ARMY MIL-P-48649-1986 PROJECTILE 155MM M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm射弹的装药 组装和包装》.pdf

上传人:eventdump275 文档编号:446425 上传时间:2018-11-16 格式:PDF 页数:47 大小:1.72MB
下载 相关 举报
ARMY MIL-P-48649-1986 PROJECTILE 155MM M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm射弹的装药 组装和包装》.pdf_第1页
第1页 / 共47页
ARMY MIL-P-48649-1986 PROJECTILE 155MM M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm射弹的装药 组装和包装》.pdf_第2页
第2页 / 共47页
ARMY MIL-P-48649-1986 PROJECTILE 155MM M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm射弹的装药 组装和包装》.pdf_第3页
第3页 / 共47页
ARMY MIL-P-48649-1986 PROJECTILE 155MM M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm射弹的装药 组装和包装》.pdf_第4页
第4页 / 共47页
ARMY MIL-P-48649-1986 PROJECTILE 155MM M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm射弹的装药 组装和包装》.pdf_第5页
第5页 / 共47页
亲,该文档总共47页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、- MIL-P-48647 13 9 777770b 0322852 O W Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this hment should be addressed to: Commander, US Amy Armament Research and Development Center, Attn: AMSMC-QA, Dover, New Jersey 07801-5QO1 B udn

2、g the KV-addressed Standardltaon Document Improvcmmt O c l e MIL-P-4 8 64 9 (AR) 31 July 1986 MILITARY SPECIFICATION PROJECTILE, 15 5MM, M7 18Al/M741Al TYPES, LOADING, ASSEMBLING AND PACKING OF This Specification is approved for use within the US Army Armament Research and Development Command and is

3、 available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification contains requirements not normally covered by the drawings and provides quality assurance provisions for the fabrication of parts, assembly, and packing for the Projectile, 155MM, M718Al/

4、M741Al Types. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification to the extent speci.fied herein. Unless otherwise specified, t

5、he issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDlSS) and supplement thereto, listed in the solicitation. SPECIFICATIONS MILITARY MIL-A-48078 Ammunition, Standard Quality Assurance Provisions, General Specification

6、s for AMSMC N/A FSC 1320 DISTRIBUTION STATEMENT A. Approved for public release; distribution Is unlimited. THIS DOCIJMENT CONTAINS 9 9 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-Lt8647 13 7777906 0322853 2 MIL-P-48649 (AR) MIL-P-486

7、48 Projectile, 155MM, Test, MIL-S-45743 Soldering, Manual Type, High Reliability Non-Haz,M718Al/M741A1 Electrical and Electronic Equipment. STANDARDS MILITARY MIL-STD-105 Sampling Procedures and Tables for Inspect ion by Attributes MIL-STD- 453 Inspect ion, Rad iog raphic MIL-STD- 12 35 Single and M

8、ult i-Level Continuous Sampling Procedures and Tables for Inspection by Attributes (Copies of spec if icat ions, standards, drawings, publication and other Government documents required by the suppliers in connection with specific procurement functions should be obtained from the procuring activity

9、or as directed by the Contracting Officer.) The following other Government documents, drawings, and publications form a part of this seecification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on th+ date of the solicitation. 2.1.2 Other Government d

10、ocuments, drawings, and publications. DRAW I N GS U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER PRODUCT AND PACKAGEING DRAWINGS 8837839 - Pallet, Projectile, 155MM, HE and GB, Hollow Base Type 9277922 - Mines, AT, Demonstrator, HE 11786215 - Projectile, 155MM, AT, M718A1 11786240 - Projectile,

11、155MM, AT, M741A1 2.1.3 Other publications. The following documents form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted shall be those listed in the issue of the DODISS specified in the solicitation. Unless o

12、therwise specified, the issues of documents not listed in the DODISS shall be the issue of the nongovernment documents which is current on the date of the solicitation. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P -4 86 4 9 (AR) American S

13、ociety For Testing and Materials ASTM Designation D792 - Specific Gravity and Density of Plastics by Displacement, Method A-l. Code of Federal Regulations - Code of Federal Regulations, Title 49-Transportation parts 100-199. (Application for copies should be addressed to: American Society for Testin

14、g and Materials, 1916 Race Street, Philadelphia, PA. 19103). 2.2 Order of precedene. In the event of a conflict between the text of this specification and the reference cited here, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicabl

