ARMY MIL-P-46686 C-1968 PRIMER PERCUSSION M92E1 PARTS FOR《M92E1撞击引物用零部件》.pdf

上传人:tireattitude366 文档编号:446323 上传时间:2018-11-16 格式:PDF 页数:11 大小:484.21KB
下载 相关 举报
ARMY MIL-P-46686 C-1968 PRIMER PERCUSSION M92E1 PARTS FOR《M92E1撞击引物用零部件》.pdf_第1页
第1页 / 共11页
ARMY MIL-P-46686 C-1968 PRIMER PERCUSSION M92E1 PARTS FOR《M92E1撞击引物用零部件》.pdf_第2页
第2页 / 共11页
ARMY MIL-P-46686 C-1968 PRIMER PERCUSSION M92E1 PARTS FOR《M92E1撞击引物用零部件》.pdf_第3页
第3页 / 共11页
ARMY MIL-P-46686 C-1968 PRIMER PERCUSSION M92E1 PARTS FOR《M92E1撞击引物用零部件》.pdf_第4页
第4页 / 共11页
ARMY MIL-P-46686 C-1968 PRIMER PERCUSSION M92E1 PARTS FOR《M92E1撞击引物用零部件》.pdf_第5页
第5页 / 共11页
亲,该文档总共11页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、30 June 1964 -I 1. SCOPE 1.1 This Specification covers the parts for one type of percussion primer designated as Primer, Percussion, M92E1. r 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect I on date of invitation for bids, or request for proposal, L form a part of this sp

2、ecification to the extent specified t herein. SPECIFICATIONS MILITARY MIL-A-2550 - Ammunition and Special Weapons; -1-45607 - Inspection Equipment, Supply and General Specification for. Maintenance of. STANDARDS MILITARY MIL-STD-105 - Sampling Procedure and Tables for Inspection by Attributes. MIL-S

3、TD-109 - Quality Assurance Terms and Definitions. MIL-STD-1167 - Ammunition Data Card. NIL-STD-1168 - Lot Numbering of Ammunition. MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert emmunition Components. MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures and Tables

4、 for Inspection by Attributes. DRAWINGS FSC: 1390 A THIS DOCUMENT CONTAINS i! PAGES. .- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-mIL-P-4bb8bC 13 999990b 0314139 b MIL-P-46686C (MU) , .-. 8863399 - Wad 9231622 - Sleeve 9231699 - Head, Primer 92

5、31700 - Body Assembly . -8863400 - Tube i i PUBLICATIONS .* f ARMY -. ET-8 872.317- Equipment Tabulation (Copies of specifications ,. standards, drawings and publications Tequired by suppliers in. connection-with specific procurement functions should be obtained from the procuring activity or as dir

6、ected by the contracting officer)-. I- 3. REQUIREMENTS .i *. :. . _- 3.1 Material.-Materials shall be in accordance with applicable drawings and specifications. 3.2 Parts.-The parts shall comply with all requirements specified on Drawings 8863399, 8863400, 8863397, 9231622, 9231699, and 9231700., as

7、 applicable, and with all .requirements specified in applicable specifications. finished in a thorough, workmanlike manner. 3.3 .Workmanship.-All parts shall be fabricated and 3.3.1 Metal components.-They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, cracks, chips,

8、 dirt, grease, corrosion and other foreign matter. The cleaning method used shall not be injurious to any parts nor shall the parts be contaminated by the cleaning agent. excessive flash, air bubbles, holes, blisters and foreign material. First Article Inspection.- This specification makes provision

9、s for first article inspection. Requirements for sub- mission of first article samples by the contractor shall be as specified in the contract. 3.3.2 Plastic components. -They shall be free from cracks, 3.3.3 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specifi

10、ed in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I - I 4 MIL-P-46686C (MU) c

11、ontract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Govern- ment, The Government reserves the right to perform any of the inspections set forth in the specification where such i

12、nspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 in order to define terms used herein. The pro- visions of Specification MIL-A-2550 shall apply. 4.1.1 Submission of product.-At the time the completed l

13、ot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the q

14、uality assurance provisions specified within this specification. b. Number of units of product inspected. c. Results obtained, by defect code, for all inspections performed. d. Drawing, specification number and date, together with an identification and date of changes. e. Certificates of conformance

15、 on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contractual documents. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be s

16、ubstantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. f. Number of items in

