1、T,is Spec MIL-M-63457A 13 m 799990b 0350882 b m 5 - 3 7/05 MIL-M-6 3 4 57A (AR) 26 Auqust 1987 SUPERSEDING MIL-M-63457 (AR) 15 June 1982 MILITARY SPECIFICATION MINE, ANTITANK: HE, BLU-91/B LOADING, ASSEMBLING AND PACKING ication is approved for use within the U.S. Army t Armament, Munitions and Chem
2、ical Command, and is available-for use by all Departments and Agencies of the Department of Defense. 3 1. SCOPE 1.1 Scope. This Specification contains requirements not normally covered by the drawings, and provides quality assurance provisions for the loading, assembling and packing for one type of
3、mine designated as Mine, Antitank: HE, BLU-91/B, used in CBU-78JB and CBU-89/B Dispensers. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this specfication to the extent specified herein. Unless otherwis
4、e specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation. SPECIFICATIONS MIL I TARY MIL-S-45743 - Soldering, Manual Type, High Reliability, MIL-A-48078 -
5、 Ammunition, Standard Quality Assurance Electrical and Electronic Equipment. Provisions General Specification For. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes. 1 Beneficial comments (recommendations, additions, deletions) and any pertinent data which
6、may be of use in Improving this document should be addressed to: Commander, U.S. Army Armament,Munitions and Chemical Command, Attn. AMSMC-QA, Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardize- tion Document Improvement Proposal (DD Form 1426) appearing it the end of t
7、his document or by letter. AMSC N/A FSC 1345 DISTRIBUTION STATEMENT A. Approved for mblic releaser rti.+i hiit -ion is unlimited. THIS DOCUMENT CONTAINS 4.3 PAGES. E / -= - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-286 - Propellant, Sol
8、id: Sampling, Examination 0 and Testinq. MIL-STD-331 - Fuze and Fze Components, Environmental and MIL-STD-652 - Propellant, Solid for Cannon Requirements Performance Tests for. and Packing. 2.1.2 Other Government documents, drawinqs, and publications. The following other Government documents, drawin
9、gs, and publications form a part of this specification to the extent specified herein. the date of the solicitation. Unless otherwise specified, the issues shall be those in effect on DRAWINGS (See 6.5) I U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT DRAWINGS 933037
10、9 - BLU-91/B Electronics Assembly 9330381 - Mine, Antitank: HE, BLU-91/B 9332388 - Performance Requirements, Electronic 9330377 - Printed Wiring Board Assembly Assembly INSPECTION EQUIPMENT DRAWINGS 1183AS616 - Standard Wave Forms (Copies of specifications, standards, drawings, and publications requ
11、ired by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity) . 2.2 Other publications. The following document(s) form a part of this specification to the extent specified herein. Unless otherwise
12、specified, the issues of the documents which DoD adopted shall be the issue listed in the current DoDISS specified in the solicitation. Unless otherwise specified, the issues of documents not listed in the DoDISS shall be the issue of the nongovernment documents which is current on the date of the s
13、olicitation. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM Designation D792 - Specific Gravity and Density of Plastics by Displacement“, Method A-l. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-b3Ll57A 13 II 7777906 0350884 T (Appli
14、cation for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, Pennsylvania, 19103) . 2;3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail spe
15、cifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Material. Material shall be in accordan
16、ce with the applicable drawings, specifications and standards. 3.2 Components and assemblies. The components and assemblies shall comply with all requirements specified on Drawing (Dwg-) 9330381 and all associated drawings and with all requirements specified in applicable specifications and standard
17、s. 3.3 Safe kondition and circuit continuity verification. 3.3.1 S details associated with intended use, such as proper handling, dispensing, mixing, curing cycles, pot life, etc., cleaning agents, safety precautions, special ventilation, drying or other processes, and any other information of a sim
18、ilar nature that is considered necessary for the particular adhesive in use. This procedure shall be updated whenever a change is made such that the original assurance of product quality is affected. Submission of this procedure shall be in accordance with Data Item Description DI-T-5372 (Tailored).