15、e laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Material. Materials shall be in accordance with the applicable drawings and specifications. 3.2 Projectile. The projectile assembly, mines, and components shall comply with all requirements specified on drawing

16、s, all associated drawings, and with all requirements of the applicable specifications. 3.3 S i.e. no cracks in the lead sheathing, or neck down (reduction in diameter) below 75% of the original diameter, anywhere along the length of the MDF. 3.4 Solderinq of the flexprint to the electronic assembly

17、 terminals. Soldering of the terminals shall comply with MIL-S-45743. 3.5 M-S plate to electronic assembly interface. The M-S plate shall mate with the cover flange of the electronic assembly around the entire circumference. Gaps shall not exceed .O25 inch under hand pressure. 3 -0. Provided by IHSN

18、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48649 13 799970b 0322855 b MIL-P-4 8 6 4 9 (AR) I 3.6 Explosive output performance 3.6.1 Static functioning of booster (9277827) . The booster, when initiated, shall propagate to themain charge, resulting in: l a

19、. High order detonation. I b. Penetration of the M-S plate through the required configuration of steel plates. c. Spall (particle indentation) on the witness plate. (See 4.5.3) 3.6.2 Static functioning of the main charge (9278018). The main charge, when initiated, shall produce a high order detonati

20、on, resulting in: a. Penetration of the M-S plate through the required configuration of steel plates. b. Spall (particle indentation) on the witness plate. (Third Plate) (See 4.5.3) Test, Non-Haz, M718Al/M741Al Types (Ref. MIL-P-48648) shall also be included in the ballistic functioninf tests as spe

21、cified. 3.7 Ballistic functioninq. Representative projectiles, 155MM 3.7.1 Projectile Body. There shall be no premature burst (See 6.5.1) or exdence thereof, and there shall be no separation of metal parts either in the bore of the weapon or in flight, prior to initiation of the nose fuze, in any of

22、 the ballistic functioning tests. excess pressure in the highest zone of the weapon. This requirement shall also apply to those rounds fired at 3.7.2 Projectile functioning. The projectile shall function satisfactorily (See 6.5) when subjected to ballistic function tests. 3.7.3 Mine functioninq. The

23、 mines (See 6.4) shall meet the following requirements after being ejected from the projectile onto the impact area. 3.7.3.1 Functioninq time . The mines from the M718A1 woiectile shall function within the time specified on drawing 111756215. The mines from the M741.Al projectile shall function with

24、in the time specified on drawing 11786240. M718A1 projectile shall not be capable of functioning after the maximum time specified on drawing 11786215. The mines from the M741A1 projectile shall not be capable of functioning after the maximum time specified on drawing 11786240. 3.7.3.2 Functioninq af

25、ter maximum time. The mines from the 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4Bb44 13 7779906 0322856 M - 3.7.3.3 Functioning by taxget vehicle siqnature. Each mine (See 6.4.b) shall function properly, as evidenced by functioning of t

26、he clearing charge when the mine is stimulated by a valid target signature. 3.8 Controls on the use of adhesives. The contractor shall develop a documented operational procedure for utilization of adhesives. This procedure shall provide for quality control of raw materials and processes to be used,

27、details associated with intended use, such as proper handling, dispensing, mixing, curing cycles, pot life, etc. , cleaning agents, safety precautions, special ventilation, drying or other processes , and any other information of a similar nature that is considered necessary for the particular adhes

28、ive in use. This procedure shall be updated whenever a change ia made such that the original assurance of product quality is affected. Submission of this procedure shall be in accordance with Data Item Description DI-T-5372 (Tailored) . 3.9 Documentation of plan for safety in handling and processing

29、 of munitions. Prior to loading, the contractor shall document a detailed plan of the procedures to be employed during handlinq of - - the munition. This documentation shall describe, as a minimum, the procedures to be employed to assure that: (1) The M718 and M741 electronic assemblies and mines sh

30、all remain segregated at all times. (2) Markings on electronic assemblies , mine assemblies , and projectiles are consistent, and handling of the items controlled to prevent intermixing. (3) The temperature of the electronic assemblies, mines, or projectile, does not exceed 1650F at any time during

