AHRI GUIDELINE X-2009 Induced Draft Furnace Heat Exchanger Inspection.pdf

上传人:unhappyhay135 文档编号:422625 上传时间:2018-11-06 格式:PDF 页数:8 大小:88.34KB
下载 相关 举报
AHRI GUIDELINE X-2009 Induced Draft Furnace Heat Exchanger Inspection.pdf_第1页
第1页 / 共8页
AHRI GUIDELINE X-2009 Induced Draft Furnace Heat Exchanger Inspection.pdf_第2页
第2页 / 共8页
AHRI GUIDELINE X-2009 Induced Draft Furnace Heat Exchanger Inspection.pdf_第3页
第3页 / 共8页
AHRI GUIDELINE X-2009 Induced Draft Furnace Heat Exchanger Inspection.pdf_第4页
第4页 / 共8页
AHRI GUIDELINE X-2009 Induced Draft Furnace Heat Exchanger Inspection.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 AHRI Guideline X2009 Guideline for Induced Draft Furnace Heat Exchanger Inspection Price $5.00 (M) $10.00 (NM) Copyright 2009, by Air-Conditioning, Heating, and Refrigeration Institute Printed in U.S.A. Registered United States Patent and Trademark Office IMPORTANT SAFETY DISCLAIMER AHRI does not c

2、ertify or guarantee the safety of any products, components or systems designed, tested, rated, installed or operated in accordance with this standard/guideline. It is strongly recommended that products be designed, constructed, assembled, installed and operated in accordance with nationally recogniz

3、ed safety standards and code requirements appropriate for products covered by this standard/guideline. AHRI uses its best efforts to develop standards/guidelines employing state-of-the-art and accepted industry practices. AHRI does not certify or guarantee that any tests conducted under its standard

4、s/guidelines will be non-hazardous or free from risk. FOREWORD Gas Furnaces are known for their safety, performance and longevity. This is largely due to their certification to nationally recognized safety standards and the building standards and codes that require equipment be installed according t

5、o the manufacturers installation instructions. AHRI recognizes that despite the excellent safety record of gas furnaces, there have been infrequent reports of gas furnace heat exchanger problems. To address these situations, an industry-accepted procedure known as the “Three-Step Method for Detectin

6、g Unacceptable Flue Gas Leakage from Furnace Heat Exchangers” has been used since the early 1980s to conduct field inspections of gas-fired furnace Heat Exchangers. Though this procedure has been effective for testing Heat Exchangers in natural draft Furnaces, its effectiveness for testing Heat Exch

7、angers on induced draft Furnaces that maintain a significant negative pressure within the Heat Exchanger has been questioned. Though it is unlikely for an induced draft Furnace to leak flue products from the Heat Exchanger to the circulated airstream, this guideline outlines a new test procedure to

8、enhance the existing three-step methodology to make it more applicable, reliable and repeatable for the inspection of induced draft furnace Heat Exchangers. Note: This is a new AHRI Guideline.TABLE OF CONTENTS PAGE Section 1. Purpose .1 Section 2. Scope 1 Section 3. Definitions1 Section 4. Five-Step

9、 Method.2 APPENDICES Appendix A. References - Normative .4 Appendix B. References - Informative 4 AHRI GUIDELINE X-2009 1INDUCED DRAFT FURNACE HEAT EXCHANGER INSPECTION Section 1. Purpose 1.1 Purpose. The purpose of this guideline is to outline a test procedure for the inspection of induced draft fu

10、rnace heat exchangers. 1.1.1 Intent. This guideline is intended for the guidance of the industry, including gas utility companies, government authorities, manufacturers, engineers, building inspectors, building code officials, installers, and contractors. 1.1.2 Review and Amendment. This guideline i

11、s subject to review and amendment. Section 2. Scope This guideline applies to the inspection of induced draft furnace heat exchangers. Section 3. Definitions All terms in this document follow the standard industry definitions in the current edition of ASHRAE Terminology of Heating, Ventilation, Air

12、Conditioning, and Refrigeration unless otherwise defined in this section. 3.1 Blower. A device for moving air by two or more blades or vanes attached to a rotating shaft. 3.2 Burner. Part of a furnace where flame is produced. 3.3 Flue Gas. All gases in a flue during combustion in the combustion cham

13、ber, including reacting products such as excess air, carbon dioxide, carbon monoxide, oxygen, water vapor, nitrogen, and other inerts. 3.4 Furnace. An enclosed chamber or structure in which heat is produced, as by burning fuel. 3.5 Heat Exchanger. A device to transfer heat between two physically sep

14、arated fluids. 3.6 Induced Draft. Fan exhaust of hot gases from the heat absorbing equipment. 3.7 PPM. Parts per million. 3.8 Return Air. Air extracted from a space, and totally or partially returned to an air-conditioning, heating or ventilating apparatus. 3.9 Should. . “Should” is used to indicate

15、 provisions which are not mandatory but which are desirable as good practice. 3.10 Static Pressure. Pressure exerted by a fluid at rest. 3.11 Supply Air. Air entering a space from an air-conditioning, heating, or ventilating apparatus. Section 4. Five-Step Method AHRI GUIDELINE X-209 1NOTE: To ensur

16、e accuracy of the measurements, take the following precautions: 1. Take the Return Air measurement after and the Supply Air measurement before any fresh air, ventilation, humidification and/or dehumidification connections. 2. Take more than one reading and average the results to obtain the CO level.

