ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf

上传人:吴艺期 文档编号:444294 上传时间:2018-11-15 格式:PDF 页数:11 大小:476.40KB
下载 相关 举报
ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf_第1页
第1页 / 共11页
ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf_第2页
第2页 / 共11页
ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf_第3页
第3页 / 共11页
ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf_第4页
第4页 / 共11页
ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf_第5页
第5页 / 共11页
亲,该文档总共11页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 MIL-DTL-4448LA - 9999906 2OL79Lb O79 INCH-POUND MIL-DTL-44481A 15 MAY 1996 SUPERSEDING MIL-R-44481 18 July 1994 DETAIL SPECIFICATION RELEASE, CARGO PARACHUTE, AIRDROP, M-3 This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 ScoDe. This d

2、ocument covers one type of cargo parachute release assembly consisting of a release mechanism, upper and lower suspension link assemblies, parachute connector assemblies and a timer assembly. The parachute connector assembly, timer assembly and rope spool assembly may be procured separately (see 6.4

3、). Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be used in improving this document should be addressed to: U.S. Army Natick Research, Development, Engineering Center, Attn: SSCNC-UTE, Natick, MA 01760-5017 by using the Standardization Document Improvem

4、ent Proposal (DD form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1670 DISTRIBUTION STATEMENT. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-DTL-44481 2. APPLI

5、CABLE DOCUMENTS 2.1. General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or examples. While every effort has been made to

6、 ensure the completeness of this list, document users are cautioned that they must meet all specified requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Other Government documents, drawinss, and mblications. The fol

7、lowing other Government documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS U.S ARMY NATICK RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 11-1-3220 - Release Assembly, Ca

8、rgo, Parachute, Airdrop, M-3 11-1-3230 - Spool Assembly, Rope 11-1-3236 - Toggle 11-1-3240 - Connector Assembly, Parachute 11-1-3246 - Housing, Front and Rear (Casting) 11-1-3250 - Timer Assembly, Parachute (Copies of drawings are available from the U.S.Army Natick Research, Development and Engineer

9、ing Center, ATTN: SSCNC-IMD, Natick,MA 01760-5017). 2.3 Non-Government rmblications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted are those listed in the issue of the DODISS cited in

10、 the . solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents cited in the solicitation (see 6.3). 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-44481A 9999906 2017918 94

11、1 MIL-DTL-44481 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ANSI B46.1 - Surface Texture (Surface roughness, Waviness, and Lay 1 (Applications for copies should be addressed to the American National Standards Institute, Inc. 11 West 42nd Street, New York, NY 10036.) AMERICAN SOCIETY FOR TESTING AND

12、 MATERIALS (ASTM) ASTM E 1444 Standard Practice for Magnetic Particle Examination (Applications for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103-1187.) (Non-Government standards and other publications are normally available fr

13、om organizations that prepare or distribute the documents. These documents also may be available in or through libraries or other informational services.) 2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document

14、takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see 4.1) in accordance with 4.2. .3.2 M

15、aterial. The contractor shall select the material, but the material shall be capable of meeting all of the operational and environmental requirements specified herein. The material specified on Drawing 11-1-3220, and all subsidiary drawings and parts lists pertaining thereto, is recommended, but is

16、not mandatory. 3.3 Construction and supplementary process. The construction and supplementary process used in tha manufacture of the cargo parachute releases shall conform to the requirements specified or shown on drawing 11-1-3220, and all subsidiary drawings and parts lists pertaining thereto, and

17、 as specified herein. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-DTL-44481A 9999906 2017919 488 MIL-DTL-44481 3.4 Surface finish. American National Standards Institute (ANSI) Standard No. B46.1, shall apply for the interpretation of surfa

18、ce roughness values specified on the applicable drawings. 3.5 Performance. 3.5.1 Carso parachute connector ziroofload. The cargo parachute connector shall show no visual evidence of failure (such as a fracture or permanent deformation) when subjected to a tensile proofload of 45,000 pounds for 15 se

