ARMY MIL-H-48398-1974 HOLDER BLASTING CAP M8《M8型雷管夹持器》.pdf

上传人:confusegate185 文档编号:445083 上传时间:2018-11-16 格式:PDF 页数:6 大小:204.91KB
下载 相关 举报
ARMY MIL-H-48398-1974 HOLDER BLASTING CAP M8《M8型雷管夹持器》.pdf_第1页
第1页 / 共6页
ARMY MIL-H-48398-1974 HOLDER BLASTING CAP M8《M8型雷管夹持器》.pdf_第2页
第2页 / 共6页
ARMY MIL-H-48398-1974 HOLDER BLASTING CAP M8《M8型雷管夹持器》.pdf_第3页
第3页 / 共6页
ARMY MIL-H-48398-1974 HOLDER BLASTING CAP M8《M8型雷管夹持器》.pdf_第4页
第4页 / 共6页
ARMY MIL-H-48398-1974 HOLDER BLASTING CAP M8《M8型雷管夹持器》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-H-4837 13 W 7777706 031770L 5 s -3147 MILITARY SPECIFICATION HOLDER, BLASTING CAP, M8 MIL-H-48398 (PA) 02 December 1974 This specification is approved for use by all Departments and Agencies of the Department of Defense, 1. SCOPE 1,l This specification covers the part and packing for one type of

2、 Cap Holder designated- as Holder, Blasting Cap, M8. 2, APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY i. 62 MIL-A-48078 - Ammun

3、ition, Standard Quality Assurance Provisions, General Specification For STANDARDS FEDERAL FED-STD-151 - Metals; Test Methods MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD- 105) MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammunitio

4、n Components FSC: i375 -THIS DOCUMENT CONTAINS 6 PAGES. I J -. i-!. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-48398 13 m 999990b 0337702 7 m MIL-H- 4 8 39 8 (PA) 5 DRAWINGS U,S. ARMY PICATINNY ARSENAL 8887302 - Holder, Blasting Cap, M8 (C

5、opies of specifications, standards, and drawings required by suppliers in connection with specific procurement func- tions should be obtained from the procuring activity or as directed by the Contracting Officer). 3. REQUIREMENTS 3.1 Material. - Materials and parts shall be in accord- 3.2 - ance wit

6、h applicable drawings and specifications. with all requirements specified on drawing and with all requirements specified in applicable specifi- cations. Cap Holder, - The blasting cap holder shall comply (dwg. ) 8887302 3.3 Workmanship, - All parts shall be fabricated and finished in a thorough work

7、manlike manner, and all manufactur- ing and processing, operations shall be correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, chips, dirt, grease and oil (except where specifically required), corrosion products and other foreign matter. The cl

8、eaning method used shall not be in- jurious to any part nor shall they be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. quired packing shall be dr

9、y. Re- I QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection and Standard Quality Assurance Provisions, - Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspecti

10、on. - Quality Conformance Inspection shall be conducted on this item, 2 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- NIL-H-q378 13 7797706 0327703 7 E MIL-H-48398 (PA) 4,3 Quality conformance inspection, 4.3.1 Inspection lot formation. - Inspec

11、tion lots shall comply with the lot formation provisions of MIL-A-48078. 4.3.2 Examination. - (See MIL-A-48078). Unless other- wise specified in the classification of defects and test tables, sampling plans for major and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. Equ

12、ip- ment necessary for the performance of the inspections listed - shall be in accordance with 4.3.4. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-q37 13 7797906 0337704 O I ! 44 r (U (UN (U(U(U(U(UM M MM MMCrlMMM . w ww wwwwww o O0 mmmmmm

13、 =r =Ta ooooOo o O0 000.000 . I a O % M c *ri v) v) y -. - -. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I . - MIL-H-48398 33 m 9999906 0339905 2 m MIL-H-48398 (PA) 4.3.3 Testing 4.303.1 Hardness of M8 blasting cap holder (see Dwg. 8887302). Maj

14、or B defect. - Twenty (20) blasting cap holders shall be selected from each heat treated batch for test. If any holder fails to comply with the applicable requirements, the heat treated batch represented by the sample shall be rejected. The test shall be performed as specified in 4.4.1 using equipme

15、nt in accordance with 4.3.4. Samples complying with the requirement may be returned to the lot. tructive Test) (Non-des- 4.3.4 Inspection Equipment. - The inspection equipment required to perform the inspections and tests prescribed in this specification is identified in the Inspection Method column

16、 in the tables starting with para- graph 4.3.2-1, and the test method paragraphs (see 4.4). contractor shall submit for approval, inspection equipment designs in accordance with the terms for the contract. Section 6 of MIL-A-48078 and Section 6.3 herein. Paragraph Reference/ The See 4.4 Test Methods

17、 and Procedures 4.4.1 Hardness of M8 blasting cap holder. - The blasting cap holder shall be tested for hardness as specified in Federal Standard No. 151, Method 243. 5. PREPARATION FOR DELIVERY 5.1 Preservation, packaging, p acking and marking 5.1.1 Level A, - The blasting cap holders shall be pack

18、aged and packed and the unit, intermediate and ex- terior containers shall be marked in accordance with Level A of MIL-STD-1169. packaged and packed and the unit, intermediate and ex- terior containers shall be marked in accordance with Level C of MIL-STD-1169. 5,l,2 Level C. - The blasting cap hold

19、ers shall be 6. NOTES - 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-H-V37 13 9 7777906 0337706 MIL-E- 4 8 39 8 ( PA ) I. 6.1 Intended Use. - The holder, biisting cap, M8 is intended for use in the detonation of the Charge, Demolition R11,

20、 Mi86 and the Charge Demolition, 1.18. 6.2 Ordering Data. - Procu-ement dccuments shall specify the following : a. Title, number and date of this specification. b. Provisions of MIL-A-48078. 6.3 Submission of inspection equipment designs for approval. (See MIL-A-48078). - Submit equipment designs as

21、 required, to Commander: Picatinny Arsenal, ATTN: SARPA-QA-T Dover, New Jersey 0780i, of data cards shall include the following: Commander, Picatinny Arsenal, ATTN: SARPA-QA-A-M Dover, New Jersey 07801. 6.4 Distribution of ammunition data cards, - Distribution Custodian: Army-PA Preparing Activity: Aymy-PA Project Number; 1375-A-i14 * U. S, GOVERNMENT PRINTING OFFICE: 1975 -603-114/3897 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1