ARMY MIL-C-71155 (3)-1996 CARTRIDGE IGNITION M987 LOADING ASSEMBLING AND PACKING《M987点火炮弹的装载 组装及包装》.pdf

上传人:wealthynice100 文档编号:442268 上传时间:2018-11-15 格式:PDF 页数:7 大小:211.76KB
下载 相关 举报
ARMY MIL-C-71155 (3)-1996 CARTRIDGE IGNITION M987 LOADING ASSEMBLING AND PACKING《M987点火炮弹的装载 组装及包装》.pdf_第1页
第1页 / 共7页
ARMY MIL-C-71155 (3)-1996 CARTRIDGE IGNITION M987 LOADING ASSEMBLING AND PACKING《M987点火炮弹的装载 组装及包装》.pdf_第2页
第2页 / 共7页
ARMY MIL-C-71155 (3)-1996 CARTRIDGE IGNITION M987 LOADING ASSEMBLING AND PACKING《M987点火炮弹的装载 组装及包装》.pdf_第3页
第3页 / 共7页
ARMY MIL-C-71155 (3)-1996 CARTRIDGE IGNITION M987 LOADING ASSEMBLING AND PACKING《M987点火炮弹的装载 组装及包装》.pdf_第4页
第4页 / 共7页
ARMY MIL-C-71155 (3)-1996 CARTRIDGE IGNITION M987 LOADING ASSEMBLING AND PACKING《M987点火炮弹的装载 组装及包装》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 MIL-C-71155 (3) 99999Ob 2020339 98b = INCH-POUND MIL-(2-71155 (AR) AMENDMENT 3 31 Julv 1996 SUPERCEDING AMENDMENT 2 05 December 1995 MILITARY, SPECIFICATION CARTRIDGE, IGNITION, M987 LOADING, ASSEMBLING AND PACKING This amendment forms a part of MIL-C-71155 (AR), dated O1 November 1993, and is appr

2、oved for use by the U.S. Army Armament Research, Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 Delete: “INSPECTION EQUIPMENT DRAWINGS 9278622 - Envelope Drawing for Leak Testing of Ignition Cartridges“. PAGE 3 3.4.1,

3、 line 2: Delete: 8.85“ and substitute: “1.00“. 3.4.2, at end of sentence: Delete: “4.5.2.2“ and substitute: “4.5.2.1“. 3.5: Delete in its entirety. PAGE 7 TABLE I: Delete: “Static pressure (b) . 25 . 3.8 . 4.5.7“. 1 of 7 AMSC N/A FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distri

4、bution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-C-7LL55 (31 D 99999b 2020340 bTB MIL-C-71155 (AR) AMENDMENT 3 PAGE 8 TABLE I, under Shell, Shotgun, Primed, 12 Gauge-Assy.: Delete : “Sensitivity test . . . 20 (a) . . . 3.4.1/

5、3.4.2 . . . 4.5.2“ and substitute: “Sensitivity test . . . 700 (a) . . . 3.4.1/3.4.2 . . . 4.5.2“. Delete: “Cartridge, Ignition, M986 (prior to addition of powder) and substitute: “Cartridge, Ignition, M987 (prior to addition of powder) l. Delete “Leak test . 50 (b) . 3.5 . 4.5.3“. On the line “Velo

6、city, functioning and security“ : Delete: 114.5.311 and substitute: “4.5.5“. NOTES: Delete Note (a) in its entirety and substitute: “(a) Primers for the first article and be from the intended first production lot and thereby negating the necessity of testing the primers from that production lot.“ PA

7、GE 12 4.4.2.1, Critical 1: Delete in its entirety. Add Major 105 as follows: “105 Sensitivity non-function . . . (a) . . . 3.4.1 . . . Test/4.5.SV1. PAGE 14 4.4.2.3, Major 104: Delete in its entirety. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,

8、-MIL-C-7LL55 (3) 9Ob 2020L4L 534 MIL-C-71155 (AR) AMENDMENT 3 PAGE 16 4.4.3 -2.1: Delete in its entirety and substitute: “4.4.3.2.1 Se nsitivity test . Beginning with the first article (primers for the first article can be from the intended first production lot, thereby negating the necessity of tes

9、ting the primers from the first production lot), and from the first production lot produced, and continuing until three (3) consecutive lots have complied with 3.4.1 and 3.4.2, a sample of 700 primers shall be selected and be subjected to this test. If the sum of the average critical height (H avera

10、ge) and five (5) times the standard deviation(s) multiplied by the weight of the ball exceeds the maximum requirement, or if the sum of the average critical height (H average) less two (2) times the standard deviation(s) multiplied by the weight of the ball exceeds the minimum requirement, the inspe

11、ction lot shall be rejected. I 4.4.3.2.1.1: Delete in its entirety. PAGE 17 4.4.3.2.2: Delete in its entirety. 4.4.3.2.2.1: Delete in its entirety. PAGE 18 4.4.3.5: Delete in its entirety. PAGE 19 4.5.2.1: Delete in its entirety and substitute: “4.5.2.1 Se nsitivity test . The sample of 700 primers

