ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf

上传人:bowdiet140 文档编号:446463 上传时间:2018-11-16 格式:PDF 页数:7 大小:245.60KB
下载 相关 举报
ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E  M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf_第1页
第1页 / 共7页
ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E  M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf_第2页
第2页 / 共7页
ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E  M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf_第3页
第3页 / 共7页
ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E  M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf_第4页
第4页 / 共7页
ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E  M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-P-50357 (3) = 9999906 L9BB78b 139 = I INCH-POUND I MIL-P-50357 (AR) AMENDMENT 3 15 August 1994 SUPERSEDING AMENDMENT 2 30 September 1974 MILITARY SPECIFICATION PROJECTILE, 60MM H.E., M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL) This Amendment forms a part of MIL-P-50357 (AR), dated 30 September 1969

2、, and is approved for use by the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 * 2.1, Delete “MIL-A-2550 . . .I in its entirety. Delete “MIL-1-6868 . . .I in its entirety. Add “MIL-A-48078 - Ammunitio

3、n, Standard Quality Assurance Provisions, General Specifications For“ Under heading “DRAWINGS“ delete “Munitions Command“ and substitute “U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) Beneath the heading described above add: “7548319 - Box, Fiberboard Ammunition for Interpl

4、ant Shipment of Projectiles, Empty“ Delete “MIL-STD-109.“ in its entirety. Delete “MIL-STD-1235.“ in its entirety. After “MIL-STD-1169 . . .I add, “MIL-STD-1949 - Inspection, Magnetic Particle“ Delete “Publications PA-PD-792 Equipment, Testing or Measuring for Ammunition Items“ 1 of 7 AMSC N/A FSC 1

5、310 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (3) m 999990b L988787 O75 m MIL-P-50357 (AR) AMENDMENT 3 * 2.2, Delete “ASA-B.46.1“ and substitute “ANSI

6、B46.1“. Delete “(Application for copies.)“ in its entirety and substitute, “(Application for copies should be addressed to: American National Standards Institute (ANSI), 1430 Broadway, New York, N.Y. 10018.)11 PAGE 3 ik Add new paragraph 3.3.2 as follows: “3.3.2 Hvdrostatic test. Each.projectile bod

7、y shall be able to withstand a hydrostatic test load of 7500 +500 psi without cracking, leakage, rupture or permanent deformation when tested in accordance with 4.3.3.1.4.“ PAGE 4 k 3.7.2, Delete “and shall be in accordance with the provisions of MIL-A-2550. 4.1, Add to the end of the paragraph: “Un

8、less otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification.“ * 4.1.1, Delete in its entirety and substitute: “4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. for

9、th in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government f

10、or acceptance comply with all requirements of the contract. Sampling inspection, as a part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective material, either indicated or actual, nor does it

11、 commit the Government to accept defective material.“ The inspection set 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (AR) AMENDMENT 3 PAGE 5 * 4.1.2, Delete in its entirety. t 4.2, Delete section in its entirety and substitute: “4.2

12、 Classification of inspections. The following types of inspections shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection 4.2.1 First article inspection. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation

13、 in accordance with the provisions of MIL-A-48078, 4.3.2.2, 4.3.2.3, 4.3.3.1.2.1 and 4.3.4 herein. The first article sample shall consist of: Four tensile specimens (total) from two bodies (see 4.3.3.1.2.11, ten unpainted bodies (see 4.3.2.2) and thirty painted body assemblies. Five of the painted a

14、ssemblies shall be subjected to the salt spray test and the remainder shall be inspected in accordance with 4.3.2.3 and forwarded for the proving ground tests. 4.2.2 Rejection. See MIL-A-48078.“ * 4.3, Delete section in its entirety and substitute: “4.3. gualitv conformance inspection. 4.3.1 Lots 4.

15、3.1.1 Inspection lot formation. Inspection lots shall comply with the lot formation provisions of MIL-A-48078 and the following, as applicable: 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-50357 (3) = 9999906 I1988789 948 MIL-P-50357 (AR)

16、 AMENDMENT 3 PAGE 6 * 4.3.2.1, Delete in entirety and substitute: “4.3.2.1 Tool control dimension. Dimension marked tool control shall be gaged during First Article testing and after each 250 items produced on each machine in operation and after any tooling change. Where destruction of components is

17、 necessary to inspect these dimensions, measurements of the tool may be substituted provided the contractor has established correlation between the tool dimensions and the component dimensions prior to the start of production. The contractor shall be responsible for maintaining adequate surveillance

18、 to assure that drawing requirements are being met throughout the life of the tool. immediately be instituted by the contractor, whenever a defective tool control dimension is found and all material produced since the last successful inspection shall be rejected. Corrective action will PAGE 7 * 4.3.

