AIR FORCE MIL-HDBK-348 NOTICE 1-1990 SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS《卫星控制网络硬件和软件业务验收过程》.pdf

上传人:brainfellow396 文档编号:427877 上传时间:2018-11-07 格式:PDF 页数:93 大小:3.71MB
下载 相关 举报
AIR FORCE MIL-HDBK-348 NOTICE 1-1990 SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS《卫星控制网络硬件和软件业务验收过程》.pdf_第1页
第1页 / 共93页
AIR FORCE MIL-HDBK-348 NOTICE 1-1990 SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS《卫星控制网络硬件和软件业务验收过程》.pdf_第2页
第2页 / 共93页
AIR FORCE MIL-HDBK-348 NOTICE 1-1990 SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS《卫星控制网络硬件和软件业务验收过程》.pdf_第3页
第3页 / 共93页
AIR FORCE MIL-HDBK-348 NOTICE 1-1990 SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS《卫星控制网络硬件和软件业务验收过程》.pdf_第4页
第4页 / 共93页
AIR FORCE MIL-HDBK-348 NOTICE 1-1990 SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS《卫星控制网络硬件和软件业务验收过程》.pdf_第5页
第5页 / 共93页
亲,该文档总共93页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、NOT MEASUREMENT I SENSITIVE 1 MIL-HDBK-348 (USAI?) 13 NOV 89 MILITARY HANDBOOK SATELLITE CONTROL NETWORK HARDWW AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS AMSC NIA THIS ”lENT- CONTAINS 9 2 PAGES. FSC 1810 DISTRIBUTION S TATEMENT A; Approved for public release; distribution unlirnitetl. Provided by

2、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-3!I LA W 7777770 0037573 7 m- MIL-HDBK-348 (USAF) 13 NOV 89 DEPARTMENT OF THE AIR FORCE Washington, D.C. 20360 MIL-HDBK-348 (USAF) Satellite Control Network Hardware and Software Operational Acceptance Pro

3、cess 1. This military handbook is approved for use within the Department of the Air Force, and is available for use by all Departments and Agencies of the Department of Defense. 2. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving thi

4、s document should be addressed to: B 4 USAF Space Systems Division, SSDISDMT P. O. Box 92960 Worldway Postal Center Los Angeles, CA 90009-2960 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. ii Provided by I

5、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-348 18 7777970 001757q O MIL-HDBK-348 (USAF) 13 NOV 89 FOREWORD 1. The Air Force Satellite Control Network (AFSCN) is a global, intercommand configuration of telemetry, tracking, control, and communications

6、 resources, all operating in concert to support Department of Defense (DoD) and other assigned space vehicles and space missions. The AFSCN consists of dedicated systems, government agencies operate and manage dedicated mission unique resources. The Air Force Space Command (AFSPACECOM) has general o

7、perational responsibility for the common user elements; the Air functions until Program Management Responsibility Transfer (PMRT). After PMRT of the system or equipment, the Air Force Logistics Command (AFLC) has management responsibility over AFSCN operational resources. e common user elements, and

8、 supporting resources. Various * 1 Force Systems Command (AFSC) has the sustaining engineering 2. An array of different: contractors work with each of these DoD agencies. It is therefore important that all contractors involved recognize what testing must be done and the procedure to follow to attain

9、 the operational status of modifications or upgrades in the AFSCN. 3. This document establishes the procedure for the turnover of operations and maintenance to the site and the site technical acceptance of systems, equipment, or software acquired by procuring activities for the AFSCN. The procedure

10、for effecting the transition of new or modified software from development to operational use is included. These processes precede Program Management Responsibility Transfer (PMRT) of the system or equipment per AFR 800-19, Systems or Equipment Turnover. 4. This document is intended for reference or

11、compliance in the contract Statements of Work and in Memoranda of Agreement between DoD agencies. The document identifies the required and software from development to operational use. - tasks for effecting the transition of new or modified hardware 1 iii Provided by IHSNot for ResaleNo reproduction

12、 or networking permitted without license from IHS-,-,-MIL-KDBK-348 (UM) 13 NOV 89 THIS PAGE INTENTIONALLY LEFT BLANK iv Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-34 NOTICE L L m 7779770 005bb7 5 m MIL-HDBK-348 (USAF) NOTICE 1 30 JUL 90

13、 MILITARY HANDBOOK SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS TO ALL HOLDERS OF MIL-HDBK-348 (USAF) 1. THE FOLLOWING PAGES OF MIL-HDBK-348 (USAF) HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED: NEW PAGE DATE DATE 11 30 JUL 90 11 13 NOV 89 REPRINTED WITHOUT CHANG

