AIR FORCE AF M85-12 VOL 1 CHANGE 3-1972 OPERATION AND MAINTENANCE OF CENTRAL HEATING PLANTS AND DISTRIBUTION SYSTEMS《集中供暖装置和分配系统的运行和维护》.pdf

上传人:twoload295 文档编号:427231 上传时间:2018-11-07 格式:PDF 页数:2 大小:64.78KB
下载 相关 举报
AIR FORCE AF M85-12 VOL 1 CHANGE 3-1972 OPERATION AND MAINTENANCE OF CENTRAL HEATING PLANTS AND DISTRIBUTION SYSTEMS《集中供暖装置和分配系统的运行和维护》.pdf_第1页
第1页 / 共2页
AIR FORCE AF M85-12 VOL 1 CHANGE 3-1972 OPERATION AND MAINTENANCE OF CENTRAL HEATING PLANTS AND DISTRIBUTION SYSTEMS《集中供暖装置和分配系统的运行和维护》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、DEPARTMENT OF THE AIR FORCE Headquarters US Air Force Washington, 10 August 1972 Civil Engineering-General OPERATION AND MAINTENANCE OF CENTRAL HEATING AND DISTRIBUTION SYSTEMS AfM 85-12, Volume I, 1 June 1964, is changed as follows: 1. Page Changes. New or revised material is indicated by *. Remove

2、 v, vi 5, 6 21, 22 35, 36 71, 72 81 thru 84 93 thru 96 117, 118 133, 134 145 thru 148 151 thru 156 159, 160 163, 164 167 thru 174 207, 208 213 thru 216 229 thru 234 241 thru 244 253 thru 270 273, 274 277, 278 279, 280 283 thru 290 293, 294 299 thru 308 315, 316 319, 320 331, 332 337 thru 340 344.1 C

3、HANGE C AFM 85-12, Vol I 10 August 1972 Date 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Aug 66 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 28 May 68 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1 Jun 64 1

4、Jun 64 1 Aug 66 Insert v, vi 5, 6 21, 22 35, 36 71, 72 81 thru 84 93 thru 96 117, 118 133, 134 145 thru 148 151 thru 156 159, 160 163, 164 167 thru 174 207, 208 213 thru 216 229 thru 234 241 thru 244 253 thru 270 273, 274 277 thru 278.1 273, 280 283 thru 290 293, 294 299 thru 308 315, 316 319, 320 3

5、31, 332 337 thru 340 344.1 DISTRIBUTION : F Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-AFM 85-12 Volume IC W 3535789 0256893 859 W 10 August 1972 2. Make the following pen and ink changes: Page Paragraph Line Action To Be Taken 107 (cl (4) 7 Cha

6、nge “to” to “into” 124 60b(ll) 12 After “temperature” add “has” 136 68d (4) 4 Change second “and” to “an” 292 323b( 1) 3 Delete last word “an.” 62 h(1)9(b) 7 Change “gasses” to “gases” b 3. This change primarily updates the guidance given in Chapter 3, Boiler Water Treat- ment. Several changes are m

7、ade throughout the manual to clarify existing guidance; several changes are made to correct typographical errors in the existing manual. BY ORDER OF THE SECRETARY OF THE AIR FORCE OFFICIAL JOHN D. RYAN, General, USAF Chief of Staff DWIGHT W. COVELL, Colonel, USAF Director of Administration 2 3223 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1