ARMY MIL-C-60032-1964 CHARGE ASSEMBLY DEMOLITION KIT M37 FOR BLOCK DEMOLITION M5A1 PARTS FOR LOADING ASSEMBLY AND PACKING《M37型爆破元件的装药 M5A1零件装载 组装和包装》.pdf

上传人:terrorscript155 文档编号:441900 上传时间:2018-11-15 格式:PDF 页数:7 大小:445.02KB
下载 相关 举报
ARMY MIL-C-60032-1964 CHARGE ASSEMBLY DEMOLITION KIT M37 FOR BLOCK DEMOLITION M5A1 PARTS FOR LOADING ASSEMBLY AND PACKING《M37型爆破元件的装药 M5A1零件装载 组装和包装》.pdf_第1页
第1页 / 共7页
ARMY MIL-C-60032-1964 CHARGE ASSEMBLY DEMOLITION KIT M37 FOR BLOCK DEMOLITION M5A1 PARTS FOR LOADING ASSEMBLY AND PACKING《M37型爆破元件的装药 M5A1零件装载 组装和包装》.pdf_第2页
第2页 / 共7页
ARMY MIL-C-60032-1964 CHARGE ASSEMBLY DEMOLITION KIT M37 FOR BLOCK DEMOLITION M5A1 PARTS FOR LOADING ASSEMBLY AND PACKING《M37型爆破元件的装药 M5A1零件装载 组装和包装》.pdf_第3页
第3页 / 共7页
ARMY MIL-C-60032-1964 CHARGE ASSEMBLY DEMOLITION KIT M37 FOR BLOCK DEMOLITION M5A1 PARTS FOR LOADING ASSEMBLY AND PACKING《M37型爆破元件的装药 M5A1零件装载 组装和包装》.pdf_第4页
第4页 / 共7页
ARMY MIL-C-60032-1964 CHARGE ASSEMBLY DEMOLITION KIT M37 FOR BLOCK DEMOLITION M5A1 PARTS FOR LOADING ASSEMBLY AND PACKING《M37型爆破元件的装药 M5A1零件装载 组装和包装》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MILM0032 (MU) 1 APRIL 1964 MILITARY SPECIFICATION CHARGE ASSEMBLY, DEMOLITION KIT, M37 FOR BLOCK DEMQLITION, M5A1, PARTS FOR LOADING, ASSEMBLY AND PACKING 1. SCOPE MIL-STD-109 -Quality Assurance Terms and Defini- tions. 1.1 This specification covers special re- quirements not covered by the drawings

2、 and provides quality assurance provisions for MIL-STD-1235 -Single and Multilevel the fabrication of parts, loading, assembling Continuous Sam- and packing or one type of demolition item, designated as Charge Assembly, Demolition, Ma7 for Block Demolition M6A1. piing PJALITY ASSURANCE PRCIVISIONS 4

3、.r ni-rieral quality asswanee provisions. Tht supplier is responsible for the perform- zmc qf :;Il inspection reqiiirements specified hewig, 3xcept as otherwise specified, the supplia may utilize his own or any other inspection facilities and services acceptable to the Ci-vernment. Znspection record

4、s of the examii?.ntions and tests shall be kept com- plete z?.! available to the Government as specified in the contract or order. The Gov- ernment reserves the right to perform any of the inspections sct forth in the specifica- 2 Luc- tion where such inspections are deemed iiecessary to assure that

5、 supplies and services conform to prescribed requirements. Refer- ence shall be made to Standard MLGSTD- 109 in order to define terms used herein. The provisions of Specification MIGA-2550 shall apply. 4.i.l. Contractor qualitg assurance system. The contractor shall provide and maintain an effective

6、 quality assurance system in com- pliance with the requirements of Specific a t ion MIL-1-45208. 4.1.2 Submission of product. At the time the completed lot of product is submitted to the Government for acceptance the contrac- tor shall supply the following information accompanied by a certificate wh

7、ich attests that the information provided is correct and applicable to the product being submitted : (a) A statement that the lot complies with all quality assurance pro- . visions of the approved current writ ten description of the system. (b) Number of units of product in- spected. (c? Results obt

8、ained for all inspection perforr;ied. (d) Drawing, specification number and date, together with an identifica- tion and date of changes. (e) Certificates of analyses on all ma- terial procured directly by the contractor when such material is controlled by Government specifi- cations referenced in an

9、y of the contractual documents. (f) Number of items in the lot. (g) Date submitted. The certificate shall be signed by a responsi- ble agent of the certifying organization. The initial certificate submitted shall be sub- stantiated by evidence of the agents authori- ty to bind his principnl. Substan

