ANSI ASME PCC-1-2013 Guidelines for Pressure Boundary Bolted Flange Joint Assembly《压力限制螺栓连接法兰联轴节组件的指南》.pdf

上传人:testyield361 文档编号:432026 上传时间:2018-11-11 格式:PDF 页数:112 大小:1.89MB
下载 相关 举报
ANSI ASME PCC-1-2013 Guidelines for Pressure Boundary Bolted Flange Joint Assembly《压力限制螺栓连接法兰联轴节组件的指南》.pdf_第1页
第1页 / 共112页
ANSI ASME PCC-1-2013 Guidelines for Pressure Boundary Bolted Flange Joint Assembly《压力限制螺栓连接法兰联轴节组件的指南》.pdf_第2页
第2页 / 共112页
ANSI ASME PCC-1-2013 Guidelines for Pressure Boundary Bolted Flange Joint Assembly《压力限制螺栓连接法兰联轴节组件的指南》.pdf_第3页
第3页 / 共112页
ANSI ASME PCC-1-2013 Guidelines for Pressure Boundary Bolted Flange Joint Assembly《压力限制螺栓连接法兰联轴节组件的指南》.pdf_第4页
第4页 / 共112页
ANSI ASME PCC-1-2013 Guidelines for Pressure Boundary Bolted Flange Joint Assembly《压力限制螺栓连接法兰联轴节组件的指南》.pdf_第5页
第5页 / 共112页
点击查看更多>>
资源描述

1、Guidelines for Pressure Boundary Bolted Flange Joint AssemblyAN AMERICAN NATIONAL STANDARDASME PCC-12013(Revision of ASME PCC-12010)ASME PCC-12013(Revision of ASME PCC-12010)Guidelines forPressure BoundaryBolted Flange JointAssemblyAN AMERICAN NATIONAL STANDARDTwo Park Avenue New York, NY 10016 USAD

2、ate of Issuance: November 12, 2013This Standard will be revised when the Society approves the issuance of a new edition.ASME issues written replies to inquiries concerning interpretations of technical aspects of thisdocument. Interpretations are published on the ASME Web site under the Committee Pag

3、es athttp:/cstools.asme.org/ as they are issued.Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the d

4、ate posted.The Committee Pages can be found at http:/cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting “Errata” in the “Publ

5、icationInformation” section.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced

6、 to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public

7、-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in this document, and does not undertake to insure anyone u

8、tilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own res

9、ponsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the establi

10、shedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The American Society of Mechanical EngineersTwo

11、 Park Avenue, New York, NY 10016-5990Copyright 2013 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTSForeword vCommittee Roster . vi1 Scope. 12 Introduction . 13 Training and Qualification of Bolted Joint Assembly Personnel 14 Cleaning and Examination of Flan

12、ge and Fastener Contact Surfaces . 15 Alignment of Flanged Joints 26 Installation of Gasket 27 Lubrication of “Working” Surfaces 58 Installation of Bolts 59 Numbering of Bolts 610 Tightening of Bolts 611 Tightening Sequence 1312 Target Torque Determination 1613 Joint Pressure and Tightness Testing 1

13、614 Records . 1615 Joint Disassembly . 1716 References 20Figures1 Indicator-Type Bolting for Through-Bolted Joints 112 Indicator-Type Bolting for Studded Joints . 123 Example Legacy and Alternative to Legacy Numbering Sequences for 12-BoltJoint . 144 48-Bolt Flange Bolt-Grouping Example 155 Example

14、Short Assembly Record . 176 Example Medium-Length Assembly Record . 187 Example Long Assembly Record 19Tables1M Reference Values for Calculating Target Torque Values for Low-Alloy SteelBolting Based on Target Prestress of 345 MPa (Root Area) (SI Units) . 31 Reference Values for Calculating Target To

15、rque Values for Low-Alloy SteelBolting Based on Target Prestress of 50 ksi (Root Area) (U.S. CustomaryUnits) . 42 Torque Increments for Legacy Cross-Pattern Tightening Using a Single Tool 73 Recommended Tool, Tightening Method, and Load-Control TechniqueSelection Based on Service Applications 74 Leg

16、acy Cross-Pattern Tightening Sequence and Bolt-Numbering SystemWhen Using a Single Tool 84.1 Alternative to Legacy Cross-Pattern Tightening Sequence and Bolt-Numbering System When Using a Single Tool 9iiiAppendicesA Training and Qualification of Bolted Joint Assembly Personnel 23B Description of Com

17、mon Terms . 39C Recommended Gasket Contact Surface Finish for Various Gasket Types 41D Guidelines for Allowable Gasket Contact Surface Flatness and DefectDepth . 42E Flange Joint Alignment Guidelines 48F Alternatives to Legacy Tightening Sequence/Pattern 51G Use of Contractors Specializing in Boltin

