ARMY MIL-D-46260 A-1964 DETONATOR STAB M63 PARTS FOR《 M63型针刺雷管零件》.pdf

上传人:proposalcash356 文档编号:442400 上传时间:2018-11-15 格式:PDF 页数:10 大小:467.34KB
下载 相关 举报
ARMY MIL-D-46260 A-1964 DETONATOR STAB M63 PARTS FOR《 M63型针刺雷管零件》.pdf_第1页
第1页 / 共10页
ARMY MIL-D-46260 A-1964 DETONATOR STAB M63 PARTS FOR《 M63型针刺雷管零件》.pdf_第2页
第2页 / 共10页
ARMY MIL-D-46260 A-1964 DETONATOR STAB M63 PARTS FOR《 M63型针刺雷管零件》.pdf_第3页
第3页 / 共10页
ARMY MIL-D-46260 A-1964 DETONATOR STAB M63 PARTS FOR《 M63型针刺雷管零件》.pdf_第4页
第4页 / 共10页
ARMY MIL-D-46260 A-1964 DETONATOR STAB M63 PARTS FOR《 M63型针刺雷管零件》.pdf_第5页
第5页 / 共10页
亲,该文档总共10页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-D-462bOA 23 W 7777706 0320495 m -=- - MIL-D-46260A (MU) 17 August 1964 SUPERSEDING MIL-D-46260 ( Wd) 17 August 1960 MILITARY SPECIFICATION DETONATOR, STAB, T33E1 FARTS FOR 1. SCOPE 1.1 This specification covers the parts for one type of 2. APPLICABLE DOCUMENTS stab detonator designated as Detona

2、tor, Stab, T33E1. 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 Specification for MIL-F-10025 - Packaging, Packing and Marking for Interpla

3、nt, Shipment of Inert Anniunition Components, General Specification for MIX-1-45208 - Inspection Requirements, General Specification for MIL-1-45607 - Inspection Equipment, Supply and Maintenance of - Ammunition and Special Weapons; General STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-1235 - S

4、ingle and Multilevel Continuous - Sampling Procedures and Tables for Ifispection by Attribute8 (ABC-STD-105) - Quality Assurance Terms and Definitions Sampling Procedures and Tables for Inspection by Attributes I FSC 1375 I 7 Provided by IHSNot for ResaleNo reproduction or networking permitted witho

5、ut license from IHS-,-,-2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46260A (MU) 4.1.1 Contractor quality assurance system.-The contractor shall provide and maintain an effective quality assurance system in compliance with the requirements

6、 of Specification MIL-1-45208. The contractors quality assurance system shall contain a procedure for the reporting of critical defectives found during the course of his inspection and during inspection by the Government. critical defect encountered, unless annotated by an asterisk (*) to the right

7、of the characteristic code number (see 6.2), wilE be reported within 48 hours. critical defects annotated by an asterisk will be furniqhed, The agencies to whom the reports will be furnished are identified in paragraph 6.5. The reports shall contain, as a minimum, the following information. Any A mo

8、nthiy smary report; covering those a. Contractor and contract number. b. Number and revision date of specification. c. Characteristic code number. d. Lot or serial number. e. Number of defectives found. f, g. Corrective action taken or recommended. men the Assignable cause or analysis of occurrence.

9、 oorrecEve action is beyond the control of the contractor or the scope of the contract, the report shall contain the contractors recommendation to the Governme.nt . Submission of product.-At the time the completed lot of product is submitted to the Government for acceptance the con- tractor shall su

10、pply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: assurance provisions of the approved current written description of the system. 4.1.2 a, A statement that the lot complies with all qualit

11、y b, Number of units of product inspected. c. Results obtained for all inspection performed. d. Drawing, specification number and date, together with an identification and date of changes. e. Certificates of compliance on all material purchased by the contractor when such material is controlled by G

12、overnment specifications referenced in any of the contractual documents. f. Number of items in the lot. g. Date submitted. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46260A (MU) The certificate shall be signed by a responsible agent of t