14、E 12 13 NOV 89 12 13 30 JUL 90 13 13 NOV 89 14 13 NOV 89 14 REPRINTED WITHOUT CHANGE x 2. RETAIN THIS NOTICE AND INSERT BEFORE TABLE OF CONTENTS. 3. Holders of MIL-HDBK-348 (USAF) will verify that page changes indicated above have been entered. This notice page will be retaine as a check sheet. This

15、 issuance, together with appended pages, is a separate publication. Each notice is to be retained by stocking points until the Military Handbook is completely revised or cancelled. Custodian: Air Force - 19 Preparing Activity: Air Force - 19 Doc 2545b Arch 144lb FSC 1810 DISTRIBUTION STm A : Approve

16、d for public release; distribution unlimited, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. NIL-HDBK-3q 18 9999970 0058328 7 .-. MIL-HDBK-348 (Um) 13 NOV 89 PAGE 1 . SCOPE . 1 1.1 P.POSE 1 1.2 APPLICATION . 1 2 . REFERENCED DOCUMENTS : . 2 3 . DE

17、FINITIONS AND ACROrJYMS . 3 3.1 DEFINITIONS 3 3.2 ACR0.S . 15 4 . GENERAL REOUIREMENTS. . 17 4.1 TESTING 17 4.2 HARDWARE DELIVERY TO SITE 17. 4 03 OPERATION AND MAINTENANCE RESPONSIBILITY TRANSFER 17 4 04 ACCEPT.CE . 17 4.5 STATUS REPORTING . 17 4.6 COMPUTER SOFTWARE TRANSITION 17 TEST PLANS AND PR.

18、ED.ES 19 4.7 4.7.1 Test Pla.8. 19 4. 7.2 Test Procedures 20 4.7.3 Software Test Plans and Software Test Description Doclllllents 20 I- 4 8 RETEST 21 4.8.1 During Compliance Testing 21 4.8.2 During Integrated System Testing . 21 4.8.3 . During Operational Tests and Evaluations . 22 4.9 DOCUMENTATION

19、. 22 4.3.1 Test Documentation Files 22 V Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-3L 3 m 7777770 0037577 b m MIL-HDBK-348 (USAF) 13 NOV 89 4.9.2 4.9.3 4.9.4 4.10 4.11 4.11.1 4.11.2 4.11.3 4.12 4.12.1 4.12.2 4 13 4.13.1 4.13.2 4.13.2.1

20、 4 13.2.2 4.13.2.3 4.13.2.4 4.13.2.5 4.13.2.6 4.13.2.7 4.13.2.8 4.13.3 4.13.3.1 4,13.3.2 4.13.3.3 4.13.3.4 4.13.3. fi CONTENTS (continued) PAGE Test Data 22 Test Log . 23 Documentation Formats. . 23 FIR.ARE 23 PART. MATERIAL. AND SOFTWARE UNIT DEVELOPMENT TESTS . AND EVALUATIONS 23 Part and Material

21、 Level Development Tests and Subassembly Level Development Tests and In-Process Evaluations 23 Tests and Inspections 23 Computer Software Unit Tests 23 STEP 1: COMPONENT TESTS AND EVALUATIONS . 24 Step 1: Hardware Components . 24 Step 1: Computer Software Components 24 STEP 2: CI COMPLIANCE TESTS (Q

22、UALIFICATION AND ACCEPTANCE) 25 Step 2: Test Execution and Data Recording . 25 Step 2.1: Single CI Compliance Tests 26 Step 2.1 Hardware CI Qualification 26 Step 2.1 Hardware CI Acceptance . 26 Step 2.1 Computer Software Configuration Item Qualification 26 Step 2.1 Test plan 26 Step 2.1 Test Procedu

23、res 27 Step 2.1 Software Test Plans and Software Test Description Documents . 27 Step 2.1 Test Execution and Report 28 Step 2.1 Test Analysis . 28 Step 2.2: Combined CI Compliance Tests 28 Step 2.2 Test Plan 29 Step 2.2 Test Procedures 29 Step 2.2 Software Test Plans and Software Test Description Do

24、cuments . 30 Step 2.2 Test Execution and Report 30 Step 2.2 Test Analysis 30 vi Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-HDBK-348 LB 9 9977770 0017598 8 W MIL-HDBK-348 (USAF) 13 NOV 89 CONTENTS (continued) PAGE 4.13.4 Commercial Off the

25、Shelf or Government Furnished Equipment Testing . 30 4.13.4.1 Commercial Off the Shelf or Government Furnished Hardware Tests . 31 4.13.4.2 Commercial Off the Shelf or Government Furnished Software Tests 31 . r 4.14 STEP 3: INTEGRATED SYSTEM TESTING . 31 4.14.1 General . 31 4.14.2 Air Force Test Tea