18、g Services 65H Bolt Root and Tensile Stress Areas 66I Interaction During Tightening 67J Calculation of Target Torque 68K Nut Factor Calculation of Target Torque 69L ASME B16.5 Flange Bolting Information 70M Washer Usage Guidance and Purchase Specification for Through-HardenedWashers . 71N Definition

19、s, Commentary, and Guidelines on the Reuse of Bolts . 76O Assembly Bolt Stress Determination 78P Guidance on Troubleshooting Flanged Joint Leakage Incidents . 90ivFOREWORDASME formed an Ad Hoc Task Group on Post Construction in 1993 in response to an increasedneed for recognized and generally accept

20、ed engineering standards for the inspection and mainte-nance of pressure equipment after it has been placed in service. At the recommendation of thisTask Group, the Board on Pressure Technology Codes and Standards (BPTCS) formed the PostConstruction Committee (PCC) in 1995. The scope of this committ

21、ee was to develop and maintainstandards addressing common issues and technologies related to post-construction activities andto work with other consensus committees in the development of separate, product-specific codesand standards addressing issues encountered after initial construction for equipm

22、ent and pipingcovered by Pressure Technology Codes and Standards. The BPTCS covers non-nuclear boilers,pressure vessels (including heat exchangers), piping and piping components, pipelines, andstorage tanks.The PCC selects standards to be developed based on identified needs and the availability ofvo

23、lunteers. The PCC formed the Subcommittee on Inspection Planning and the Subcommitteeon Flaw Evaluation in 1995. In 1998, a Task Group under the PCC began preparation of Guidelinesfor Pressure Boundary Bolted Flange Joint Assembly and in 1999 the Subcommittee on Repairand Testing was formed. Other t

24、opics are under consideration and may possibly be developedinto future guideline documents.The subcommittees were charged with preparing standards dealing with several aspects of thein-service inspection and maintenance of pressure equipment and piping. Guidelines for PressureBoundary Bolted Flange

25、Joint Assembly (PCC-1) provides guidance and is applicable to both newand in-service bolted flange joint assemblies. The Inspection Planning Using Risk-Based MethodsStandard (PCC-3) provides guidance on the preparation of a risk-based inspection plan. Imperfec-tions found at any stage of assembly, i

26、nstallation, inspection, operation, or maintenance are thenevaluated, when appropriate, using the procedures provided in the Fitness-For-Service Standard(API 579-1/ASME FFS-1). If it is determined that repairs are required, guidance on repair proce-dures is provided in the appropriate portion of the

27、 Repair ofPressure Equipmentand Piping Standard(PCC-2). To provide all stakeholders involved in pressure equipment with a guide to identifypublications related to pressure equipment integrity, a Guide to Life Cycle Management of PressureEquipment Integrity has been prepared (PTB-2).None of these doc

28、uments are Codes. They provide recognized and generally accepted goodpractices that may be used in conjunction with Post-Construction Codes, such as API 510, API 570,and NB-23, and with jurisdictional requirements.The first edition of ASME PCC-1, Guidelines for Pressure Boundary Bolted Flange Joint

29、Assembly,was approved for publication in 2000. The 2010 revision was approved by ANSI as an AmericanNational Standard on January 14, 2010. This 2013 revision includes many updates and a majornew Appendix A titled “Training and Qualification of Bolted Joint Assembly Personnel” andwas approved by ANSI

30、 as an American National Standard on August 12, 2013.vASME PRESSURE TECHNOLOGYPOST CONSTRUCTION COMMITTEE(The following is the roster of the Committee at the time of approval of this Standard.)STANDARDS COMMITTEE OFFICERSC. R. Leonard, ChairD. Peters, Vice ChairS. J. Rossi, SecretarySTANDARDS COMMIT

31、TEE PERSONNELJ. E. Batey, The Dow Chemical Co.C. Becht IV, Becht Engineering Co., Inc.D. L. Berger, PPL Generation LLCW. Brown, Integrity Engineering SolutionsP. N. Chaku, Lummus Technology, Inc.E. W. Hayman, ConsultantW. J. Koves, Pi Engineeering Software, Inc.D. A. Lang, FM GlobalD. E. Lay, Hytorc

32、C. R. Leonard, Life Cycle EngineeringK. Mokhtarian, ConsultantC. C. Neely, Becht Engineering Co., Inc.T. M. Parks, The National Board of Boiler and Pressure VesselInspectorsPOST CONSTRUCTION SUBCOMMITTEE ON FLANGE JOINT ASSEMBLY (PCC)C. C. Neely, Chair, Becht Engineering Co., Inc.B. J. Barron, Newpo

33、rt News ShipbuildingW. Brown, Integrity Engineering SolutionsE. W. Hayman, ConsultantD. E. Lay, HytorcviJ. R. Payne, JPAC, Inc.D. Peters, Structural Integrity AssociatesJ. T. Reynolds, Intertek MoodyS. C. Roberts, Shell Global Solutions (U.S.), Inc.C. D. Rodery, BP North American Products, Inc.S. J.