19、2.2, Critical 1, delete in its entirety and substitute new critical 1 . . .Hydrostatic test . . .Gage/4.3.3.1.4“. Delete Minor 202 in its entirety. PAGE 8 * 4.3.2.3, Critical 1, delete It (probe light) “. Add “Special a . Hydrostatic test stamp missing .loo% . . .Visual“. Delete Major 103 in its ent

20、irety and substitute: *t103 . Minor diameter of large thread, max. for min. length . . .Gage“ Delete Major 108 in its entirety. Add Major 114: “114 . Length of minor diameter of large thread, max. . . .Gagett * 4.3.2.4, after “Packed carton“ add: “Drawing 7548319“. 4 Provided by IHSNot for ResaleNo

21、reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (3) m 9979906 LB8790 bbT m MIL-P-50357 (AR) AMENDMENT 3 PAGE 9 4.3.2.5, after “Packed carton“ add: “Drawing 7548319“. PAGE 10 * Add new paragraph 4.3.3.1.4 as follows: “4.3.3.1.4 Hydrostatic test. After final machining, ea

22、ch projectile shall be hydrostatically tested to determine compliance with 3.3.2. The equipment used shall be capable of performing the test accurately and consistently. During the test, the pressure will be applied until the required pressure is reached and held for five (5) seconds, minimum. The e

23、quipment shall be calibrated prior to the start of each days operation and at intervals of not over four (4) hours of continuous operation. It shall also be calibrated prior to restarting the operation after a layoff of three hours or more. If it has been found that the equipment is out of calibrati

24、on in such a direction that the pressure was actually lower than the minimum requirement, the bodies tested since the last satisfactory calibration shall be retested after the calibration error has been corrected. Projectile rupture, cracking, leakage, or bulging during the test shall be cause for r

25、ejection of the body. The test fixture shall not restrict the projectile body from expanding longitudinally or radially under pressure. barriers should be installed to shield operators from metal fragments which may come from defective projectiles that fail the test. If threads are engaged, the hydr

26、otest plug should be designed with a thread relief, to prevent loading of initial threads on the projectile. made of all hydrotest plugs after a projectile is blown during testing. destruction of acceptable items.“ Protective Examination should be Badly nicked or damaged plugs may cause * 4.3.3.2.1.

27、a, Delete “affect“ and substitute “effect“. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (3) = 9999906 198879L 5Tb W MIL-P-50357 (AR) AMENDMENT 3 PAGE 11 4.3.4, Delete section in its entirety and substitute the following: * “4.3.4 Pr

28、ovinq sround tests. 4.3.4.1 Maximum averase pressure test. (See 4.4.4.1) Five (5) projectiles shall be tested from the First Article Sample, from each of the first three (3) production lots and from three (3) consecutive lots when a new mill heat of steel is introduced into production. However, any

29、lot may be subjected to this test, retested, or testing may be reinstituted when so directed by the procuring contracting officer . 4.3.4.2 Service pressure test. (See 4.4.4.2) Twenty (20) projectiles shall be tested from the First Article sample, from each of the first three (3) production lots, an

30、d from three (3) consecutive lots when a new mill heat of steel is introduced into production. However, any lot may be subjected to this test, retested, or testing may be reinstituted when so directed by the procuring contracting officer . PAGE 12 * 4.3.5, Add “See 6.4“ at the end of the paragraph.

31、PAGE 13 4.4.1.2, Second line, change “Four Tension Test Specimens“ to “TWO Tension Test Specimens. I PAGE 14 * 4.4.4.2, First sentence, delete “for comparison with an equal number of rounds from a reference lot“. Second sentence, delete in its entirety. * 5.1, At the end of the sentence add “and Dra

32、wing 7548319“. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (AR) AMENDMENT 3 PAGE 14 (Contd) * 6.4, Add new paragraph as follows: “6.4 Submission of inspection equipment desiqns for approval. See paragraph 6.2.3 of MIL-A-48078. Submi

33、t - designs as required to-: Research, Development and Engineering Center (ARDEC), ATTN: SMCAR-QAT-I, Picatinny Arsenal, NJ 07806-5000. This address will be specified on the Contract Data Requirements List, DD Form 1423, in the contract.“ Commander, U.S. Army Armament The margins of this amendment a

34、re marked with an asterisk to indicate where changes (additions, modifications, corrections, deletions) from the previous issue were made. convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. contractors are cautioned to evaluate the requiremen

35、ts of this document based on the entire content irrespective of the marginal notations and relationships to the last previous amendment. This was done as a Bidders and Custodian : Army-AR Preparing Activity: Army-AR (Project 1310-0558) 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1