Metallic Material Domain Copyright 2009 by ASD-STAN Copyright ASD-STAN Provided by IHS under license with AECMA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-prEN 4800-006:2009 (E) 2 Contents Page Foreword2 I
8、ntroduction .3 1 Scope 3 2 Normative references 3 3 Terms and definitions .4 4 Wording of order5 5 Health and safety .5 6 Technical requirements 5 Foreword This standard was reviewed by the Domain Technical Coordinator of ASD-STANs Metallic Material Domain. After inquiries and votes carried out in a
9、ccordance with the rules of ASD-STAN defined in ASD-STANs General Process Manual, this standard has received approval for Publication. Copyright ASD-STAN Provided by IHS under license with AECMA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-prEN 4800-006:2009 (E)
10、 3 Introduction This standard is part of the series of EN metallic material standards for aerospace applications. The general organization of this series is described in EN 4258. 1 Scope This standard defines the requirements for the ordering, manufacture, testing, inspection and delivery of titaniu
11、m and titanium alloy pre-production and production forgings. It shall be applied when referred to and in conjunction with the EN material standard unless otherwise specified on the drawing, order or inspection schedule. 2 Normative references The following referenced documents are indispensable for
12、the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 2002-001, Aerospace series Metallic materials Test methods Part 001: Tensile testing at ambient tempera
13、ture EN 2002-002, Aerospace series Metallic materials Test methods Part 002: Tensile testing at elevated temperature EN 2002-005, Aerospace series Test methods for metallic materials Part 005: Uninterrupted creep and stress-rupture testing EN 2002-8, Aerospace series Metallic materials Test methods
14、Part 8: Micrographic determination of grain size 1)EN 2002-16, Aerospace series Metallic materials Test methods Part 16: Non-destructive testing Penetrant testing EN 2003-009, Aerospace series Test methods Titanium and titanium alloys Part 009: Determination of surface contamination EN 2032-1, Aeros
15、pace series Metallic materials Part 1: Conventional designation EN 2032-2, Aerospace series Metallic materials Part 2: Coding of metallurgical condition in delivery condition EN 2078, Aerospace series Metallic materials Manufacturing schedule, inspection schedule, inspection and test report Definiti
16、on, general principles, preparation and approval EN 2954-002, Aerospace series Macrostructure of titanium and titanium alloy wrought products Part 002: Macrostructure of bar, section, forging stock and forgings EN 3114-001, Aerospace series Test method Microstructure of ( + ) titanium alloy wrought
17、products Part 001: General requirements 1) Published as ASD Prestandard at the date of publication of this standard. Copyright ASD-STAN Provided by IHS under license with AECMA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-prEN 4800-006:2009 (E) 4 EN 3114-002, Ae
18、rospace series Test method Microstructure of ( + ) titanium alloy wrought products Part 002: Microstructure of bars, sections, forging stock and forgings EN 3683, Aerospace series Test method Titanium alloy wrought products Determination of primary content Point count method and line intercept metho
19、d EN 3874, Aerospace series Test methods for metallic materials Constant amplitude force-controlled low cycle fatigue testing 1)EN 3976, Aerospace series Titanium and titanium alloys Test method Chemical analysis for the determination of hydrogen content EN 3987, Aerospace series Test method for met
20、allic materials Constant amplitude force-controlled high cycle fatigue testing1)EN 3988, Aerospace series Test methods for metallic materials Constant amplitude strain-controlled low cycle fatigue testing1) EN 4050-1, Aerospace series Test method for metallic materials Ultrasonic inspection of bars,
21、 plates, forging stock and forgings Part 1: General requirements1)EN 4050-4, Aerospace series Test method for metallic materials Ultrasonic inspection of bars, plates, forging stock and forgings Part 4: Acceptance criteria1) EN 4258, Aerospace series Metallic materials General organization of standa
22、rdization Links between types of EN standards and their use EN 4259, Aerospace series Metallic materials Definition of general terms1)EN 4800-005, Aerospace series Titanium and titanium alloys Technical specification Par 005: Forging stock 1)EN 9100, Aerospace series Quality management systems Requi
23、rements (based on ISO 9001:2000) and Quality systems Model for quality assurance in design, development, production, installation and servicing (based on ISO 9001:1994) EN 9133, Aerospace series Quality management systems Qualification Procedure for aerospace standard parts TR 2410, Aerospace series
24、 Metallic materials Relationship between dimensional standards and material standards 2)AMS 2750, Pyrometry 3)3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 4259 apply. 2) Published as ASD Technical Report at the date of publication of this standard.