31、processing or storage and the time at 1650F shall not exceed one (1) hour. In no case shall continuous storage of the items be at a temperature above 1000F for a period exceeding 30 days. (4) High explosive (HE) munition items shall remain segregated from inert munitions at all times, and identifica

32、tion of HE and inert munitions shall be strictly maintained. Submission of the plan shall be in accordance with data item description DI-T-5372 (Tailored) . 3.10 Data requirements. The contractor shall generate data in accordance with the requirements of the data item descriptions cited in paragraph

33、 6.9. 3.13 Fixst article inspection. When specified in the contract or purchase order , a sample shall be subieted to fixst article inspection in accordance with the technical provisions herein. (See 4.3 and 6.2). 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license

34、 from IHS-,-,-3.12 Surveillance units. This specification contains provisions or surveillance quantities of Test, Non-Haz Projectiles to be provided for each production lot. 3.13 Shortinq bar resistance. There shall be no more than (1) ohm resistance in the shorting bar loop when measured between th

35、e output terminal to ground. 3.14 Workmanship. All parts and assemblies shall be fabricated, loaded and assembled in a thorough workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust, and other foreign matter that may impair proper functioning. The cleaning method u

36、sed shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agents. All required marking and stamping shall be neat and sharply defined. Boosters and main charges shall .be free of surface defects, (voids, protrusions, inclusions, chips, nicks, etc.). Breakage on the

37、outside edge (corner) of the main charge, not exceeding 1/8 sq. inch in area, and/or 1/8 inch in depth, and not exceeding three (3) per side, is acceptable. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwise specified herein

38、or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. risibility for compliance. All items must meet all requirements 4-101 =F- o sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors o

39、verall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government or acceptance comply with all requirements of the contract. Sampli

40、ng in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Artic

41、le Inspection b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a first article sample, as designated by the Contracting Officer, for evaluation in . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I

42、HS-,-,-MIL-P-48649 (AR) accordance with the provisions of para. 4.3.2. The first article sample shall consist of the following items in the sample quantities indicated. Part Description Drawinq Quantity Booster Main Charge 9277827 9278018 5 5 Projectile, 155MM, AT, M718A1 11786215 3 a Projectile, 15

43、5MM, AT, M718Al Non Hazardous Test (See 6.4) 11786216 6 4.3.2 Inspections to be performed. The first article parts submitted in accordance with paragraph 4.3.1, will be subjected by the Government to any or all the requirements of the applicable drawings, and to the inspections and tests of Table 1.

44、 The projectiles shall be forwarded to a Government Proving Ground designated by the Contracting Officer for the ballistic functioning test. 4.3.3 Rejection. See MIL-A-48078 The first article sample shall be rejected if any assembly or projectile fails to comply with any of the examinations or tests

45、 specified in this specification, or any of the requirements of the applicable drawing. In addition, the first article sample shall be rejected if the ballistic test results reveal any one of the defects listed in 4.4.3.9.1. Defects from the round fired at excess pressure shall be recorded for infor

46、mation, but shall not be included for accept/reject purposes unless a hazardous dud condition is detected. Description of test items and procedures are described in paragraphs 6.4 and 4. 5. 8 respectively. In the event of rejection, the Government reserves the right to require the contractor to take

47、 corrective action and submit a new first article quantity. Until the first article quantity is accepted, the contractor is not to proceed with regular production unless otherwise directed by the Contracting Officer. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without lice

48、nse from IHS-,-,-Lll . nimm u3 cvcum . 03 rl (1 CQCQCO . . . . . . . *mm cr mmm emm *e -Pew w * . . rl (1 cv FFF cvcvu3 “u) mmm mmm m mmm . , . e . d COI 21 * c II! c, w :d a,B i Y O S h rc) E c 3 n m Co m S C - n O 7- L O LL n v v, 0) u Q W L! c3 W IL n I- n O b L E L O IL o z v, r a 22 /-=-I t- !

49、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ilIL-P-48647 13 m 7779706 0322874 T m P Llc a, .4 mto ma, lic li a s to -FI 3 u c1 E4 O E *4 a rn O I-l a, !-I 5 pi Ai o -4 w a a, CI a to 2 a, al c c O -4 z z a, 82 a -4 c to 8 8 8 E 2 3 O PI 23 - L3 Q - n O h in Provided by IHSNot for ResaleNo reproduction or networking permitted withou

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1