13、he certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization

14、. 4.1.3 Quality assurance procedure, this detail specification, the appli- cable drawings and other contractual documents as a guide, the Government inspector shall verify at unscheduled intervals all quality assurance operations performed by the contractor. Verifi- cation will be In accordance with

15、 Specification MIL-1-45208 and will be performed to the extent necessary to assure compliance with the contractual requirements. Severity of Government n- spection of individual characteristics will be directly related to the seriousness of the classification assigned. In no instance wfll a characte

16、ristic classified “critical“ beaccepted solely on the basis of the contractors records. Substantiation of the agents authority will not Government verification.-Using the contrators written 4.2 Initial production inspection. 4.2.1 Submission.-Prior to the start of regular production, the contractor

17、shall submit an initial production sample to a Government approved facility as designated by the Contracting Officer (see 6.4) for evaluation in accordance with thepmvisions of 4.2.2. The initial production sample shall consist of 50 complete sets of parts which have been produced by the contractor

18、or furnished by a supplier and whioh has been manufactured using the same product- ion processes, procedures and equipment which will be used in fulfill- ing the contract. All parts and materials, including packaging and packing, shall be obtained from the same sources of supply as will be used in r

19、egular production. The sample shall be accompanied by certificates of analysis for materials. An initial production sample, or portion thereof, as directed by the Contracting Officer, shall also be submitted whenever there is a lapse in production foi. a period in excesa of 90 days, or whenever a ch

20、ange occurs in manufacturing process, material used, drawing, specification or source of supply as to significantly affect product uniformity 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46260A (MU) as determined by the Government. Prior t

21、o submission, the con- tractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this inspection with the sample. A sample containing known defects will not be submitted unless specifically authorized by the Contrac

22、ting Officer. 3ecte by the Government to any or all of the examinations specified in this specification and any or all requirements of the applicable drawings any or all of the applicable requirements, the initial production sample shall be rejected. The Government reserves the right to terminate It

23、s inspection upon any failure of a component in the sample to comply with any orall of the stated requirements. the event of rejection, the Qovernment reserves the right to require the contractor to take corrective action and submlt a new initial production sample or portion thereof. production samp

24、le is accepted, the contractor is, in no way, authorized by the Government to initiate regular production unless otherwise directed by the Contracting Officer. 4.2.2 Inspections to be performed.-Components will be sub- 4.2.3 Rejection.-If any component fails to comply with In Until an initial 4.3 In

25、spection provlsions 4.3.1 Lot formation.-A lot shall coneist of parts produced by one manufacturer In one unchanged process, in accordance with the same drawing, same drawing revision, same specification, and same specification revision. Drawing, specification and process changes not affecting safet

26、y, performance, or fit, as determined by the Government, shall not necessitate changing the lot interfix number. Lots shall be submitted for inspection in accordance with Standard MIL-STD-105 (or Standard MIL-STD-1235 when applicable). 4.3.2 Examination.-Sampling plana and procedures for the followi

27、ng classifications of defects shall be in accordance with Standard MIL-STD-105 except that inspection for critical defects, when listed, shall be 100 percent. Continuous sampling plans in accordance with Standard ML-STD-1235 may be used if approved by the procuring activity. Also, at the option of t

28、he procuring activity, AWs and sampling plans may be applied to the individual 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46260A (MU) characteristics listed using- an AQL of 0.40 percent for each major defect and an AQJ, of 0.65 percent

29、for each minor defect. Equipment necessary for the performance of the)inspections listed shall be in accordance with 4.3.3. 4.3.2.1 Disc, detonator, closing and disk, detonator (see dwgs. 8798409 and 8798754). Categories Defects Critical: None defined. Method of Inspection Major: AC. The contractor

30、shall design inspection equipment 4.3.3.1 Government rights to documentation.-Inspection 4.3.3.2 Supply and maintenance.-Supply and maintenance of 4.3.3.3 Peraonnel for operating the 5. PREPARATION FOR mIVEZY 5.1 Packing. 5.1.1 Level C.-Packing and markInion equipment list codea.-The inspection equi