25、 3) Published by: American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA, 19428-2959 USA. Copyright ASD-STAN Provided by IHS under license with AECMA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-prEN 4800-006
26、:2009 (E) 5 4 Wording of order The order shall clearly indicate: quantities to be supplied; dates of delivery; material standard number; part number delivery condition and metallurgical code of products; dimensions and tolerances or reference to an appropriate dimensional standard; product designati
27、on, when required; forwarding address; nature and type of packing, if required; definition and frequency of any special tests and their retest procedures, if required. 5 Health and safety Products in the delivery condition shall fulfil the health and safety laws of the area of the country when and w
28、here it is to be delivered. A product safety data sheet shall be available. 6 Technical requirements 6.1 General The product shall satisfy the requirements of the order, drawing inspection schedule or material standard: see Table 1, line 5. The order, drawing or inspection schedule shall specify the
29、 tests to be performed upon (i) pre-forgings for qualification and/or requalification (ii) serial production forgings for process control testing (Procedure X: see 6.5) and (iii) batch release when cut-up testing or forgings is required. Unless otherwise specified on the order, drawing or inspection
30、 schedule, acceptance criteria for the tests are stated in the material standard, the requirements for each line of which are detailed in Tables 2 and 3 of this technical specification. Table 2 related to lines 1 to 29 (inclusive) of the material standard and Table 3 relates to lines 30 onwards in w
31、hich the sub-line format is also used. If a particular test is needed but not shown in a specific line in Tables 2 and 3, the requirement shall be specified on the order, drawing, inspection schedule or material standard. 6.2 Qualification requirements See line 100 in Table 3 of this technical speci
32、fication. Qualification shall normally comprise assessment of pre-production forgings. See Table 2, No 4.2. Copyright ASD-STAN Provided by IHS under license with AECMA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-prEN 4800-006:2009 (E) 6 6.3 Re-qualification req
33、uirements Re-qualification of serial production forgings may be required, at the purchasers discretion, in the following cases: modification of the drawing; use of forging stock from a different source; modifications to the forging stock form and/or manufacturer route; modifications to an existing d
34、ie; use of a new (replacement) die; modifications to the forging manufacturing route; use of a new forging manufacturer; when a significant time interval (usually several years) had elapsed between forging campaigns for a specific part number; when required by the purchaser for any other reason. Re-
35、qualification testing requirements, especially location of test pieces, shall be identical to those used for the initial qualification of the pre-production forgings unless otherwise specified on the order, drawing or inspection schedule. 6.4 Release requipements Release testing shall be the respons
36、ibility of the manufacturer. The sampling procedure for release testing shall be one of the following, as specified on the order, drawing or inspection schedule. Where no procedure is specified, procedure A shall be used. Procedure A: Separate forged test samples shall be produced from the same batc
37、h of forging stock as that used to make the serial production forgings. Procedure A may be used alone unless denoted AX on the drawing, order or inspection schedule in which case it shall be applied only in conjunction with procedure X (See 6.5). Procedure B: Separate forged heat treatment control t
38、est samples shall be prepared which conform to the same material standard as the production forgings, but may originate from a different batch of forging stock. Procedure B shall only be used when full heat treatment of the serial production forgings is carried out by the manufacturer and only in co
39、njunction with procedure X (See 6.5). Procedure C: Integral test samples shall be removed from each forgings. The order, drawing of inspection schedule shall specify how many test samples shall be tested per batch. Procedure C may be used alone unless denoted CX on the drawing, order or inspection s
40、chedule in which case it shall be applied only in conjunction with procedure X (See 6.5). Procedure D: Test samples shall be machined from forging(s) selected from each production batch and at locations specified on the order, drawing or inspection schedule. The purchaser reserves the right to perfo
41、rm any of the inspections and/or tests required by the material standard, drawing, order or inspection schedule. When required, the manufactured shall inform the purchaser of the planned dates for extraction of samples and release testing in order that these operations may be witnessed. Copyright AS
42、D-STAN Provided by IHS under license with AECMA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-prEN 4800-006:2009 (E) 7 6.5 Process control testing (Procedure X) Procedure X is process control procedure consisting of periodic “cut-up” testing to ensure that the se
43、rial production forgings continues to conform to the specified requirements. If procedure X is invoked by the order, drawing or inspection/manufacturing schedule and/or if procedures B, AX or CX are used for release tests (see 6.4), forgings shall be selected from series production at the frequency
44、stated therein. It is recommended that the maximum number of forgings manufactured between repeat “cut-up” testing conforming to procedure X shall be as stated in the following Table 1: Table 1 Mass of forging kg Number of forgings 1 2 000 1 25 As stated on the order, drawing, inspection schedule Th
45、e testing requirements, including the location, type and size of test pieces shall be identical to those used for qualification of the pre-production. 6.6 Retests Retests shall be required if the specified acceptance criteria are not fully met during qualification testing of pre-production forgings,
46、 process control testing (procedure X) or batch release testing. If the test product or test piece preparation is faulty, testing shall be re-applied at the original frequency after rectification of the original cause of failure. At least one of the retests shall be from forgings from which the unsa
47、tisfactory result was obtained (unless already rejected by the manufacturer after suitable identification of the cause of failure). It insufficient material remains, the purchaser shall advise as to how to proceed. If all retest results fulfil the specified acceptance criteria, the pre-production fo
48、rging qualification/process control test (procedure X) shall be deemed satisfactory or the batch shall be accepted, as appropriate. If one or more retest results fail to fulfil the specified acceptance criteria, the following actions shall be taken: a) For qualification testing of pre-production forgings, advice shall be sought from the purchaser as to whether the retest results are acceptable for that part of the forging. If so, this shall be denoted by a note on the drawing, together with values which are acceptabl