10、tiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. I. t Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-

11、,-NIL-C-60032 13 W 799990b 0335OLiO Li MIL-C-60032 (MU) 4.1.3 Goz:cmnient wficitioit. Using the contractors written quality assurance procedure, this detail specification, the appli- cahlc drawings and other contractual docu- ments as a guide, the Government inspector shall verify at unscheduled int

12、ervals all quality assurance operations performed by the ccntractor. Verification will be in accord- ance with Specification MIL-1-46208 and will be performed to the extent necessary to as- sure compliance with he contractual require- ments. Severity of Government inspection of individual characteri

13、stics will be directly re- lated to the seriousness of the classification assigned, In no instance will a characteristic classified “critical” be accepted solely on the basis of the contractors records. 4.2 Inspection provisions. 4.2.1 Lot- fmtion. A lot shall consist of Charge Assemblies, Demolitio

14、n, M37, for Block Demolition M5A1 produced by one manufacturer in one unchanged process, in ac- cordance with the same drawing, same draw- ing revision, same specification, and same specification revision. Drawing, specification, and process changes not affecting safety, performance, or fit, as dete

15、rmined by the Government, shall not necessitate changing the lot interfix number. Lots shall be sub- mitted for inspection in accordance with Standard MMTD-1OBD (or Standard MIL- STD-1235 when applicable). Each Iot shall contain : (a) Parts or parts assemblies having the same interfix number from oi

16、ie manufacturer. (b) Baa assemblies of one lot interfix number from one manufacturer. (c) Demolition blocks of one lot interfix number from one manufacturer. (d) Priming assemblies of one lot inter- fix number from one manufac- turer. (e) Carrying case assemblies of one lot intei%x number from one m

17、anu- facturer. 4.2.2 Esuinfnntion. Sampling pians and procedures for the followinn classifications of defects shall be in accordance with Standard MIL-STD-105D except that inspection for critical defects, when listed, shall be 100 per- cent. Continuous sampling plans in accord- ance with Standard MI

18、L-STD-1235 may be used if approved by the procuring activity. Also, at the option of the procuring activity, AQLs ancl sampliiig plans may be applied to the individual characteristics listed using an AQL of 0.25 percent for each major defect and an AQL of 0.40 percent for each minor defect. Equipmen

19、t necessary for the per- formance of the inspections listed shall be in accordance with 4.2.4. 4.2.2.1 Loading assembly (see dwg. 8833395, covering a detail of dwg. 8861113). Mrlltnd o/ Code No. Co1rKorir.r Drfrrls itislirctiuti (see 6.2) Critical : None defined. Ba jor : None defined. Minor: AQL 1.

20、5 percent 201. Sides warped or wrinkled. Visual O1001 202. Cut, puncture, tear or burn through .Visual 01002 203. Marking niissing, incom- plete, improper or unidentifiable .Visual 01003 204. Cracks in body . .Visual 01004 4.2.2.2 Bag assembly (see dwg. 8861111 covering a detail of dwg. 8861113). Me

21、lhori of rjrrls hr.T/JCf /ifJi COd? .YO. 104. Incorrect quantity of dem- 106. Envelope impropei*ly as- 106. Cord untied or iniprop- olition blocks . Visual 07004 sembled in bag . .Visual O7005 erly tied . .Visual 07006 Minor: None defined. 4.2.2.5 Charge assembly, demolition, M37 for block, demoliti

22、on M581, assembly (see dwg. 8861107). Method oj Calegories rJ1 If.cis inlJaci;on Code No. Critical: Nolie defined. Major: AQL 0.40 percent 101. Priming assembly 102. Demolition block bag as- 103. Tight coils or kinks in Minor: AQL 4.0 percent missing . .Visual 08001 sembly missiiig Visual 08002 prii

23、ning assembly .Visual 08003 201. Marking missing, incom- plete, improper or unidentifiable Visual 08004 202. Cut, puncture or tear. . .Visual 08005 204. Strap improperly tied . .Visual 08007 203. Trace assembled improperly .Visual 08006 205. Components loose in carrying case . .Visual- Manual 08008

24、missing . .Visual 08009 01 improper . .Visual 08010 manship (see 3.3). Visual 08011 206. Loaders lot number 207. Date of loading missing 208. Evidence of poor work- 4.2.2.9 Box, packing (see dwg. 8883618). Mefliorl of Cflirgores Ik/rcls insfieriion Code No. Critical : None defined. Major: AQL 0.40 p

