ARMY A-A-52476-1993 PUMP ENGINE PRIMING HAND-DRIVEN (NONAIRCRAFT) ENGINE《(非飞行器)发动机的手动驱动的发动机起动注油泵》.pdf

上传人:赵齐羽 文档编号:440005 上传时间:2018-11-15 格式:PDF 页数:5 大小:280.82KB
下载 相关 举报
ARMY A-A-52476-1993 PUMP ENGINE PRIMING HAND-DRIVEN (NONAIRCRAFT) ENGINE《(非飞行器)发动机的手动驱动的发动机起动注油泵》.pdf_第1页
第1页 / 共5页
ARMY A-A-52476-1993 PUMP ENGINE PRIMING HAND-DRIVEN (NONAIRCRAFT) ENGINE《(非飞行器)发动机的手动驱动的发动机起动注油泵》.pdf_第2页
第2页 / 共5页
ARMY A-A-52476-1993 PUMP ENGINE PRIMING HAND-DRIVEN (NONAIRCRAFT) ENGINE《(非飞行器)发动机的手动驱动的发动机起动注油泵》.pdf_第3页
第3页 / 共5页
ARMY A-A-52476-1993 PUMP ENGINE PRIMING HAND-DRIVEN (NONAIRCRAFT) ENGINE《(非飞行器)发动机的手动驱动的发动机起动注油泵》.pdf_第4页
第4页 / 共5页
ARMY A-A-52476-1993 PUMP ENGINE PRIMING HAND-DRIVEN (NONAIRCRAFT) ENGINE《(非飞行器)发动机的手动驱动的发动机起动注油泵》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、A-A-52476 m 9999974 0355986 943 m INCH-POUND A-A- 5 2 47 6 October 20, 1993 SUPERSEDING MIL-P-3306E 17 August 1987 MS 5 1 O 84C 17 January 1986 COMMERCIAL ITEM DESCRIPTION PUMP, ENGINE PRIMING, HAND-DRIVEN, (NONAIRCRAFT) ENGINE The General Services Administration has authorized the use of this comme

2、rcial item description (CID) as a replacement for MIL-P-3306E and MS51084C which are canceled. ABSTRACT This CID covers a hand-operated, displacement type pump for engine priming and a replacement kit. The pump is capable of delivering 5 to 20 cubic centimeters (cc) of fuel per stroke in 5 cc increm

3、ents determined by the number of sleeves installed. This pump is intended for installation in, or as auxiliaries to, the fuel systems of vehicles, and other military equipment powered by internal-combustion engines, either during production, or in the field as part of winterization or other kits. Fu

4、el for priming may be tank-installed to hold more volatile fuel. The replacement kit contains the engine priming pump, connecting hardware, and installation instructions. SALIENT CHARACTERISTICS O a. Materials. Materials shall be as specified herein. Materials not specifically designated shall be su

5、itable for use in priming pumps, when operated over specified ranges, without any change in physical or dimensional properties that would result in operation of the units falling outside of specified limits. The use of recovered materials made in compliance with regulatory requirements is acceptable

6、 providing that all requirements of this CID are met (see notes). Beneficial comments, recommendations, additions, deletions clarifications, etc. and any other data which may improve this document should be sent by letter to: U.S. Army Tank-Automotive Command, ATTN: AMSTA-GDS, Warren, MI 48397-5000.

7、 AMSC N/A FSC 2910 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. O Licensed by Information Handling ServicesA-A-52476 m 9999974 0155987 88T m A-A-52476 b. Design and construction. Design and construction of the engine priming pump shall be in accordance with figur

8、e 1 and as specified herein. The capacity of the engine priming pump, in cubic centimeters, is determined by the number of installed sleeves (see figure 1). When specified (see note b) the replacement kit shall be in accordance with Army drawing 5702557, including instruction sheet. c. Performance.

9、Unless otherwise specified, tests shall be performed with gasoline conforming to type II of MIL-G-3056 and under room ambient temperature conditions except for low temperature operation. d. Pumping resistance. The force against the knob or handle to start and to maintain plunger movement in either d

10、irection at any point in the normal stroke (not including that required to disengage from the retainer or holding device) shall not exceed 20 pounds while being operated for 55 strokes. e. Pump delivery (capacity). Pump delivery shall not be less than 95 percent (%) of the nominal capacity required

11、(see figure 1). The pump shall be connected to a test fuel supply and to a reservoir or receiver with suitable intake and discharge lines and fittings. The pump shall be operated at a uniform rate of 20 full strokes per minute for 5 minutes, pumping test fuel against a 20 inch suction head and a 54

12、inch discharge head. The next 10 strokes shall be counted and delivery volume measured for average delivery per stroke. f. Leakage. The pump shall evidence no air leakage when subjected to 20 pounds per square inch (psi) air pressure applied to the inlet and outlet ports, respectively, with the oppo

13、site port plugged or blocked off, while submerged in water. The plunger shall be drawn back to the end of the suction stroke, and shall then be subjected to a side force of 5 pounds in several directions. Rising air bubbles shall indicate leakage. g. Low temperature operation. The pump sha.11 meet t

14、he pump delivery requirements specified in salient characteristics (SC) 6D when operated at minus 65 degrees Fahrenheit (OF). The pump shall be filled with dry cleaning solvent or combat grade gasoline as specified in 2.3 and shall be conditioned for 48 hours at a temperature of minus 65 + 7OF. - h.

15、 Fuel effects. The pump shall operate properly, without impairment of subsequent functioning, after exposure to hydrocarbon test fluids. The pump shall be operated in accordance with SC e. (pump delivery) for one minute using hydrocarbon test fuel consisting of trimethylpentane and toluene mixture.

