ARMY MIL-C-51326 (2)-1984 CALCULATOR NUCLEAR YIELD M4A1《M4A1型核裂变产额计算器》.pdf

上传人:appealoxygen216 文档编号:441795 上传时间:2018-11-15 格式:PDF 页数:2 大小:65.76KB
下载 相关 举报
ARMY MIL-C-51326 (2)-1984 CALCULATOR NUCLEAR YIELD M4A1《M4A1型核裂变产额计算器》.pdf_第1页
第1页 / 共2页
ARMY MIL-C-51326 (2)-1984 CALCULATOR NUCLEAR YIELD M4A1《M4A1型核裂变产额计算器》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、?IIL-C-51326(MU) ANENDMENT- 2 12 January 1984 SUPERSEDING AMENDMENT- 1 25 May 1973 MILITARY SPECIFICATION CALCULATOR, NIJCLEAR YIELD, M4A1 This amendment forms a part of Military Specification MIL-C-51326(MU), dated 11 December 1968, and is approved for.use by the US Army Armament, Munitions and Che

2、mical Command, Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1 : Under “DRAWINGS“ delete “DL5-86-36“ and substitute “C5-86-36.“ Delete “M4A1“ and substitute “ABC-M4Al.“ PAGE 2 2.2: Delete “(Application for copies of these rati

3、ngs, rules and regulations should he addressed to Uniform Classification Committee, 202 Union Station, 516 West Jackson Boulevard, Chicago, Illinois 60606.)“ and substitute the follow- ing : “(Application for copies of these ratings, rules and regulations should be addressed to Uniform Classificatio

4、n Committee, Room 1106, 222 South Riverside Plaza, Chicago, IL 60606 . ) . “ 3.1.1: Delete “DL5-86-36“ and substitute “C5-86-36.“ 3.1.2: Delete “DL5-86-36“ and substitute “C5-86-36.“ 3.3: In table I, revise as follows: a. Change 1500 + 200 kt to 1400 + 300 kt b. Change 10 + 1.0 kt to 16 + 2 kt - - -

5、 - C. Change 100 + 2 kt to 125 + 12 kt - - FSC 6665 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-5L326 (2) bb 9 7779706 0340257 7 9 MIL-C-51326(MU) AMENDMENT-2 3.4: Delete “M4A1“ and substitute “ABC-M4Al.“ PAGE 3 4.3.1: Delete “M4A1“ and sub

6、stitute “ABC-M4Al,“ two places. PAGE 4 4.4.1: Delete “M4A1“ and substitute “ABC-M4Al.“ 4.4.3.2: Delete “M4A1“ and substitute “ABC-M4Al.“ PAGE 5 4.4.4(c): Problem 3, change “observed cloud width at Bang Time“ to “observed cloud width at 5 minutes.“ Following paragraph 6.2, add new paragraph: “6.3 Int

7、ernational interest. Certain provisions of this specification are the subject of international standardization agreement (see Quadripartite Standardization Agreement-207, edition No. 2). When amendment, revision or can- cellation of this specification is proposed which will affect or violate the int

8、ernational agreement concerned, the preparing activity will take appropriate reconciliation action through international standardization oficec, if required. “ Custodian: Army - EA Preparing activity: Army - EA Project No. 6665-A449 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1