19、 (See 6.9) O - - z 3.8 Documentation of plan for safety in handling and processing of munitions. Prior to loading, the contractor shall document a detailed plan of the procedures to be employed during handling of the munition. This documentation shall describe, as a minimum, the procedures to be emp
20、loyed to assure that the temperature of the electronics assemblies, mine assemblies, do not exceed 1650F at any time during processing or storage and in such instances the time at 165OF shall not exceed one (1) hour unless otherwise specified herein. In no case shall continuous storage of the items
21、be at a temperature above 100F for a period exceeding 30 days. Submission of the plan shall be in accordance with data item description DI-R-5372 (tailored) . (See 6.9) 3.9 First article inspection. This specification contains technical provisions for first article inspection. Requirements for O the
22、 submission of first article samples by the contractor shall be as specified in the contract. 3.10 Data requirement. The contractor shall generate data in accordance with the requirements of the data item description cited in .6.9. 3.11 Workmanship. All parts and assemblies shall be fabricated, load
23、ed and assembled in a thorough workmanlike manner, and all manufacturing, processing, and assembling operations shall be correctly performed. All parts and assemblies shall be clean, free of burrs, sharp edges, cracks, dirt, grease, rust, and other foreign matter that may impair proper functioning.
24、The cleaning method used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent(s). Exterior surface coating shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. Required packi
25、ng shall be dry. The boosters and main charges shall be free of surface defects (voids, protrusions, inclusions). Breakage (chips, nicks) on the outside edge (corner) of the main charge not exceeding 1/8 sq. inch in area, 1/8 inch in depth, and not exceeding three (3) per side are acceptable. 5 _cLc
26、7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63457A 13 7977706 0350887 5 MIL-M-63457A(AR) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsiblity for inspection. Unless otherwise specified in the contract or purchase order, the contractor is res
27、ponsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by
28、 the Government. The Government reserves the right to perform any of the inspections set forth in the specification where services conform to prescribed requirements. requirements of sections 3 and 5. The inspection set forth in this specification system or quality program. The absence of any inspec
29、tion requiremnts in the specification shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defec
30、tive material, either indicated or actual, nor does it commit the Government to acceptance of defective material. such inspections are deemed necessary to assure supplies and 5 4.1.1 Responsibility for compliance. All items must meet all I 4.2 Classification of inspections. The following types-of in
31、spections shall be conducted on this item. a. First Article Inspection b. Quality Conformance Inspection . 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.
32、3.2. The first article sample shall consist of the following items in sample quantities as indicated. Part Description Draw inqs Quant i ty I- . Booster Main Charge Mine, Antitank: HE, BLU-91/B 9277827 9278018 9330381 10 10 21 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified
33、herein. 4.3.3 Rejection. See MIL-A-48078. 6 , - F - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i I I .d a, d o .d u k 1 Id e H r !i? n 8 Y w Z o 5 Y) 3 o ri arming of the S and functioning as follows: O a. Initiating and emplacinq. Using the air
34、gun launcher, and SD setter (4.4.51, the lot acceptance test mines shall be given the MCD signal, and launched into a test pit containing a microphone and target signature coil. This sequence will activate the mine and commit-to-arm the S premature detonation; early self destruct (SD); enable time;
35、hazardous duds; non-hazardous dud (Dud); hiqh order function: For purposes of the tests in this specification, the following terms are defined: a. Premature arming. Is defined as arming of the S&A assy (evidenced by actuation of piston actuator) before the minimum arming actuator output time specifi