17、the lot, g. Date submitted. 4.2 First Article Inspection 4.2.1 Submission.- The contractor shall submit a first article sample designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of 10 each individual components, (se

18、e Note below) which have been produced by the cgntractor or furnished by a supplier and which have been manufactured using the same production processes, procedures 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-P-46686C (MU)- I and equipmen

19、t whlch wiTB -be used in fulfilling the contract. AI1 parts and materials including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall Inspect the sample to-the degree necessary to assure that it co

20、nforms-to the requirements of the contract and submit a record of this inspection with the sample, including statements of findings for materials, processes, and tests. A sample contain- ing known defects will not be submitted unless specifically authorized by the Contracting Officer. or portion the

21、re of as directed by the contracting officer shall also be submitted whenever there is a lapse in production for a period in.excess-of 90 days or whenever a change occurs in manufacturing process, materal used, drawing or specification such as to significantly affect product uniformity as determined

22、 by the Government. Note: molded parts when more than 1 (one) single cavity .mold or multiple cavity molds are used .in the fabrication of any component, 5 (five) sample components from each mold cavity shall be submitted in lieu of the above requirements of 10 (ten) samples of each component. ! i !

23、 I A first article sample 1. t On Molded components shall be identified 6 .as to mold and cavity numbers. . 4.2.2. Inspections to be performed.-Assemblies and components will be subjected by the Government to any or all of the examina- tions or tests specified in this specification and any or all re

24、quirements of the applicable drawings. 4.2.3 Rejection.-If any assembly or component fails to comply with any or all of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate its inspection upon any failure of assembly component in the

25、 sample to comply with any or all of the stated requirements. In the event of rejection, the Government reserves the right to require the contractor to take corrective action and submit a new first article sample or portion thereof. Until a first article sample is accepted, the contractor is, in no

26、way, authorized by the Government to initiate regular production unless otherwise directed by the contracting officer. 4.3 inspection provisions 4.3.1 Lot formation.-The term lot“ as used throughout this specification refers to an inspection lot, which is defined as an essentially homogeneous collec

27、tion of units of product 4 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I I MIL-P-46686C (MU) from which a representative sample is drawn and inspected to determine conformance of the lot with applicable requirements. The sample selected shall r

28、epresent only that quantity of units from which-the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process using th

29、e same materials and methods, in accordance with the same drawings, same drawing revisions, same specifications and same specification revisions. Changes to the process, specifications, or drawings, not affecting safety, performance, tnterchangeability, or storage, as determined by the Government, s

30、hall not be deemed to alter the homogeneity of the lot. In- spection lots shall comply with MIL-STD-105. Unless otherwise approved by the contracting officer, theinspection lot size of end items deliverable under the contract shall be not less than the smallest weekly estimate of quantities contract

31、ually scheduled for production during the contract period nor more than the largest monthly quantity contractually scheduled for delivery during the contract period. Inspection lots of components or subassemblies, other than the items of delivery, shall be homogeneous and of a size mutually convenie

32、nt to both the contractor and the Government inspector. Lot numbering, as required, shall be in accordance with MIL-STD-1168. 4.3.2 Examination.-Inspection for Critical defects (and Major defects, when so specified), shall be 100 percent. Sampling plans and procedures for Major and Minor defects sha

33、ll be in accordance with MIL-STD-105 except that continuous sampling plans in accordance with MIL-STD-1235 may be used if approved by the procuring activity. Also, at the option of the procuring activity AQL*s and sampling plans may be applied to individual characteristics listed using an AQL of 0.6

34、5 percent for each Minor defect and an AQL of 0.40 percent for each Major defect, except where 100 percent inspection is specified. Equipment necessary for the performance of the inspections listed shall be . in accordance with 4.4. 4.3.2.1 Tube (see dwg. 8863400) Categories Defects Method of Code N

35、o. Inspection (see 6.2) Critical: None defined Major: None defined Minor : AQL 1.5 percent 201. Outside diameter Gage O1001 5 .- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. I MIL-P-4bbbC 13 9999906 0314143 MIL-P-46686C -i (MU) . . 202. Inside d

36、iameter.Gage 203. Length. . Gage 204. Evidence.of poor workmanship 4.3.2.2 Primer Head (see dwg. 4231699) (see 3.3). .*. .*Viual Categories De fe c t s Method of- 1 Inspection Critical: None defined .Major: I .AQL 1.0 percent . . 101. Flange thickness. :.:.,Gage 102. Flange diameter, max. ., Gage 10