25、ercent 101. Incorrect number of 102. Assembly or component 103. Assembly or component AQL 0.40 percent assemblies Visual O9001 improperly inserted . .Visual 09002 improper type . .Visual 09003 Minor : 201. Filler missing or im- properly assembled . .Visual 09004 4.2.2.10 Box, - packing, marking, clo

26、sing, sealing and strapping (see dwgs. 8796522 and 8883618). a _._ _-_- . ,. , . -y . .-i.-. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ti MIGC-60032 (MU) Method of Cairgorics I)ccrLr imfiecion Code No. Critical: None definecl. Major: AQL 0.65 p

27、ercent 101. I.C.C. niarking missing, incorrect, improper or illegible . .Visual 10001 missing, incorrect, im- proper or illegible. .Visual 10002 103. Strapping improper. .Visual 1000 104. Car sed, missing or im- properly positioned or sealed .Visual 10004 is tilted . .Visual- Manual 10005 100. Board

28、, broken 01 split , .Visual 10006 101. Box damaged, SO that its contents are exposed or liable to become 102. Descriptive nomenclature 105. Contents loose when box exposed . .Visual 10007 Minor: None defined. 42.3 Impecton s CDCF -Contractors design responsi- bility on contractor format. OD -Ordnanc

29、e design. ODMU -Ordnance design, mandatory for use. CE -Commercial equipment. SCD -Specification Control Drawing. 6.3.3. Ordnnncc. dessicas. Ordnance designs are reflected on detailed drawings which com- pletely depict ai the information necessary for the fabrication of the item of inspection equipm

30、ent. The contractor need provide n design when an Ordnance design is listed for an item of inspection equipment. Ordnance designs fall into two basic classifications ; mandatory and nonmandatory. When an in- specian Equipment List references manda- tory Ordnance designs, the contractor shall comply

31、with, and use these designs accord- ingly. The contractor may, however, in con- nection with nonmandatory designs and with the approval of the Government, design al- ternate inspection equipment or use com- parable commercial equipment to facilitate his operations. Such contractor prepared de- signs

32、 or comercial equipment selections must be approved by the Government prior to fab- rication or pracuring of the equipment. De- Sims shall be submitted for approval as specified in 6.3.7. ORDM-608-12. 6.3.4 Spe&flioatm control druzuirLgs. Sp&L fication control drawings depict the minimum equipment r

33、equirements in outlke, de- 6 scriptive, diagrammatic, or pictorial form only and specify the required performance or other characteristics. Contractors must pre- pare detailed drawings (see 6.3.6) of their designs in support of specification control drawings. These contractor prepared designs must b

34、e approved by the Government prior io the fabricatioli. or procUring of the equip ment. Cornmercial equipment meeting the re- quirements of specification control drawings may he approved if described in sufficient detail to permit identification and evaluation by the Government. Designs shall be sub

35、- mitted for approval as specified in 6.3.7. 6.3.5 Comnercial eqcipntewt. Commercial equipment is inspection equipment that has universal application for a specific function. It is comprised of items commonly used by industry and government. Contractors are not required to furnish drawings of commer

36、- cial inspection equipment but a list of such equipment must be approved by the Govern- ment. Lists shall be submitted for approval to the inspection element of the agency ad- ministering the contract. 6.3.6 Con.tyactor dcsigm. Contractor de- signs are designs of inspection equipment for which the

37、Government has assigned design responsibility to the contractor. Contractor designs shall be supported by detailed draw- ings which depict all information necessary ta completely fabricate, calibrate and operate an item of inspection equipment. This re- quires that the necessary views, dimensions, m

38、aterials, finish, notes, operating and cali- bration instructions be properly depicted in accordance with approved practices to the extent that further calculation or clarifica- tion w3l not be required. Contractor designs identified as CDCF may be developed on the format the contractor normally emp

39、loys iii his equipment design procedure provided such format reflects the detail and informa- tion specified above. Contractor designs identified as CDOF shall comply with the for- mat and requirements of ORDM 608-12, and, in addition, contain the detail and informa- tion specified above. 6.3.7 Sbmi

40、ssion of contractoy designs. . -. i y Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-60032 13 a 7777906 0335044 L - MIGC-60032 (MU) Desigiis shall be submitted for approval to the Commanding Officer, Picatinny Arsenal, ATTN :- SMVPA-ND. Design

41、 review will normally be accomplished within one month after receipt by Picatinny Arsenal. Partial Custodian: Army-MU submission of inspection equipment designs is permissible and encouraged. However, the Arsenal completion date for design review wi!l be based on the date of the final submis- sion of designs. Preparing activity: -4rms-MU Project No. 135-AT03 - _I- . 7 W Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1