1、-.- MIL-P-50398 13 U 979990b 0327001) 4 M I MIL-P-50398 (AR) 18 May 1979 MILITARY SPECIFICAT ION PROJECTILE, 165MM, TP M624, METAL PARTS This specification is approved for use by the US Army Armament Research and Development Command, Department of the Army, and is available for useby all Departments
2、 and Agencies of the Department of Defense. 1.1 This specification covers Projectile, 165MM, TP, M624 Metal Parts . 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal form a part of this specification to the extent specif
3、ied herein. SPECIFICATIONS FEDERAL PPP-F-320 Fiberboard, Sheet Stock and Cut Shapes PPP-B-636 Box, Fiberboard M I LI TARY MIL-1-6868 Inspection Process, Magnetic Particle MIL-A-48078 Ammunition, Standard Quality Assurance Provisions, General Specification For MIL-C-50413 Cartridge, 165MM, TP, M623 L
4、oading, Assembly and Packing s- Y. FSC: 1320 B.ndiCW commenia (Wommendrtiong miditiorus, ddetioni) and my pertinent data which may be of UM in improving thin doeument grease, rust, corrosion or other foreign matter. 3.8.4 Rotating band damage.-The rotating band after machining shall be prgtected fro
5、m being nicked, burred or otherwise damaged 1 I during subsequent handling and preparation for shipment. 3.8.5 yainting and marking.-Painting and marking shall be applied in accordance with the applicable drawings and specifications. body shall be covered in a manner such as to preclude the applicat
6、ice of paint to these surfaces. The rotating band and threads of the projectile 4. QUA b. Discontinuities should not be of a depth greater than ten percent of the wall thickness at the location of the dis con t inu i ty 25 Provided by IHSNot for ResaleNo reproduction or networking permitted without
7、license from IHS-,-,-4- MIL-P-50378 13 m 777770b 0327027 7 m MIL-P-50398 (AR) 6.6 Proving ground test summary Sample First Phase Article Perf or- mance 25 25 Over- press Ure *Sample size for fi metal parts. Custodian : ARMY-AR Size Production Requirement Samplinq Procedure .lo* Safety 4.4.3.4.1 4.5.
8、5.3 TID (Info) 4.5.5.1 10* . Safety 4.4.3.4.2 4.5.5.3 Recover y 4.5.5.2 rst three lots shall be twenty-five projectile Preparing Activity: ARMY-AR Project Number : 1320-A495 *US. GOVERNMENT PRINTING OFFICE: 1979-603-02213424 26 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-