31、pment accordance with MIL-D-45608. format. 6.3.3 Army designs.-Atimy designs are reflected on detailed drawings which completely depict all the informatlon necessary for the fabrication of the Item of inspection equipment. need prsv%.de 80 design when an Amy design is lsted for an item The contracto

32、r 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46260A (MU) of inspection equipment. Army designs fall into two basic classifications, mandatory and non-mandatory. When an inspection equipment list references mandatory Army designs, the con

33、tractor shall comply with, and us8 these designs accordingly. The contractor may, however, in connection with non-mandatory designs and with the approval of the Ctovernment, design alternate inspection equipment or use comparable commercial equipment to facilitate his operations. Such contractor pre

34、pared designs or comercial equip- ment selections must be approved by the Government prior to fabrication or procuring of the equipment. mitted for approval as specified in 6.3.7. drawings depict the minimum equipment requirements in outline, descriptive, diagramatic or pictorial form only and speci

35、fy the required performance or other characteristics. prepare detailed drawings (see 6.3.6) of their designs in support of specification control draMin;s. designs must be approved by the Government prior to the fabrication or procuring of the equipment. requirements of specification control drawings

36、 may be approved if described in sufficient detail to permit identification and evaluation by the Government. ,Designs shall be submitted for approval as specified in 6.3.7. equipment that has universal application for a specific function. It is comprised of Items comonly used by industry and Govern

37、ment. Contractors are not required to furnish drawings of commercial inspection equipment, but a list of such equipment must be approved by the Government. Lists shall be submitted for approval to the inspection element of the agency administering the contract. 6.3.6 Contractor designs,-Contractor d

38、esigns are designs of inspection equipnent for which the Government has assigned design responsibility to the contractor. Contractor designs shall be supported by detailed drawings which depict all Information necessary to completely fabricate, calibrate and operate an item of inspection equipment.

39、This requires that the necessary views, dimensions, materials, finish, notes, operating and calibration Instructions be properly depicted In accordanee with approved practices to the extent that further calculation or clarification will not be required. Contractor designs identif ed a8 CDCF may be d

40、eveloped on the format the contractor normally employs in his equipment Designs shall be sub- 6.3.4 Specification control drawing.-Specification control Contractors must These contractor prepared Commercial equipment meeting the 6.3.5 Commercial equipnent.-Commercial equipment is inspection 9 Provid

41、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46260A (MU) design procedure provided such format reflects the diitail and information specified above. Contractor design8 identified a6 CDAF shall comply with the format and reguirementil of Ma-D-45608

42、, ancl In addition, contain the detail and information specified above. 6.3.7 Submission of contractor design?s.-Designs shall be submitted for approval to the Commanding Officer, Picatinny Arsenal, A“N: SMUPA-ND. Design review will nomnlly be accomplished within one month after receipt by Picatinny

43、 Arsenal. of inspection equipment designs le permissible and encouraged. However, the Arsenal completioti date for design review will be based on the date of the final submlesion of signs. 6.4 Submisslon of Initial Production, Pre-Production or Qualiflcation Samples.-Instructions, as to the location

44、 for the evaluation of Initial Production, Be-production, or product qualification shall be obtained from the contracting officer, receipt of such request, the contracting officer shall advise Picatinny Arsenal and instructions will be issued accordingly. inquirles should be forwarded to: Commanding

45、 Officer, Picatinni Arsenal, ATTN: SMPA-NI, Munitions Command procurements, one copy of each critical defect report will be furnished the cognizant Government inspection agency; SMAP-RO; Picatinny Arsenal, ATTN: SMUPA-M). Munitions Command procurements, critical defect reporting shall be as prescrib

46、ed by the Contracting Officer. Partial submission Upon All 6.5 Submission of critical defect reports.-For U. S. Army the Army Ammunltlon Procurement and Supply Agency, ATTN: 6.5.1 Reporting to other servicea.-Por other than U, S. Army Custodian: Army-MCI 10 Preparing activity: Project No. 1375-A772 Arrny-MU Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1