ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf

上传人:syndromehi216 文档编号:440493 上传时间:2018-11-15 格式:PDF 页数:16 大小:603.81KB
下载 相关 举报
ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf_第1页
第1页 / 共16页
ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf_第2页
第2页 / 共16页
ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf_第3页
第3页 / 共16页
ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf_第4页
第4页 / 共16页
ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf_第5页
第5页 / 共16页
亲,该文档总共16页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、DOD-W-70666 33 7779706 0356633 7 DOD-W-70666 (AR) 15 December 1986 MILITARY SPECIFICATION WARHEAD, GUIDED MISSILE, HE, M207E6 TRUMPET LINER FOR This specification is approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use y .=. by all Departments and

2、Agencies of the Department of Defense. 9- * I 1. SCOPE 1.1 Scope. This specification covers the quality assurance provisions and special requirements not covered by the drawings for the fabrication and packaging of the liner or M207E6 Warhead. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1

3、Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (

4、DODISS) and supplement thereto, cited in the solicitation. SPECIFICATIONS MIL ITARY MIL-A-48078 - Ammunition Standard Quality Assurance Provisions, General Specification for Beneficial comments (recommendations, additions, deletions) and any pertinent data which may beof use in improv- ing this docu

5、ment should be addressed to: Commander, US. Army Armament, Munitions and Chemical Command, Attn: AMSMC-QA, Dover, New Jersey 07801-5001 by using the self-addressed Standardization Document Improve- ment Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1336 DIS

6、TRIBUTION STATEME“ A. Approved for public release; distribution is unlimited. THIS DOCUMENT CONTAINS /I, PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- DOD-W-70666 13 7797706 0356bLq O = STANDARDS MILITARY MIL-STD- 1 O 5 MIL-STD-116 DOD-W- 7

7、 O 6 6 6( all associated drawings and with the requirements of applicable standards and specifications. 3.3 Startinq stock. Raw material to be introduced into the cold forged process shall be analyzed for mechanical, electrical, physical, and chemical properties as shown below. 3.3.1 Physical proper

8、ties of startinq stock. The sample of startinq stock shall comply with the mechanical and electrical requirements of Copper nmber 101 (ClOlOO), Temper 060 as specified by Table 2 of ASTM-B-133 (ASTM-B-133M) or Table I of ASTM-B-187, with class 1 or 2 material acceptable. 3 Provided by IHSNot for Res

9、aleNo reproduction or networking permitted without license from IHS-,-,- DOD-W-70hhb 13 7777906 035661h 4 DOD-W-70666 (AR) 3.3.2 Chemical composition of startinq stock. The sample of starting stock shall comply with the chemical requirements of Copper number 101 (ClOlO) -Temper 060 as specified by A

10、STM-B-133 (ASTM-B-133M) or ASTM-B-187, supplemented by Table I of ASTM-F-68, with class 1 or 2 material acceptable. 3.4 Finished liner. The finished liner shall meet the grain size and hardness requirements as specified on the drawing. 3.5 Profile. The finished liner shall meet the profile requireme

11、nt as specified on the drawing. 3.6 Data requirements. The contractor shall generate data in accordance with the requirements of the data item description cited in 6.4. 3.7 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the s

12、ubmission of first article samples by the contractor shall be as specified in the contract. 3.8 Process control 3.8.1 Process documentation. Concurrent with submission of the first article sample (see 4.3), the contractor shall submit a written description of the process used to produce the samples

13、together with the means by which the process can be verified in production. The method of verification shall be reviewed by and must be acceptable to the government. See Data Item Description DI-P-1604 (Tailored). Proposed changes to the process which. produced the accepted first article sample shal

14、l be submitted to the government prior to actual implementation of the change. A new first article sample will be required for each process change if determined necessary by the technical agency (see 6.5, if non U.S. manufacturer). 3.8.2 Liner traceability. The Contractor shall also submit a method

15、to establish liner traceability with specified lots. This information shall be furnished as a part of D-P-1.604 (Tailored) above and shall be reviewed by and must be acceptable to the go ve r nmen t. 3.9 Workmanship. All liners shall be fabricated in a thorough, workmanlike manner. The parts shall b

