ARMY MIL-P-46279-1960 PRIMER PERCUSSION ELECTRIC M75 LOADING ASSEMBLING AND PACKING (INCLUDING LOADING OF PERCUSSION-ELECTRIC IGNITION ELEMENT T21E1)《M75式电撞两用引物的装药 组装和包装(包括T21E1式电 .pdf

上传人:registerpick115 文档编号:446279 上传时间:2018-11-16 格式:PDF 页数:19 大小:979.97KB
下载 相关 举报
ARMY MIL-P-46279-1960 PRIMER PERCUSSION ELECTRIC M75 LOADING ASSEMBLING AND PACKING (INCLUDING LOADING OF PERCUSSION-ELECTRIC IGNITION ELEMENT T21E1)《M75式电撞两用引物的装药 组装和包装(包括T21E1式电 .pdf_第1页
第1页 / 共19页
ARMY MIL-P-46279-1960 PRIMER PERCUSSION ELECTRIC M75 LOADING ASSEMBLING AND PACKING (INCLUDING LOADING OF PERCUSSION-ELECTRIC IGNITION ELEMENT T21E1)《M75式电撞两用引物的装药 组装和包装(包括T21E1式电 .pdf_第2页
第2页 / 共19页
ARMY MIL-P-46279-1960 PRIMER PERCUSSION ELECTRIC M75 LOADING ASSEMBLING AND PACKING (INCLUDING LOADING OF PERCUSSION-ELECTRIC IGNITION ELEMENT T21E1)《M75式电撞两用引物的装药 组装和包装(包括T21E1式电 .pdf_第3页
第3页 / 共19页
ARMY MIL-P-46279-1960 PRIMER PERCUSSION ELECTRIC M75 LOADING ASSEMBLING AND PACKING (INCLUDING LOADING OF PERCUSSION-ELECTRIC IGNITION ELEMENT T21E1)《M75式电撞两用引物的装药 组装和包装(包括T21E1式电 .pdf_第4页
第4页 / 共19页
ARMY MIL-P-46279-1960 PRIMER PERCUSSION ELECTRIC M75 LOADING ASSEMBLING AND PACKING (INCLUDING LOADING OF PERCUSSION-ELECTRIC IGNITION ELEMENT T21E1)《M75式电撞两用引物的装药 组装和包装(包括T21E1式电 .pdf_第5页
第5页 / 共19页
亲,该文档总共19页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、I MIL-P-46279 13 = 399990b 031ObO 3 I PRIMER, PERCUSSION, ELECTRIC, M75 I 1.1 This swcification cove!s the loadinn. assembling and. 2. APPLICABLE X“TS 2.1 The following documents of the issue in effect on date of invitation for bids form a part of this specification to the extent sbecified herein. J

2、AN-P-223 - Powder, Black. MIL-0-2550 - General Specification for Anmniuiition Except Small Arms Ammunition. I MIL-STD-IO5 - Sampling Procedures and Tables for Inspection MIL-STD-109 - Inspection Terms and Definitions. Assembly Dtails and-Packing, For Domestic Use Only. Provided by IHSNot for ResaleN

3、o reproduction or networking permitted without license from IHS-,-,-8796536 - Box Packing, For Primer, Percussion, Electric, TlOb or Electric, T107, Assembly, Details and Packing. For Domestic Use Only. $796678 - Box, Sat-Box, Set-Up, Packing, Ammunition for Primers Percussion, Electric, T106 or Ele

4、ctric T107, Assembly, Details, Packing and Marking. For Overseas Use Only. cussion, Electric, T106 and Electric Assembly, Details and Packing. Use Only, 8796679 - Box, Packing, Ammunition, for Primers, Per- T107. For bverseas PWLICAlTOHQ. ORDRANCE INSPECMON HANDBOOK 0R.D608- - Procedures and Tablea

5、for Continuous GL-8801948 - Index oc Inspection Equipment Mats. specification and shall perform ail inspections required by the systemllts.obtained for all inpection performed. Drawing, speciacation number and date, together with Certificates of analyses on all materia procurd Humber of i-s in the l

6、ot, i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-qb277 L3 U 9777706 03LOb4 O a . MIL-P-46279 (Ord i+,i.3 Government verification.-Using the contrac60rT8 writ.ten quality assurance proceure, this detail specification, the appli- cable draw

7、Ings and other contractual documents as a-guide, the Government inspector shall verify at unscheduled intervals all quality assurance operations performedby the contractor. Verifi- cation shall consist of: (a) surveillance of contractor operation to det81m%m that the methods and procedures of the wr

8、itten pro- cedure are being properly applied and (b) inspection. The Government inspector shall ais0 ascertain prior to acceptance that the product complies with all the quality assur- ance provisions of other specifications referenced in any of the Government product contractual documents. i+*1,3*1

9、 Surveillance-Surveillance shall include, bat ia not limited tor a. Observation of procedures concerning lot formation and identification. b. Observation of eampling procedures and application of acceptance criteria. C. Determination that all required examinations and tests are performed,ln accordan

10、ce with the prescribed procedures of this specification, or approved equivalents thereto. d. Review of procedures for control and dlspaitiorr of non-conforming material. 4,1.3.2 ment of contractor accepted .pro percent for each major defect and an AQL of 0.40 percent for each minor defect. anent nec

11、essary for the performance of the inspections listed shall be in accordance with 4.2.4. Equip- b.2e20,2. 4.2.3.1.3 Fi l+.-2.3.1.3 e1 lm for this test s 3.8.1) - Major defect.-The sampling e in accordance with Standard MIL-STD-105, * PrIwrR te6ted for tho non-functioning electrical phaee ehe11 not be

12、 returned to the lot. 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-46279 (Ord) 1+.2.3.1.3.2 Electrical (see 3.8.2) - Major defect.-The sampling plan for this test shall be as specified in 4.2.3.1.3.1. shall be performed as specified in 4.

13、3.6.2. 4.2.3.2 Normal production.-After acceptance of the initial pro- duction lots, testing shall be as follows: 4.2.3.2.1 Moisture content at loading station at time of load- inn.-The contractor shall provide adequate controls to assure the compliance of each lot with the applicable requirements.

14、The con- t$actor shall test for verification at least one completed primer asaembly from each eight hours production. Composite samples shall not be used in determining compliance. The following composition and powder shall be tested as specified and any failure to comply with the applicable require

15、ment shall be cause for rejection of the eight hours production represented by the sample. content shall be determined as.specified in 4.3.1. defect.-Tdsting sha-I, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-46279 (Ord) 5. PREPARATION FOR

16、DELIVERY 5.1 5.1.1 Level A.-Packaging for Primer, Percussion, E and the fact that the Governmient may have formulated, furnished, or in any way supplied the said drawings, specifications, or other data is not to be regarded by implication or otherwise as in any manner licensing the holder or any oth

17、er person or corporation, or conveying any rights or permission to manufacture, use, or sell any patented invention that.may in any way be related thereto. The samples shall be tested as specified in 6.3.2 6.3.3 The samples shall be tested as specified in The test shall be per- Electrical resistance.-The contractor shall. perform this 6.3.3 and 6.3.4. Th e black powder shal d Custodian: Army-Ordnance Corps Preparing activity: Army-Ordnance Corps GPg 900791 :- i. gd Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1