12、shall be divided into 14 groups of 50 primers each and tested in the following manner: 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-71155 (3) = 999990b 2020142 470 MIL-C-71155 (AR) AMENDMENT 3 PAGE 19 (cont) The first group (50) of primers

13、 shall be tested by dropping a steel ball 15/16 inch in diameter and weighing 1.94 2 .OZ ounces on the firing pin of the test fixture from a height of nine (9) inches. (The height of drop shall be measured as the height from the top of the firing pin to the bottom of the ball.) The primers that fire

14、, misfire, hangfire, or squib shall be recorded. This procedure shall be repeated at successively increasing heights of one (1) inch, using a new group of 50 primers at each different height, until a height is reached at which all primers in the group being tested fire. The test fixture shall then b

15、e set to a height of eight (8) inches and the above procedure repeated at successively decreasing heights of one (1) inch, using a new group of 50 primers at each different height, until a height is reached at which all primers in the group being tested fail to fire. Acceptance or rejection of the l

16、ot shall be determined from calculations based on recorded data. The recorded test data shall be used in the calculation of “H average“ and s“ as follows: H average = A plus B plus C S = I times the square root of L minus M where : A = the sum of Column 3. B = the first drop height at which all elem

17、ents misfired. C = one-half the drop height decrement (absolute value). M = the square of the sum of Column 3. I = the drop height decrement (absolute value). 4.5.2.1.1: Tabulation of data. Divide a sheet of paper into columns and tabulate the data as follows: a. Title Column 1 “Height of Drop“ and

18、list all drop heights in consecutive order starting with the lowest height. DO NOT list the heights at which all elements fired or misfired. b. Title Column 2 “Number of Failures“ and list the sum of the number of elements that misfired, squibbed or hangfired at each intermediate height. 4 Provided

19、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-71155 (3) I Ob 2020143 307 9 C. d. e. MIL-C-71155 (AR) AMENDMENT 3 PAGE 19 (cont) Title Column 3 “Decimal Fraction of Elements Failing to Fire at Each Intermediate Height“ and record the decimal fraction

20、that failed to fire at each intermediate height. This number is obtained by dividing the value obtained under “Number of Failures“ by the number of elements tested at that height. Calculations shall be carried out and recorded to the nearest one-hundredth (. 01) . Title Column 4 “Standard Deviation

21、Factor“ and list odd numerals in sequence, starting with 1, for as many drop heights that are listed in Column 1. Title Column 5 “Standard Deviation Factor Times Fraction of Failures“ and, by multiplying each decimal fraction in Column 3 by the number on the same line in Column 4, enter the product

22、on the corresponding line in Column 5. 4.5.2.1.2 Procedu res for solving equ ations. The procedures for solving the equations are as follows: a. b. C. d. e. f. g* h. To obtain “A“: Add the values in Column 3 and substitute the sum for “A“. To obtain “B“. . The first drop height at which all elements

23、 failed to fire and substitute the product for “Bl. To obtain “C“: Divide the drop height increment by 2 and substitute the dividend for IC“. To obtain “L“: Add the values in Column 5 and substitute the sum for “L“. To obtain IM“: Square substitute the sum for To obtain “H average“: B, and C. the va

24、lues in Column 3 and 11 MtI Add the values substituted for A, To obtain Subtract the value substituted for “MI from the value substituted for “L“ and the obtain the square root of the difference and then multiply the square root by the height of the increment. Using the calculated values for “H aver

25、age“ and “s“, if “H average“ plus 5 rrll multiplied by the maximum weight of the ball is equal to or less than the maximum inch ounce energy required, and “H average“ minus 2 “SI multiplied by the minimum weight of the ball is equal to or greater than the minimum energy value required, the lot is co

26、nsidered acceptable for sensitivity. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-7LL55 (3) = 0b 2020344 243 , MIL-C-71155 (AR) AMENDMENT 3 PAGE 19 (cont) 4.5.2.1.3 Definitions. The following definitions apply to the non-function test. a.

27、Inch ounces: The drop height in inches multiplied by the weight of the ball in ounces. b. Failure: The following modes apply: (1) Misfire: A failure wherein initiation of the primer mixture does not occur. (2) Squib: A failure wherein a burning of the primer mixture occurs without detonation. (3) Ha

28、ngfire: A failure wherein an audible delay occurs between the instant application of energy and the detonation report. I 4.5.2.2: Delete in its entirety. 4.5.3: Delete in its entirety. PAGE 20 4.5.5 a.: Delete the last sentence and substitute: “The cartridges shall be fired at charge 3.“ * 4.5.5, pa

29、ragraph b. Delete the last line in its entirety. PAGE 21 * 4.5.6.2: Delete the last line in its entirety and substitute: “The means and standard deviations of the velocities at all firing temperatures shall be calculated using corrected data.“ PAGE 22 4.5.7: Delete in its entirety. PAGE 25 Figure 1:

30、 Delete in its entirety. PAGE 26 Figure 2: Delete in its entirety. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-71155 (3 1 E 9999906 2020245 18T MIL-C-71155 (AR) AMENDMENT 3 The margins of this amendment are marked with an asterisk, or ve

31、rtical line to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to eva

32、luate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR Preparing activity: Army-AR (Project 1315-0135) 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1