19、conds when tested as described in 4.12.3. 3.5.2 Release assemblv ziroofload. The release assembly shall show no visual evidence of failure (such as a fracture or permanent deformation) when subjected to a tensile proofload of 135,000 pounds for 15 seconds when tested as described in 4.11.4. 3.5.3 Re

20、lease assemblv unlockinq. At completion of the timer unwinding cycle, the timer shall retract the toggle lock slides to the unlocked position with no evidence of interference when tested as specified in 4.11.4. 3-5.4 Release assembly, functional. The release assembly shall show no evidence of interf

21、erence when subjected to the no load testing as specified in 4.11.5. 3.5.5 Delav timins cycle. The delay timing cycle shall be 25 seconds,plus or minus 3 seconds, from start to completion. There shall be no evidence of interference in retracting the toggle lock slides to the unlocked position after

22、completion of the unwinding cycle when tested as specified in 4.11.1. 3.5.6 Delav timer retraction arms. When functionally tested as specified in 4.11.2, the retraction arms shall rotate through an angle of 23 degrees during the timing cycle. At completion of the timing cycle, the arms shall retract

23、 to the unwound position, tangent to the timer housing surface. Suggested reference drawing 11-1-3250 indicates the position and tolerances of the retraction arms movement. 3.5.7 Government furnished DroDertv. The following items, when required for proofload testing of the release assembly, separate

24、ly procured cargo parachute connectors or timer assemblies, may be obtained from the procuring activity on a loan basis (see 6.3). Release, Cargo Parachute, Airdrop, M-3; Part No, 11-1-3220-1 Timer Assembly; Part No. 11-1-3250-1 4 Provided by IHSNot for ResaleNo reproduction or networking permitted

25、without license from IHS-,-,-MIL-DTL-44483A 999990b 2037920 5TT MIL-DTL-44481 3.5.8 Identification markinq. Identification marking shall be in accordance with the legends and locations as shown on the referenced drawings. 4. VERIFICATION 4.1 Classification of insDections. The inspection requirements

26、 specified herein are classified as follows: a. First article inspection (see 4.2). 4.2 First article inspection. First article inspection shall be performed on one complete release assembly if a first article sample is required (see 3.1). This inspection Shall include the examinations of 4.3. 4.3 E

27、xamination. Each release assembly shall be examined for compliance with the requirements specified in 3.2 through 3.5. This element of inspection shall encompass all visual examinations (4.9) and dimensional measurements (4.10) and the tests of (4.11). Noncompliance with any specified requirements o

28、r presence of one or more defects preventing or lessening maximum efficiency shall constitute cause for rejection of the lot. 4.4 End item visual examination. The end items shall be examined for the defects listed in Table I. Noncompliance with any specified requirements or presence of one or more d

29、efects preventing or lessening maximum efficiency shall constitute cause for rejection of the lot. 4.5 Components and material inspection. In accordance with 4.x, components and materials shall be inspected in accordance with all the requirements of referenced documents unless otherwise excluded, am

30、ended, modified or qualified in this specification or applicable purchase document. 4.6 In-process inspection. Inspection of subassemblies shall be made to ascertain that construction details which cannot be examined in the finished product are in accordance with specified requirements. Whenever non

31、conformance is noted, correction shall be made to affected items and process. Items that cannot be corrected shall be removed from the process. The Government reserves the right to exclude from consideration for acceptance, any material or service for which in-process inspection has indicated noncon

32、formance. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-+44LA 7999906 2017921 436 1 MIL-DTL-44481 4.6.1 In-wocess dimensional examination. Prior to assembly, but after heat treatment and application of protective finish, the toggle and th

33、e front and rear housing shall be examined for conformance to the dimensions indicated on their respective drawings. The finding of any defect shall be cause for the rejection of the lot. 4.7 Heat treatment inspection and hardness tests. Heat treated parts shall be inspected to determine compliance

34、with requirements specified on the applicable drawings. The finding of any defect shall be cause for rejection of the lot. 4.8 Masnetic particle inspection. Each release assembly shall be inspected as specified in accordance with ASTM E 1444 for determination of compliance with applicable drawing re