16、e free of burrs, chips, sharp edges, cracks, unblended radii, dents, tool marks, chipped edges, warpage, gouges, surface defects, dirt, grease, corrosion products, burn marks, and other foreign matter. The cleaning method used shall not be injurious to any of the parts, nor shall the parts be contam

17、inated by the cleaning agents. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 13 7977906 O356617 b 4. 4 DOD-W-70666 (u) QUALITY ASSURANCE PROVISIONS Responsibility for inspections. Unless ot,.erwise specified in the contract or purchas

18、e order, the contractor is responsible for the performance of.al1 inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified

19、 herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescr.ibed requirements. Unless otherwise specified herein or in t

20、he contract, the provisions of MIL-A-48078 shall apply and are hereby made part of this specification. 4.1.1 Responsibility for compliance. All items must meet all the requirements of sections 3 and 5. The inspection set forth in this specifi.cation shall become a part of the contractors overall ins

21、pection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling in qua

22、lity conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.1.2 Certification provisions. Certification shall include test data and results for each characteristic specified below. Ce

23、rtification shall be required for all material used in manufacturing the liners and prior to performing final acceptance inspection. Certification of Conformance shall include name of raw material producer, date of purchase, purchase order number, quantity, and all chemical, mechanical, -and physica

24、l analyses performed on the material. The following statement shall be included: “The undersigned, individually, and as the authorized representative of the contractor, warrants and represents that: All the information supplied above is true and accurate; the material covered by this certificate con

25、forms to all contract requirements (including but not limited to the drawings and specifications); the inspection and test results, and the analyses appearing herein are true and accurate; and this certificate is made for the purpose of inducing payment and with knowledge that the information and ce

26、rtification may be used as a basis for payment. I CHARACTERIS TIC TEST DATA TO COMPLY WITH Raw material. 3.3. 3.3.1 and 3.3.2 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 13 m 9999906 035661 m DOD-W-70666 (AR) a. First article inspec

27、tion (see 4.3) b. Quality conformance inspection (see 4.4) 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article sample as designated by the contracting officer, for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the

28、 following item, in the sample quantity indicated. c c PART DESCRIPTION DRAW1 NG QUANTITY LINER, Trumpet Precision TOW 12589943 20 4.3.2 Inspections to be performed. Examine and test in the order listed on Table I and Figure 1. Sample material of the starting stock shall be selected prior to fabrica

29、tion and used for hardness and chemical composition tests. Examine all twenty (20) liners for major characteristics 103 - 112 and all minor characters of 4.4.2.1. Inspections for characteristics 113 and 114 of 4.4.2.1, shall be peEformed on a sample of ten (10) liners, randomly selected from the ori

30、ginal sample of twenty (20) liners. Inspections for characteristics 115 and 116 of 4.4.2.1, shall be performed on a sample of ten (10) liners; five (5) of which shall be selected from the sample designated for profile tests and five (5) from the remaining ten (10) first article samples (see Figure 1

31、). A certificate of conformance for raw material, is also required. 4.3.3 Rejection. See MIL-A-48078. 4.3.4 Completion. Upon completion of first article testing all piece parts shall be properly labeled/identif ied and sent to: Commander, U. S. Army Armament, Research, Development, and Engineering C

32、enter, Attn: SMCAR-CCH-A, Dover, N. J. 07801-5001. ,6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 33 M 9977906 0356639 T m c O .rl 4J u a, rn c .rl a, rl u .rl c, LI a c, II) LI .rl r.4 I H a, rl a a E-i s O E+ c O .rl II) .rl u a, LI

33、 pi 4J a, pi LI E+ 5 . LI a, C deu rlrl cucv rnm rtiw 6. . . *. rlcu rl cuN cu cucv wwwrnrn wwwww . . *.o rlcu m m cumrnww m m mmmmm . . . . .o. 3 u O c, rn P c .rl 4J & a 4J rn w O c O .rl -4J .rl rn O QI a O u rl a u .d E c u 7 Provided by IHSNot for ResaleNo reproduction or networking permitted w

34、ithout license from IHS-,-,-DOD-W-70bbb 13 M 7779706 0356620 b W DOD-W-70666(AR) Examine starting stock First Article Test Procedure c i for TOW Trumpet Liner Inner Surface Profile L Outer Surface Profile f I f Hardness Liner I i I i ers I l i Grain size of Liner i - Ship to ARDEC Figure 1 Provided