26、m 32 4.14.2.1 Step 3 Test Plan 33 4.14.2.2 Step 3 Test Procedure . 33 4.14.2.3 Step 3 Test Report 33 4.14.2.4 Deficiency Reporting During Step 3 Tests 33 4.14.2.5 Deficiency Prioritization . 34 4.15 STEP 4: INITIAL OPERATIONAL TESTS AND EVALUATIONS . 34 4.15.1 Step 4 Test Concept . 34 4.15.2 Step 4

27、Test Execution and Documentation . 34 4.16 STEP 5: FOLLOW-ON OPERATIONAL TESTS AND EVALUATIONS . 34 4.16.1 Step 5 Test Concept . 35 4.16.2 Step 5 Test Execution and Documentation . 35 5 . DETAILED REQUIREMENTS . 37 5.1 THE AIR FORCE TEST TEAM 37 5.1.1 Designation Criteria . 37 5.1.2 Membership and D

28、eveloper/Operator Coordination . 37 5.1.3 Air Force Test Team Independence . 38 . . L 5.2 AIR FORCE TEST TEAM TEST DIRECTOR 38 5.2.1 Responsibility . 38 5.2.2 Independence Concept . 38 5.2.3 Contractor Directions 38 5.3 CONTRACTOR HARDWARE MODIFICATION SITE ACCEPTANCE . 38 5.3.1 Modification Package

29、 . 38 5.3.1.1 Modification Package Content 40 vii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-HDBK-348 Lm 7799970 m9=7.?. . MIL-HDBK-348 (USAF) 13 NOV 89 CONTENTS (continued) PAGE 5.3.1.2 Delivery Schedule 40 5.3.1.3 Inventory Shortage and

30、Damage Reporting 40 5.3.1.4 Spare Parts and Special Tools 42 5.3.2 Modification Transmittal Notification 42 5.3.2.1 Modification Transmittal Notification Content 42 4 5.3.2.2 MTN Authentication . 43 5.3.2.3 Modification Package Acknowledgment 43 d 5.3.3 Modification Control Board Preinstallation Rev

31、iew 43 5.3.4 Scheduling Network Downtime 46 5.3.5 Installation and Checkout 46 5.3.6 Installation and Checkout Completion Notice 46 5.3.6.1 Integration Contractor Representative Responsibility . 46 5.3.6.2 Installation and Checkout Completion Notice Significance . 46 5.3.6.3 Validation of Technical

32、Documentation 48 5.3.7 Modification Control Board Postinstallation Review . 48 5.3.8 Mission Ready Status . 48 5.3 9 Operations and Maintenance Responsibility Transfer . 49 5.3.10 . OMRT Notification Significance 51 5.3.11 Reporting Deficiencies 51 5.3.11.1 Reporting Deficiencies During Contractor O

33、n Site Testing 51 5.3.11.2 Reporting Deficiencies During Integrated System Testing . 51 5.3.12 OMRT Constraints 52 5.3.12.1 Late Change-of Requirements . 52 . 5.3.12.2 Verification of Technical Documentation . 52 5.3.13 Deficiency Resolution . 53 5.3.13.1 Air Force Test Team Activities 53 5.3.13.2 P

34、ost-OMRT Reevaluation 53 5.3.13.3 Post-OMRT Resolution 54 5.3.14 Acceptance of Contractor Modifications 54 viii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-3Y 18 = 7797770 OOL7bOO 2 MIL-HDBK-348 (USAF) 13.NOV 89 CONTENTS (continued) PAGE

35、 5.3.14.1 Modification Technical Acceptance Recommendation 57 5.3.14.2 Equipment Installation/Modification Acceptance 58 5.4 MINOR HARDWARE MODIFICATION SITE ACCEPTANCE 58 5.4.1 Minor Modifications 58 5.4.2 Site Modification Review and Approval . 1 Notification . 58 5.4.3 Site Delivery of Minor Modi

36、fications . 58 -5.4.3.1 Documentation Package 58 5.4.3.2 Temporary Minor Modification Package . 60 5.4.3.3 On-Site Receipt and Review . 60 5.4.3.4 Logistics Delivery . 60 5.4.4 Modification Control Board Preinstallation Review . 61 5.4.5 Installation and Checkout . 61 5.4.6 Minor Modification Tests