37、3. Depth of primer element cavity counterbore, min. Gage 104. Diameter of primer element cavity counterbore, min. Gage 105. Diameter of primer element cavity . Gage 106. Pitch diameter of thread. . Gage 107. Major- diameter of threadGage -108. Diameter below the shoulder, max. Gage log. Radius of cr

38、imping groove, min. Gage Minor: 201. 202, 203 . 204. 205. 206. 207. 208. 209. 210. 211. 212. 213 . 214 . 215. AQL 4.0 percent Depth of primer element cavity counterbore, max. Gage Depth of primer element cavity Gage Length of full threads, min. .,. Gage Thread chamfer missing Gage Radius of crimping

39、 groove, max. Gage Location of crimping groove . Gage Crimping groove having sharp edge. Visual- Fillet radius at base of flange, max. .G age Diameter of flash holeGage Outside diameter of small end, minGage Chamfer missing at flash hole.Visual Diameter of wrench hole.Gage Location of wrench hole.Ga

40、ge Overall length. . Gage Evidence of poor workmanship (see 3.3) . Visual Manual 01002 01004 01003 Code No. 06001 -06002 06003 06005 06007 06004 06006 06008 06009 06010 06011 06012 06013 06015 06016 06014 06017 06019 06021 06022 06018 06020 06023 06024 Provided by IHSNot for ResaleNo reproduction or

41、 networking permitted without license from IHS-,-,-MIL-P-46bbC 33 m 7777706 0334344 T m . I 1 I MIL-P-46686C -S.3.2.3 Sleeve (see dwg. 9231622)- Categories Defects Critical: None defined :MethaB.- of! Inspection. Ma j or : Minor: AQL 1.5 percent AQL 0.40 percent 101. Wall thickness Gage 201. Outside

42、 dieter.* .*.Gage 203. Evidence of-poor workmanship 4.3.2.4 Body Assembly (see dwg. 9231700) 202. Length . Gage (see 3.3). Visual Categories Defects Critical: None defined Method of Inspection Major: AQL 0.65 percent 101. Sleeve not inserted all the way onto the tube.Visual 102. Cut or rupture of tu

43、beVisual 103. Inner surface of tube at the reduced portion wrinkled or distorted,Visual Minor: None defined 4.3.2.5 Cap (see dwg. 8863397) Categories Defects Critical: None defined Major: None defined (MU) _. - gode No.:- O7001 07002 07003 07004 Code No. 08001 08002 08003 Method of Code No. Inspecti

44、on Minor: AQL 2.5 percent 201. Large diameter. . Gage 202. Diameter of large end of taperGage 203. Thickness.,.b.Gage 204. Thickness of flange.Gage 04001 04002 04003 04004 7 - -*a-*- /. . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-P-4666C

45、13 7777906 0319245 2 M 1-P-46686C (MU) 205. Angle of taper (max.). Gage 04005 206. Evidence of poor workmanship (see 3.3) . Visual 04006 4.3.2.6 Wad (see dwg. 8863399) Categories Defects Method of Code No, Inspection Critical: None defined Major: None defined Minor: AQL 1.0 percent 201. Thickness, m

46、in. Gage 05001 202. Evidence of poor workmanship (see 3.3) . Visual 05002 4.4 Inspection Equipment.-Equipment Tabulation Number 31-8872317 identifies the inspection equipment required to perform the examinations and tests prescribed in this section. The contractor shall design inspection equipment i

47、n accordance with the instructions in 6.3. 4.4.1 Government rights to documentation.-Inspection equipment drawings and lists provided and revised in accordance with the requirements of the ET may be used by DOD activities for design, procurement, manufacture, testing, evaluation, production and rece

48、iving inspection, overhaul, shipping, storage, identification of stock, ordering and storage of replacement parts, inspection of items at overhaul, general maintenance of equipment, construction, survey and whenever inspection equipment drawings are needed. 4.4.2 Supply and maintenance.-Supply and m

49、aintenance of the equipment listed in the ET shall be in accordance with Specification MIL-1-45607. 4.4.3 Government use of contractors inspection equipment.- The contractor shall make available to the Government all inspection equipment necessary for determining conformance with contract requirements. Personnel for operating the equipment and verification of its accuracy, shall be supplie

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1