35、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 13 7777906 035bb23 DOD-W- 7 O 6 6 6 (AR) 4.4 Quality conformance inspection. 4.4.1 Inspection lot formation. Inspection lots shall be defined as liners made from the same heat of copper, subjected to

36、 the same manufacturing process using the same forging dies, during one (i) months production. Lot formation shall comply with applicable provisions of MIL-A-48078. 4.4.2 Examinations. See MIL-A-48078. Unless otherwise specified in the Classification of Defects and Test Tables, sampling plans for ma

37、jor and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W W W W O b I T n n O BI H E 1 a Y u O ci II! P c .FI c, u Id 4 II! W O II! a, .FI c, w rl a, Id rg u a, II! C 3r O

38、z .FI 8 24 u O c, II! 0 c .I4 c, u Id U II! W O c O .FI c, 4 II! O pi u rl Id u E a, c u 8 .FI h . E 5 X c ai Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 13 7777706 0356623 1 E W Y U n 8 z O F 5 4 u E a “ N w -Y . b . - bbb P- n n 11

39、._ 50 o pi coz B 4J u0 O ici0 c 54J . U 4, u) I aJ Q c O E a w E C u C 3 m I- 2 E 3 3 F m w O F s s O LL I a p: u) aJ u w P aJ cil n I- in Co L P - m (d O n E L O J L - L Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 (AR) 4.4.3 Lot acce

40、ptance testing. Testing is described in Quality Conformance Inspection tables. A sample of 14 trumpet liners shall be utilized for lot acceptance tests. 4.4.3.1 Profile sampling. Perform and record inner surface and outer surface profile measurements on seven (7) liners to be designated for penetrat

41、ion tests. 4.4.3.2 Hardness and grain size sampling. Randomly select two (2) liners from the first 25 liners manufactured, two (2) liners from the last 25 liners manufactured, and three (3) liners from the remainder of the lot for a total of seven (7) liners and perform the destructive tests in acco

42、rdance with 4.5.2.2.1 and 4.5.2.2.2. 4.4.4 Inspection equipment. The inspection equipment required to perform the examination and tests prescribed herein is described in the “Paragraph Reference/Inspection Method“ column in the tables starting with 4.4.2.1. The contractor shall submit for approval i

43、nspection equipment designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078 and 6.3 herein. 4.5 Methods of inspection 4.5.1 Materials, components and processes. Compliance with all requirements of Section 3 of this specification shall be ascertained by current and continui

44、ng examination of inspection and test data to determine that all comp,onents (parts and materials) have been inspected and tested and found to comply with their respective drawing and specification requirements, and that all spe.cif ied manufacturing processes have been followed. and mechanical insp

45、ections and tests shall verify compliance with 4.5.1.1 Visual and mechanical inspection. The visual, manual the requirements of Section 3 and 5 of this specification in accordance with Table I and 4.4.2 herein. 4.5.2 Metallurgical and chemical tests. The following tests shall be performed using equi

46、pment and procedures prescribed by ASTM-B-249 (ASTM-B-249M) . 4.5.2.1 Starting stock 4.5.2.1.1 Physical properties of starting stock. Hardness Failure of the sample to comply tests shall be per ASTM-E-18. with 3.3.2 shall cause rejection of that quantity of starting stock represented by the sample.

47、These test data shall be independent from the supplier data. Results of test data shall be submitted in accordance with DI-T-5247 (tailored) (see 6.4). 12 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 13 7779706 0356625 5 W DOD-W-70666

48、(AR) 4.#5.2.1.2 Chemical composition of starting stock, Chemical composition tests shall utilize methods prescribed by ASTM-F-68. Failure of the sample to comply with the-requirements of ASTM-B-187, supplemented by ASTM-F-68, shall cause rejection of that quantity of starting stock represented by th

49、e sample. These test data shall be independent from supplier data. Results of test data shall be submitted in accordance with DI-T-5247 (tailored) (see 6.4). 4.5.2.2 Finished liner. 4.5.2.2.1 Hardness of finished liner. Hardness tests of finished liners shall be per ASTM-E-92. The sample liners shall be sectioned longitudinaliy into two

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1