37、. 61 5.4.7 Installation and Checkout Completion Notice 61 5.4.8 Modification Control Board Postinstallation Review . 62 5.4.9 Mission Ready Status . 62 5.4.10 Reporting Deficiencies . 62 . I 5.4.11 Deficiency Resolution . 63 5.4.12 Acceptance of Minor Modifications 63 5.4.12.1 Acceptance of Contract

38、or Minor Modifications 63 5.4.12.2 Acceptance of Permanent Minor Modifications . 63 5.4.12.3 Acceptance of Temporary Mjnor Modifications . 64 5.5 COMPUTER SOFTWARE TRANSITION . 65 5.5.1 Software Development Contractor Activities . 65 5.5.1.1 Software Package . 65 5.5.1.2 Audits . 67 5.5.1.3 Software

39、 Transmittal Notice 67 ix Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-348 18 m 7979770601 4 B MIL-HDBK-348 (USAF) 13 NOV 89 CONTENTS (continued) PAGE 5.5.2 Software Integration Contractor Activity . 67 5.5.2.1 Software Product Baseline 6

40、7 5.5.2.2 Software Integration Completion Notification . 69 5.5.2.3 Operational Software Build . 69 5.5.2.4 . Formal Qualification Review 72 c 5.5.3 Operating Agency Acceptance 72 5.6 STATUS REPORTING . 73 d 5.6.2 Status Codes 73 5.6.1.1 Installation Status Codes 73 5.6.1.2 Documentation Status Cdes

41、 . 74 5.6.2 Reporting Requirements . 75 5.6.2.1 Integration Contractor Reports . 75 5.6.2.2. Use of Status Codes 75 . 6 . 6.1 INTENDED USE 77 6.2 6.3 6.4 6.5 6.6 TABLE I GUIDANCE DOCUMENT REFERENCES . 77 RECORDS MAINTENANCE 78 MANAGEMENT OF OPERATIONAL TESTS AND EVALUATIONS 79 TAILORED APPLICATION .

42、 79 SUBJECT TERM (KEY WORD) LISTING 79 TABLES OVERVIEW MATRIX OF SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE TESTS AND EVALUATIONS 18 X V Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-3LI LB 9779970 0039602 b W MIL-HDBR-348 (USAI?) 13

43、NOV 89 CONTENTS (continued) PAGE FIGURES FIGURE 1. CONTRACTOR HARDWARE MODIFICATION SITE ACCEPTANCE FLOW (TYPICAL) 39 a v FIGURE 2. INTEGRATION DEFICIENCY REPORT (IDR Sample Format) 41 (MTN Sample Format) . i 44 (ICCN Sample Format) . 47 6 FIGURE 3. MODIFICATION TRANSMITTAL NOTIFICATION FIGURE 4. IN

44、STALLATION AND CHECKOUT COMPLETION NOTICE FIGURE 5. OPERATIONS AND MAINTENANCE RESPONSIBILITY TRANSFER NOTIFICATION (OMRT Sample Format) . 50 FIGURE 6. MODIFICATION TECHNICAL ACCEPTANCE RECOMMENDATION (MTAR Sample Format) 55 (EI/MA Sample Format) 56 FIGURE 7. EQUIPMENT INSTALLATION/MODIFICATION ACCE

45、PTANCE FIGURE 8. MINOR HARDWARE MODIFICATION SITE ACCEPTANCE FLOW (TYPICAL) . 59 FIGURE 9. COMPUTER SOFTWARE TRANSITION PROCESS. 66 FIGURE 10. SOFTWARE TRANSMITTAL NOTICE (STN Sample Format) 68 FIGURE 11. SERVICE/DEFICIENCY REPORT FORM (S/DR Sample Format) 70 . i xi Provided by IHSNot for ResaleNo r

46、eproduction or networking permitted without license from IHS-,-,-MIL-HDBK-348 18 W 7777970 0033603 I- MIL-HDBK-348 (USAF) 13 NOV 89 THIS PAGE INTENTIONALLY LEFT BLANK xii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-HIL-HDBK-348 (U=) 13 NOV 89 SEC

47、TIOE 1 scow . This document establishes the baseline for the site technical acceptance, and the procedures for turnover to site operations, of ground equipment and associated computer software in the Air Force Satellite Control letwork (AFSCN). includes transitioning modifications or upgrades of the

48、 existing resources to operational capability and the transfer of operations and maintenance responsibility from the implementing to the operating agencies, Status codes are established and defined for standardized progress reporting of hardware moUifications or installations and the associated documentation, This hanubook also contains definitions applicable to the satellite control network. 1.2 APPLICATfOlP This *. . . The AFSCN is continually evoiving by adding new and improved . space vehicle comand, control, and communications resources, Modifications and upgrades are constant oc

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1