ARMY A-A-52051-1989 BINDING SKI ALPINE AND CROSS COUNTRY SNOW AND ICE TRAVERSING EQUIPMENT (SITE)《雪和冰通过设备(SITE)高山和越野滑雪捆绑带》.pdf

上传人:progressking105 文档编号:439859 上传时间:2018-11-15 格式:PDF 页数:2 大小:96.11KB
下载 相关 举报
ARMY A-A-52051-1989 BINDING SKI ALPINE AND CROSS COUNTRY SNOW AND ICE TRAVERSING EQUIPMENT (SITE)《雪和冰通过设备(SITE)高山和越野滑雪捆绑带》.pdf_第1页
第1页 / 共2页
ARMY A-A-52051-1989 BINDING SKI ALPINE AND CROSS COUNTRY SNOW AND ICE TRAVERSING EQUIPMENT (SITE)《雪和冰通过设备(SITE)高山和越野滑雪捆绑带》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 A-A-52051 LT = 7777774 0047370 3 W I - 78-10 I INCH-POUND 1 A-A-52051 October 12, 1989 CObMERCIAL ITEM DESCRIPTION BINDING, SKI, ALPINE AND CROSS COUNTRY, SNOW AND ICE TRAVERSING EQUIPMENT (SITE) The General Service Administration has authorized the use of this commercial item description, 1. SAL

2、IENT CHARACTERISTICS 1.1 Design and construction. 2-10-1 55. The ski binding shall conform to Drawing 2. QUALITY ASSURANCE 2.1 Certification. The contractor shall certify, and maintain subtmtiating evidence, that the product offered meets the salient characteristics and requirements of this Commerci

3、al Item Description, and that the product conforms to the producers own drawings, specifications, standards, and quality assurance practices. conformance prior to first: delivery and there after as may be otherwise provided far under the provisions of the contract. The Government reserves the right

4、to require proof of such 2.1.1 Visual examination. accordance with MIL-STD-105. shall be expressed in units of ski bindings. binding. Each lot of ski bindings shall be inspected in The inspection level shall be II. The lot size The sample size shall be one ski The ski bindings shall be examined for

5、the defects listed below: Finish omitted or not as specified; burrs, rough spots, sharp edges; any component missing or not specified type; any component fractured, split, dented, bowed, malformed, damaged, loose or corroded; markings in wrong location, incomplete, illegible, incomplete or not as sp

6、ecified. Beneficial comments, recommendations, additions, deletions, clarifications, etc. and any data which may improve this document should be sent to: Commander, U. S. Army Natick Research, Development, and Engineering Center, ATTN: STRNC-ES, Natick, MA 01760-5014. c FSC 8465 AMSC NIA e DISTRIBUT

7、ION STATEMENT A, Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A- A-SS 0-5.1 2.1 ,2 Dimensiona.1 .examination. The end items shal be examined without damaging or disassembling the end items as

8、 specified on the drawing. Only thosa dimenciohs that: can be evaluated shall be examine& the specified tolerances shall be classified as a defect. The iot size shall be expressed in. unifs of ski bindings. “he inspection level shall be S-3. Any dimension not within The sampze unit shall be one ski

9、binding. 3. PACKAGING 3.L Packaging- The ski bindings chalk be packaged as speciie& on Drawing 2-10-1 SEc 3-2 Marking. Harking shall be in accordance w2th MIL-STD-l29, 4.1 Intende4 use. military skiing. The ski binding is for use in both alpine and cross country 4,2 Ordering data. a. Title, number,

10、and date of this document. 4.3 The acceptable quality levels (AQLs) are recommended as follws: ar Far visual examination - 4.0 b. For dimensional examination - 2,s MlLPTARY INTERESTS: CIVIL AGENCY COORDINATING ACTIVITY: Custodians GSA - FSS &.view Activities Air Force - 11, 82 DtA CT PREPARING ACTIVITY: Army - GL (Project 8465-0034) u.aar Activity Air Farce - 45 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • STAS SR CEI 804+A1+A2-1995 Integrating - averaging sound level meters《积分平均声级计 》.pdf STAS SR CEI 804+A1+A2-1995 Integrating - averaging sound level meters《积分平均声级计 》.pdf
  • STAS SR CEI 811-1-1-1995 Common test methods for insulating and sheathing materials of electric cables Part 1 Methods for general application Section 1 - Measurement of thickness a.pdf STAS SR CEI 811-1-1-1995 Common test methods for insulating and sheathing materials of electric cables Part 1 Methods for general application Section 1 - Measurement of thickness a.pdf
  • STAS SR CEI 811-4-2-1995 Common test methods for insulating and sheathing materials of electric cables Part 4 Methods specific to polyethylene and polypropylene compounds Section T.pdf STAS SR CEI 811-4-2-1995 Common test methods for insulating and sheathing materials of electric cables Part 4 Methods specific to polyethylene and polypropylene compounds Section T.pdf
  • STAS SR CEI 811-5-1-1995 Common test methods for insulating and sheathing materials of electric cables Part 5 Methods specific to filing compounds Section One Drop-point-Separation.pdf STAS SR CEI 811-5-1-1995 Common test methods for insulating and sheathing materials of electric cables Part 5 Methods specific to filing compounds Section One Drop-point-Separation.pdf
  • STAS SR CEI 815-1986 Guide for the selection of insulators in respect of polluted conditions《选择隔绝污染条件方面的指南 》.pdf STAS SR CEI 815-1986 Guide for the selection of insulators in respect of polluted conditions《选择隔绝污染条件方面的指南 》.pdf
  • STAS SR CEI 839-1-3-1994 Alarm systems Part 1 General requirernents Section Three - Environmental testing《警报系统 第1部分:一般要求,第三节 环境测试 》.pdf STAS SR CEI 839-1-3-1994 Alarm systems Part 1 General requirernents Section Three - Environmental testing《警报系统 第1部分:一般要求,第三节 环境测试 》.pdf
  • STAS SR CEI 839-5-1-1995 Alarm systems Part 5 Requirements for alarm transmission syslems Section 1 Generai requirements for systems《警报系统 第5部分:报警传输系统要求 第1节:系统通用要求 》.pdf STAS SR CEI 839-5-1-1995 Alarm systems Part 5 Requirements for alarm transmission syslems Section 1 Generai requirements for systems《警报系统 第5部分:报警传输系统要求 第1节:系统通用要求 》.pdf
  • STAS SR CEI 839-5-2-1995 Alarm systems Part 5 Requirements for alarm transmission systems Section 2 General requirements for equipment《警报系统 第5部分:报警传输系统要求 第2节:设备的通用要求 》.pdf STAS SR CEI 839-5-2-1995 Alarm systems Part 5 Requirements for alarm transmission systems Section 2 General requirements for equipment《警报系统 第5部分:报警传输系统要求 第2节:设备的通用要求 》.pdf
  • STAS SR CEI 850-1988 Supply voltages of traction systems《牵引系统供电电压 》.pdf STAS SR CEI 850-1988 Supply voltages of traction systems《牵引系统供电电压 》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1