36、ed on Dwg. 9332388. (Critical defect) b. Premature detonation. Is defined as detonation of mine (SLA armed) occuring before the minimum sensor enable time specified on Dwg. 9332388. (Critical defect) mine (S&A armed) occuring at or after the minimum sensor enable time specified on Dwg. 9332388 but b
37、efore being functioned by any intended mode. (Major defect) c. Early self destruct. Is defined as detonation of the d. Enable time. Is defined as the maximum sensor enable time specified on Dwg. 9332388, plus 5 minutes minimum, after application of electromagnetic pulse. e. Hazardous dud. Is defined
38、 as an armed mine capable of being functioned, after the set SD time has elapsed, by target sensor, disturbance, self-destruct or any other stimuli (See 3.6.3). (Cri tical defect) f. Non-hazardous dud (Dud). Is defined as a mine incapable of being functioned, after the set SD time has elapsed, by an
39、y of the modes listed in 6.7e above (See 3.6.3). (Major defect) g. High order functioning. HE Mine: High order functioning will be evidenced by high order detonation of the Main charge train and perforation (by the M-S plate) through a one (1) inch thick and a one-half inch thick hot rolled steel pl
40、ates and spa11 on subsequent witness plate (See 3.6.2.1 and 4.5.3). 6.7 Submission of results from contractor conducted examinations and tests. Unless otherwise specified by the Contracting Officer, the contractor shall forward requested records of examinations and tests to Commander, US Army Armame
41、nt Research, Development and Engineering Center, ATTN: AMSMC-QAT-M (D), Picatinny Arsenal, NJ 07806-5000. 27 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63LI57A 13 m 7747706 0350707 O m MIL-M-63 457A (AR) a 6.8 Submission of procedures. Sub
42、mission of pr0cedur.e specified in 3.8 shall be addressed to Technical Agency required in contract. Commander, US Army Armament Research, Development and Engineering Center, ATTN: AMSMC-QAT-M (D), Picatinny Arsenal, NJ 07806-5000. 6.9 Data requirements. Deliverable data required by this specificatio
43、n is cited in the following paragraphs: Par aq r aph 3.7, 4.4.3.4 3.8, 6.8 Data Requirement Applicable DID Plan for control in DI-T-5372 use of adhesives (Tailored) Safety Plans DI -T- 53 7 2 (Tailored) 4.4.3.3 Quality Inspection DI-R-17 2 4 6.7 Test, Demonstration & Evaluation Report 6.4 Ammunition
44、 Data Card DI-L-1410 6.10 Changes from previous issue. The margins of this specification are marked with vertical lines to indicate where significant changes from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies
45、 in these notations. 6.11 Subject term (key word) listing. Mine Ant i- tank HE, BLU 91/B Main charge Explosive Self-destruct Prime target Modes Launch simulator Custodian: Army-AR Pr epa r i ng act i v i ty : Army-AR (Project 13 4 5447 0 1 28 Provided by IHSNot for ResaleNo reproduction or networkin
46、g permitted without license from IHS-,-,-i t I I i I I I I I I I l I l I i I I t I 1 I I I I I I I I I I I I I l t 1 i I I I I MIL-Pi-63457A 33 7777706 0350730 7 MIL-M-6 3 4 57A (AR) APPENDIX A MINE ASSEMBLY, BLU 91/B, TEST (AT-40) ASSEMBLING AND PACKING 10. SCOPE l.1 Scope. This appendix details th
47、e quality assurance provisions for loading, assembling and packing of one type of mine designated as Mine Assembly, BLU 91/B, Test (AT-40) used in CBU 78 (T-4)/B and CBU 89 (T-4)/B Test Dispensers. This appendix is a mandatory part of this specification. The information contained herein is intended
48、for compliance. Unless otherwise specified herein the requirements for Mine Assembly, BLU 91/B, Test (AT-40) sub-assemblies are indentical to the requirements for Mine, Anti-Tank: HE, BLU 91/B contained in this specification. Each paragraph in the specification for the HE Mine is included in this ap
49、pendix to indicate its applicability to the Test Mine. 20. APPLICABLE DOCUMENTS 20.1 Issue of documents. 20.1.1 Specifications. This paragraph is applicable to this appendix. (Applicable) 20.1.2 Standards. Applicable. 20.1.3 Drawinqs. (See 60.5) US ARMY ARMAMENTS RESEARCH, DEVELOPMENT AND ENGINEERING CENTER ( ARDEC) PRODUCT DRAWINGS 9349483 - Mine Assembly, BLU 91/B, Test (AT-40) 9330379 - BLU 91/B Electronics MCD Assembly 9332388 - Performance Requirem