34、 Rossi, The American Society of Mechanical EngineersC. W. Rowley, The Wesley Corp.J. Taagepera, Chevron Energy Technology Co.K. Oyamada, DelegateT. Tahara, DelegateC. D. Cowfer, Contributing Member, Cowfer ConsultingE. Michalopoulos, Contributing Member, Ministry of Economics ofGreeceJ. R. Sims, Jr.

35、, Contributing Member, Becht Engineering Co., Inc.G. Milne, Flexitallic, Ltd.J. R. Payne, JPAC, Inc.C. D. Rodery, BP North American Products, Inc.J. Waterland, VSP TechnologiesASME PCC-12013GUIDELINES FOR PRESSURE BOUNDARYBOLTED FLANGE JOINT ASSEMBLY1 SCOPEThe bolted flange joint assembly (BFJA) gui

36、delinesdescribed in this document apply principally to pres-sure-boundary flanged joints with ring-type gaskets thatare entirely within the circle enclosed by the bolt holesand with no contact outside this circle.1These guidelinesmay be selectively applied to other joint geometries. Byselection of t

37、hose features suitable to the specific serviceor need, these guidelines may be used to develop effec-tive joint assembly procedures for the broad range ofsizes and service conditions normally encountered inindustry.Users are cautioned that the guidelines contained inASME PCC-1 have been developed ge

38、nerically and arerecommended for general applications. They may notnecessarily be suitable for all applications. Precautionaryconsiderations are provided in some cases but shouldnot be considered as all inclusive. Sound engineeringpractices and judgment should be used to determinethe applicability o

39、f a specific method or part of a methodto a specific application. Each joint assembly procedureshould be subject to an appropriate review by qualifiedpersonnel. While this Guideline covers joint assemblywithin the scope of ASME Pressure Technology Codesand Standards, it may be used on equipment cons

40、tructedin accordance with other codes and standards.Guidance on troubleshooting BFJAs not providingleak-tight performance is also provided in this document(see Appendix P).2 INTRODUCTIONA BFJA is a complex mechanical device; therefore,BFJAs that provide leak-free service are the result ofmany select

41、ions/activities having been made/per-formed within a relatively narrow band of acceptablelimits. One of the activities essential to leak-free per-formance is the joint assembly process. The guidelinesoutlined in this document cover the assembly elementsessential for a high level of leak-tightness in

42、tegrity ofotherwise properly designed/constructed BFJAs. It is1Rules for design of bolted flanges with ring-type gaskets arecovered in Mandatory Appendix 2 of ASME Boiler and PressureVessel Code, Section VIII, Division 1; see also NonmandatoryAppendix S for supplementary considerations for bolted fl

43、angesthat are helpful to the designer of Appendix 2 flanges.1recommended that written procedures, incorporatingthe features of these guidelines that are deemed suitableto the specific application under consideration, be devel-oped for use by the joint assemblers. Alternative featuresand methods for

44、specific applications may be used sub-ject to endorsement by the user.NOTE: Within the context of this Guideline, the term “user”includes the user and their authorized agent, as recorded in eitherthe contract documents or in the written assembly procedures (seepara. 14.1).3 TRAINING AND QUALIFICATIO

45、N OF BOLTEDJOINT ASSEMBLY PERSONNELIt is recommended that the user provide, or arrangeto have provided, as appropriate, essential training andqualification in accordance with Appendix A of thebolted joint assembly personnel who will be expectedto follow procedures developed from this Guideline.See s

46、ection F-2 of Appendix F for comments onaccepting flange joint assembly procedures not currentlylisted in these guidelines.The qualification of assemblers in accordance withAppendix A may be considered portable subject to theguidance in para. A-5.3.5.4 CLEANING AND EXAMINATION OF FLANGE ANDFASTENER

47、CONTACT SURFACESBefore assembly is started, clean and examine flangeand fastener contact surfaces as described in this section.With one exception, remove all indications of the pre-vious gasket installation from the gasket contact sur-faces; use approved solvents and/or soft-wire brushes,if required

48、, for cleaning to prevent surface contamina-tion and damage to existing surface finish. Avoid usingcarbon steel brushes on stainless steel flanges.The exception based on experience is residual flexiblegraphite that may remain in the surface finish grooveswhen either a flexible graphite clad or a spi

49、ral-woundgasket with flexible graphite filler is to be used as thereplacement gasket.(a) Examine the gasket contact surfaces of both mat-ing joint flanges for compliance with recommended sur-face finish (see Appendix C) and for damage to surfacefinish such as scratches, nicks, gouges, and burrs. Indica-tions running radially across the facing are of particularASME PCC-12013concern. Refer to Appendix D for guidelines coveringrecommended limits on gasket contact surface imperfec-tions and their locations.(1) It is recommended that surface-finish compara-tor gages be available to jo

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ANSI

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1