17、 2 This procedure is intended for use by qualified individuals trained and experienced in the servicing of an induced draft Furnace. All instrumentation used in the execution of this procedure must be in good working condition and calibrated appropriately. A gas analyzer capable of measuring carbon

18、monoxide (CO) concentration with 1 ppm resolution is required for this procedure. 4.1 Look for Flame Disturbances. Start the Furnace and observe any changes in the flame pattern as the circulating air blower starts operating. Look for floating flames, flame roll out or flame distortion. These condit

19、ions indicate a possible split seam, open crack, severe deterioration of the Heat Exchanger or gasketing material, or physical separation of the connected parts. Flame disturbance that occurs after the Blower comes on is a good indication that a Heat Exchanger problem may exist. Other air leaks in t

20、he vicinity of the Burners may also cause flame disturbances and should be corrected. If these disturbances are significant and cannot be corrected by eliminating the air leaks near the Burners, refer to 4.5 for physical inspection of the Heat Exchanger. If no flame disturbances are observed, procee

21、d to 4.2. 4.2 Measure CO levels in the Airstream1. After the Furnace has run for at least five minutes, measure the CO level in the return airstream near the Furnace and record the value. Then measure the CO level in the supply airstream at a location in the system where the air is well mixed. Gener

22、ally, a location downstream of one or more bends in the ductwork is a good place to take the sample for this measurement. Record this value. a) If there is no measurable difference in the CO in the Return and Supply Air, it is likely the Furnace is not leaking CO into the air stream. If the measured

23、 value is below 9 ppm, the Occupational Health and Safety Act (OHSA) acceptable maximum, proceed to 4.3. b) If there is no difference in the CO concentration between the Return and Supply Air, but there is CO detected in the air stream above 9 ppm, there may be another source of CO in the home such

24、as other gas-fired appliances, an automobile operating in a garage, or a fireplace in operation. Discuss the elevated CO levels and the possible sources with the home owner. c) If the CO in the Supply Air is less than the CO in the Return Air, it is possible that there is an error in the measurement

25、 or that the measurement is being diluted by a ventilation or fresh air intake. Repeat 4.2 with a different gas analyzer if possible. d) If the CO in the Supply Air is greater than the CO in the return air, it is possible that the Furnace is generating the CO that is leaking into the airstream. Proc

26、eed to 4.5. 4.3 Measuring CO levels in Flue Pipe. Allow the Furnace to run for at least five minutes. Then measure the CO in the flue pipe, using a properly calibrated combustion analyzer. If the CO reading is less than 200 ppm, no further action is necessary. If the CO reading is 200 ppm or higher,

27、 proceed to 4.4. 4.4 Verifying Proper Installation. Verify that the furnace installation complies with the manufacturers requirements and any applicable codes. Refer to the manufacturers installation instructions if available. Verify the gas orifice size, pressure switch settings, gas input rate and

28、 manifold pressure, proper conversion for fuel type and altitude (if applicable), vent lengths, duct static pressure and the provision for adequate combustion air to the Furnace. Check the Furnace for any damaged or disconnected wires or hoses. Check for misaligned Burners. Inspect the vent system a

29、nd combustion air pipe (if applicable) to check for holes or blockage. Make corrections as necessary and then re-check CO in a flue gas sample. If the CO is still at 200 ppm or higher in the Flue Gas, proceed to 4.5. 4.5 Visually Inspect Heat Exchanger. Disassemble the Furnace until you can visually

30、 inspect all heat exchanger exterior surfaces. Any crack or hole that is big enough to affect combustion will be easily visible to the naked eye. Do not use water, AHRI GUIDELINE X-2009 3cameras or smoking agents to check for leaks. Furnace heat exchangers joints are not hermetically sealed, so a sm

31、all amount of leakage is normal. If there are any abnormal splits, cracks or holes, the heat exchanger must be replaced. Note: If the inspection described in 4.5 does not show holes, cracks or separated seams, further investigation is necessary to determine the source of the CO contamination. AHRI G

32、UIDELINE X-209 4 APPENDIX A. REFERENCES - NORMATIVE None. APPENDIX B. REFERENCES - INFORMATIVE B1 Listed here are standards, handbooks, and other publications which may provide useful information and background but are not considered essential. References in this appendix are not considered part of this guideline. B1.1 ASHRAE Terminology of Heating, Ventilation, Air Conditioning, and Refrigeration, Second Edition, 1991, American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc., 1791 Tullie Circle N.E., Atlanta, GA 30329, U.S.A.