ARMY MIL-C-48697 (5)-2000 CARTRIDGE 60MM TP M50A3 LOADING ASSEMBLING AND PACKING《M50A3型60MM曳光弹 的装卸 组装和包装》.pdf

上传人:fuellot230 文档编号:441661 上传时间:2018-11-15 格式:PDF 页数:3 大小:75.20KB
下载 相关 举报
ARMY MIL-C-48697 (5)-2000 CARTRIDGE 60MM TP M50A3 LOADING ASSEMBLING AND PACKING《M50A3型60MM曳光弹 的装卸 组装和包装》.pdf_第1页
第1页 / 共3页
ARMY MIL-C-48697 (5)-2000 CARTRIDGE 60MM TP M50A3 LOADING ASSEMBLING AND PACKING《M50A3型60MM曳光弹 的装卸 组装和包装》.pdf_第2页
第2页 / 共3页
ARMY MIL-C-48697 (5)-2000 CARTRIDGE 60MM TP M50A3 LOADING ASSEMBLING AND PACKING《M50A3型60MM曳光弹 的装卸 组装和包装》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、INCH- POUND MIL-C-48697 (AR) AMENDMENT 5 SUPERSEDING AMENDMENT 4 3 April 1995 31 May 2000 MILITARY SPECIFICATION CARTRIDGE, 60MM, TP, M50A3 LOADING, ASSEMBLING AND PACKING IMIL-C-48697 was inactivated after 13 Auqust 1997 for new desiqn This amendment forms a part of MIL-C-48697(AR), dated 11 August

2、 1987, and is approved for use by the U.S. Army Armament Research, Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 3 * 3.3.5, Add new sentence as follows: ?When a round is less than 80% of average horizontal range but no

3、t less than 60% of average horizontal range (calculated without this round), this round shall not be included in the calculation of range precision.? * 3.3.5.1, Delete ?80 percent? and substitute ?60 percent?. PAGE 6 * 4.4.2, Delete in its entirety and substitute: ?4.4.2 Examination. See MIL-A-48078

4、. a. Sampling plans. Unless otherwise specified in the classification of defects and test tables, sampling plans for major and minor defects shall be in accordance with MIL-STD- 105, Inspection Level II.? 1 of 3 AMSC N/A FSC 1310 DISTRIBUTION STATEMENT A. Approved for public release; distribution is

5、 unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48697 (AR) AMENDMENT 5 PAGE 10 4.4.2.4, Critical Defect 2, Delete in its entirety. Major 101, Delete in its entirety. Major 103, Delete: “(except as described by Critical 2 above) . Ma

6、jor 105 and 106, Add as follows: “105 Sealing compound bead improperly located, missing or not full 360 degrees in base of cartridge housing cavity (prior to insertion of ignition cartridge) . Visual 106 Sealing compound bead improperly located, missing or not full 360 degrees on red end of ignition

7、 cartridge (prior to seating of primer into fin cavity) . Visual“. Major 107 and 108, Add as follows: “107 Fuze not fully seated . 0.40% . 3.2 . Visual 108 Fin and fin extension not fully seated . 0.40% . 3.2 . Visual“. * Major 109 and 110, Delete in their entirety. Minor 203, Delete in its entirety

8、. PAGE 11 * 4.4.2.5, Major Defect 101, Delete and substitute: “101 Propellant sheets damaged . 100% . 3.2 . Visual“. PAGE 14 * Change 4.4.3.2f to read as follows: Iff. Short rounds (horizontal range less than 60 percent of average horizontal range), Critical defect (see 3.3.5.1).“ * Add new paragrap

9、h 4.4.3.29- as follows: Ilg. Short rounds (horizontal range less than 80 percent of average horizontal range but not less than 60 percent of horizontal range) , Major defect .I 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48697 (AR) AMENDM

10、ENT 5 PAGE 14 (cont) * Change 4.4.3.2.1 to read as follows: !IC. One or more short rounds with less than 60 percent of average horizontal range occur.” * Add new paragraph 4.4.3.2.19- as follows: Ilg. Two or more short rounds with less than 80 percent of average horizontal range but not less than 60

11、 percent of horizontal range occur.” * Change 4.4.3.2.2 to read as follows: !IC. One or more short rounds with less than 60 percent of average horizontal range occur.” PAGE 15 * Add new paragraph 4.4.3.2.29- as follows: Ilg. Two or more short rounds with less than 80 percent of average horizontal ra

12、nge but not less than 60 percent of horizontal range occur.” The margins of this amendment are marked with an asterisk or vertical lines to indicate where changes (modifications, additions, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Gov

13、ernment assumes no liability whatsoever for any inaccuracies in this notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR Preparing activity: Army-AR (Project 1310 - 0594) 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1