ARMY MIL-C-14041 B (4)-1987 CARRIER HOSPITAL PROTECTOR HEADPIECE M12《M12型医疗抗菌帽》.pdf

上传人:ownview251 文档编号:441201 上传时间:2018-11-15 格式:PDF 页数:3 大小:101.67KB
下载 相关 举报
ARMY MIL-C-14041 B (4)-1987 CARRIER HOSPITAL PROTECTOR HEADPIECE M12《M12型医疗抗菌帽》.pdf_第1页
第1页 / 共3页
ARMY MIL-C-14041 B (4)-1987 CARRIER HOSPITAL PROTECTOR HEADPIECE M12《M12型医疗抗菌帽》.pdf_第2页
第2页 / 共3页
ARMY MIL-C-14041 B (4)-1987 CARRIER HOSPITAL PROTECTOR HEADPIECE M12《M12型医疗抗菌帽》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 - -. . - MIL-C-LY043B (4) Y2 m 9979906 0232330 5 m ,- I e 5 MIL-C-l4041B( EA) AMENDMEXF 4 20 May 1987 SUPERSEDING AMENDMENT 3 11 March i986 MILITARY SPECIFICATION CARRIER, HOSPITAT, PROTECTOR HEADPIECE, M12 This amendment forms a part of MIL-C-lhOblB(EA) , dated 28 February 1964, and is approved fo

2、r use within the Chemical Research and Development Center, Department of the Army and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1: Under STANDARDS, delete “FEDERAL“ and “FED-STD-406 - Plastics : Methods of Testing.“ Under STANDARDS, MILITARY, delete

3、“MIL-STD-129 - Marking for Shipment and Storage. I - PAGE 2 Under DRAWINGS , delete “EDGEWOOD ARSENAL“ and substitute with the following : “U.S. ARMY AKMAMENT, MUNITIONS AND CHEMICAL COMMAND CHEMICAL HESWCH, DEVELOPMENT AND ENGINEERING CENTER“ After the list of drawings add the following: “SPECIAL P

4、ACKAGING INSTRUCTIONS (SPI) P5-4-1002 - Carrier, Hospital Protector Headpiece, M12.“ FSC 4240 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 1 of 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Section 5: Delete i

5、n its entirety and substitute the following: MIL-C-l4041B( EA) AMENDMENT 4 2.2: Delete “UNIFORM CLASSIFICATION COMMITTEE“ and the four lines following that heading and add the following: “ASTbI STANDARDS D882 - Tensile Properties and Thin Plastic Sheeting. (Application for copies should be addressed

6、 to ASTM, 1916 Race Street, Philadelphia , PA i91 O3 . ) I PAGE 3 3.3: Delete “4 pounds“ and substitute “8 pounds per inch“. PAGE 4 4.6: Delete paragraph 4.6 in its entirety and substitute the following: “4.6 Seam strength. The bond strength of the seam shall be determined as specified in ASTM D-882

7、. In determination of the bonding strength, the seam shall be at the center of the specimen and perpendicular to the center line. At least five specimens shall be tested for bond strength. The average of the bond tensile strength shall be as specified.“ _- PAGE 5 “5. PACKAGING 5.1 Interplant shipmen

8、t (see 6.3). The carrier shall be unit packed and packed to provide adequate protection from physical damage from the supply source to the first receiving activity for immediate use or further processing. Shipping containers shall be in compliance with the rules and regulations applicable to the mod

9、e of transportation. Marking shall be in accordance with FED-STD-123, and shipping containers shall include the contractors name, address , contract number, and date of rnanufactiire. 5.2 Repair parts. When this item is being prociired for storage and issue as a repair part, unit packing, packing an

10、d marking shall be as specified in SPI P5-4-1002.“ 6.2: Add I( c) Degree (level of packaging protection (paragraph 5 , above) .It 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- _ - MIL-C-L404LB (4) 42 U 9997706 0232332 9 U MIL-C-lkOblB( EA) AMEND

11、MENT 4 6.3: Delete in its entirety and substitute the following: “6.3 Interplant shipment. Packaging and packing for interplant shipment is for supplies and materials that do not enter the military supply system. Typical interplant shipments from a vendor to a subcontractor or to a prime con- tracto

12、r, or from a vendor or contractor to a military arsenal or plant.“ Add the followiw new paragraph: “6.4 International interest. Certain provisions of this specification are the subject of international standardization agreement &STAG-218. When amend- ment, revision, or cancellation of the specificat

13、ion is proposed that will modify the international agreement concerned, the preparing activity will take appropriate action through international standardization channels, including departmental standArdization offices, to change the agreement or make other appropriate accommodations Custodian: AXTIIY - JW Preparing activity: Am - EA Project No 424O-Ag07 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1