16、This pumping shall be repeated at 50 minute intervals using 8 cycles (see SC e.). A rest period of 16 hours shall follow, during which time the test fuel shall remain in the pump. The pumping shall then be resumed until an additional 8 cycles have been completed. The plunger cap and packings shall s

17、ubsequently show no evidence of swelling, shrinking, cracking or discoloration. i. Endurance. Pump shall conform to SC e (pump delivery capacity) after it has been subjected to 20 full strokes per minute for a period of 5 hours per day until 20 hours of operation have been reached. During periods of

18、 nonoperation the pump shall remain filled with fuel. j. Lubrication. The plunger shall be coated with grade 30 engine oil suitable for preservation and break-in. 2 Licensed by Information Handling ServicesA-A-5 247 b = 9999974 0355988 7Lb A-A-52 47 6 k. Exterior surface treatment. All exposed surfa

19、ces of the pump and its components shall be cleaned, treated, and painted in accordance with drawing 12369000. Unless otherwise specified (see note b), the color of topcoat shall be green 383. 1. Ozone resistance. When specified (see note b), rubber components shall be ozone resistant. m. Identifica

20、tion and markings. The pump identification and markings shall consist of inlet and outlet port identification (see figure l), the CID part number, and the manufacturers identification CAGE code. The replacement kit shall be marked in accordance with Army drawing 5702557. Identification and markings

21、of pumps and replacement kits shall be permanent and legible. QUALITY ASSURANCE PROVISIONS a. Responsibility for inspection. The contractor is responsible for the performance of all inspections (examinations and tests). b. Contractor certification. The contractor shall certify and maintain substanti

22、ating evidence that the product offered meets the salient characteristics of this commercial item description and that the product conforms to the producers own drawings, specifications, workmanship standards, and quality assurance practices. Items with known defects shall not be submitted for Gover

23、nment acceptance. The Government reserves the right to require proof of such conformance prior to the first delivery and thereafter as may be otherwise provided for under the provisions of the contract. PRESERVATION, PACKAGING, PACKING, LABELING, AND MARKING Preservation, packaging, packing, labelin

24、g, and marking for the desired level shall be as specified in the contract for the engine priming pump and in accordance with Army drawing 5702557 for the replacement kit. NOTES (This section contains information of a general or explanatory nature that a. Addresses for obtaining copies of referenced

25、 documents. may be helpful, but is not mandatory.) 1. Government specification. Copies of MIL-G-3056 “Gasoline, Automotive, Combat“ are available from the Navy Publications and Printing Service Office, Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094. 2

26、. Government drawings. Army drawing 5702557 “Special Packaging Instruction“ and Army drawing 12369000 “Chemical Agent Resistant Coatings (CARC) Paint Systems Index“ are available from U.S. Army Tank-Automotive Command, ATTN: Contracting Officer, Warren, MI 48397-5000. b. Ordering data. Acquisition d

27、ocuments must specify the following: 1. Title, number, and date of this CID. 2. Issue of DODISS to be cited in the solicitation, and, if required, 3. Specify capacity of engine priming pump and PIN number. 4. Whether replacement kit is required. the specific issue of individual documents referenced.

28、 Licensed by Information Handling ServicesA-A-5247b 9999974 01559139 652 A-A- 5 2 4 7 6 z 0 c a a w O z W O X U I ln 2 0 U W z 9 c a n v) O - VI W t- z W W t- W z z O 1 m 1 a a, u cv ou oc u -4 N m. zc - 5 -4 o mm .lut- crto * 3 I40 muelo Li -4 m mriom I 04Jm ac u Li alo m a, Li 5 c, id a, W O c c m

29、 c c, Li a, c 4J O c O -4 c, lu Li 3 P -4 W C O u Li O c P -4 m a, a a, c 4J c, Li O a, 3 O E o) Li 4J O C O 0 a a O O .4 c, id Li a, a O Li a, a O Li a Li O W a, 5 W h Q u U O cv LI O u u Ln d. . a, -.Y u0 uLi c, a, es -4 u om r( 4 Licensed by Information Handling ServicesA-A- 52 47 6 CID PIN no. 5

30、. Whether rubber components are to be ozone resistant, and to what 6. Color of paint if other than as specified. 7. Selection of applicable level of packaging requirements. degree. c. Part or identification number (PIN). The PINS to be used for engine priming pumps acquired to this CID are created a

31、s follows: A 52476 - X L CID designator. I- Pump capacity: 1 - 20 cc 2 - 10 cc 3-5cc 4 - 15 CC 5 - parts kit CID number. d. Cross-reference data. PumDs conforming to this CID are substitutable Capacity Number in of cc sleeves with pumps conforming to MIL-P-3306E, dated Former MS part number 17 Janua

32、ry 1986. Former ordnance part number PIN number to former part A52476-1 A5247 6-2 A52476-3 A52476-4 17 August 1987, and MS51084C, dated numbers are as follows: 20 O 10 2 5 3 15 1 MS51084-1 MS51084-2 MS51084-3 MS51084-4 8710979 8722841 8742193 8722842 e. Regulatory requirements. The offeror/contracto

33、r is encouraged to use recovered materials in accordance with Public Law 94-580 to the maximum extent practicable. MILITARY INTERESTS: Custodian Army - AT Review activities CIVIL AGENCY COORDINATING ACTIVITY: GSA-FSS PTiEPARING ACTIVITY: Army - AT Navy - MC DLA - CS (Project 2910-0208) User activity Army - ME 5 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索
资源标签

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1