35、quirements. 4.9 End item visual examination. The end items, defined as completely fabricated units of the Release Assembly being purchased, shall be examined for the defects listed in table I. The lot size shall be expressed in units of Release Assemblies. The sample unit shall be one release assemb

36、ly. The finding of any defect shall be cause for the rejection of the lot. TABLE I. End item visual defects Classification Examine Defect Major Minor Finish Omitted or not type specified 101 Coating powdery, coarse grained, mottled, not adherent, evidence of corrosion 102 Supplementary treatment omi

37、tted, not type specified, tacky 103 Color not as specified Dirt, oil, grease or other foreign matter Design Any departure from design specified 201 202 104 Construction and Surface roughness.value in workmanship excess of rating specified on drawing 105 Any component missing, damaged or misaligned 1

38、06 Sharp edges, burrs or metal 107 s 1 iver s 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-DTL-44481A m 9999906 2017922 372 W MIL-DTL-44481 TABLE I. End item visual defects (contd) Classification Examine Defect Major Minor Construction and

39、Components incorrectly assembled 108 workmanship Components loose 109 Movement of parts inhibited 110 Threaded section damaged 111 Identification Missing, incomplete, illegible improper location, or not as specified 203 4.10 End item dimensional inspection. The end item shall be examined for conform

40、ance to the dimensions specified on the drawings. Only those dimensions that can be evaluated without damaging or disassembling the end item shall be examined. Any dimensions not within the specified tolerance shall be classified as a defect. The sample unit shall be one release assembly. The findin

41、g of any defect shall be cause for rejection of the lot. 4.11 End item testinq. 4.11.1 Release assemblv and connector. Cargo parachute connectors and release assemblies (proofload, unlocking and functional) shall be tested as specified in 4.11.3, 4.11.4, and 4.11.5 for compliance with the requiremen

42、ts of 3.5.2, 3.5.3, 3.5.4, respectively. The lot size shall be no more than 50 completely assembled cargo parachute connectors or complete release assemblies. The sample unit shall be one completely assembled cargo parachute connector or complete release assembly. Cargo parachute connectors showing

43、any visual evidence of failure (fracture or permanent deformation) shall be cause for rejection of the lot. Release assemblies showing any visual evidence of failure (fracture or permanent deformation) of any component of the release assembly, exclusive of the cargo parachute connectors and time del

44、ay assembly, or failure of the time delay assembly to retract the toggle lock slides freely and without interference to the unlocked position shall be cause for rejection of the lot. 4.11.2 Timer. The timer shall be tested as specified in 4.11.7 and 4.11.8 for compliance with the requirements of 3.5

45、.5 and 3.5.6 respectively. The lot size shall be expressed in units of timers. The finding of any defect shall be cause for rejection of the lot. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-DTL-4448LA 9979906 2037923 209 MIL-DTL-44481 4.11

46、.3 Caruo Darachute connector Droofload testinq. The cargo parachute connector to be tested shall be installed in a contractor test fixture. The test fixture shall be attached to a direct reading device capable of imposing a 45,000 pound tensile force on the fixture and test item. A proofload of 45,0

47、00 pounds shall be applied to the connector at a rate of not less than 3,000 pounds/second nor greater than 6,000 pounds/second. The connector shall withstand the tensile load for 15 seconds after which the load shall be reduced to zero. The proofload of 45,000 pounds shall be immediately re-applied

48、, held for 15 seconds, and again reduced to zero. 4.11.4 Release assemblv woofload and unlockina testinq. The release assembly shal.1 be assembled with seven cargo parachute connectors and with a timer delay assembly (GFP,see 6.3), installed in the locked position. The locked position requires turni

49、ng the timer stem approximately 90 degrees clockwise to engage the toggle lock slides with the toggle,inserting the arming wire through the hole in the timer stem. Rectangular holes are provided in the side plates of the release to ensure alignment of the toggles and toggle lock slides before turning the timer stem. The complete assembly shall then be mounted in a contractor furnished test fixture. The test fixture shall be attached to a c

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1