ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf

上传人:eveningprove235 文档编号:446934 上传时间:2018-11-16 格式:PDF 页数:18 大小:600.38KB
下载 相关 举报
ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf_第1页
第1页 / 共18页
ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf_第2页
第2页 / 共18页
ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf_第3页
第3页 / 共18页
ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf_第4页
第4页 / 共18页
ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf_第5页
第5页 / 共18页
亲,该文档总共18页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-P-70675(AR) 23 JULY 1988 MILITARY SPECIFICATION PONER SUPPLY ASSEMBLY, FOR MINES, M718Al/M7 4l.A1, SYSTEM This specification is approved for use within U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SC

2、OPE 1.1 Scope. This specification contains requirements and provides Quality Assurance provisions for the fabrication of parts, assembly and packing of Power Supply Assembly used in the M718Al/M74lAl Mines, Electronic Assembly. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specification an

3、d standards. The following documents of the issue in effect on date of invitation for bids or request for proposals, from a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Def

4、ense Index of specifications and Standards (DoDiSS) and supplement thereto, listed in the solicitation. SPECIFICATIONS MILITARY MIL-S-45743 - Soldering, Manual Type, High Reliability MIL-A-48078 - Ammunition, Standard Quality Assurance Electrical and Electronic Equipment. Provisions, General. Specif

5、ications For. STANDARDS MIL-STD-105 - Sampling Procedures and Tables For Inspection By Attributes. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Impraving this document should be addressed to: Commander, U.S. Army Arrnament,Munitions and Ch

6、emical Command, Attn. AMSMC-QA. Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. 1 1 OF 18 A?SC N/A FSC 1345 DISTRIBUTION STATEMENT A. Approved for public release; d

7、istribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I t MIL-P-70675 13 W 777770b 035bb71 7 W MIL-P-70675 (AR) MIL-STD-202 - Test Methods for Electronic and Electrical MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1169 - Pac

8、kagingr Packing and Marking For Shipment Component Parts. Of Inert Ammunition Components. 2.1.2 Other Government documents, drawings, - and publications. 1-1_ The following other Government documents, drawings and publications form a part of this specification to the extent specified herein. Unless

9、otherwise specified, the issues shall be those in effect on the date of the solicitation. -.-.- DRAWINGS US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) 9287159 - Molding, Power Supply 9342580 - Power Supply Assembly (Copies of specifications, standards, drawings and publicatio

10、ns required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the Contracting Officer) . 2.2 - Order -_ .- . - of -L arecedence. I .- - -.- .-.-.- In the event of a conflict between the text of this specification and

11、 the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtaine

12、d. 3. REQUIREMENTS 3.1 _l_l-.- Materials. - Materials shall be in accordance with the 3.2 Components _I_.-._II_ and assemblies. -I The components and assemblies applicable drawings and specifications. shall comply with all requirements specified on drawing 9342580 and 9287159 with al1 requirements s

13、pecified in applicable specifications and standards. 3.3 Electrical - requirement. 3.3.1 l-l_-ll- Non-activated voltage. Each battery cell shall be unactivated and measure less than O05 volts. 3.3.2 Shortingbar - -I.- resistance. The shorting bar and connector assembly shall have less than 0.8 ohm r

14、esistance measured between , the terminals. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- _ MIL-P-70675 13 m 7979906 035bb72 9 M MIL-P-70 67 5 (AR) 3.4 Battery lead weld sul1 test. The battery assembly lead welds shall not fail or show any evide

15、nce of tearing or breaking when the leads are subjected to a five (5) pound plus two (2) pounds pull. 3.5 Battery lead weld integritx. The battery assembly lead welds shall not show any evidence of fracture, crack or any damage to the battery case (hole in case). 3.6 Soldering. 3.6.1 - Shorting bar

16、and connector assembly solder -.-L. workmanshin Soldering of the shorting bar and connector assembly shall be in accordance with MIL-S-45743. . 3.6.2 Solderability. The power supply assemblies ribbon leads shall comply with solderability requirements of MIL-5-45743. 3.7 First article inspection. Whe

17、n specified in the contract or purchase order, a sample shall be subjected to first article inspection in accordance with technical provisions herein. (See 4.3) 3.8 Workmanship. All parts and assemblies shall be fabricated and finished in a thorough workmanlike manner and all manufacturing processin

18、g and assembly operations shall be correctly performed. All parts shall be free from chips, dirt, grease, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the part be contaminated by the cleaning agents. All marking and stamping shall

19、 be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of a1 inspecstion requirements as specified herein. Except as otherwise specified in the co

20、ntract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification wher

21、e such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Unless otherwise specified herein, or in the contract, the provisions of MIL-A-48078 shall apply, and are hereby made a part of this detail specification. 3 Provided by IHSNot for ResaleNo rep

22、roduction or networking permitted without license from IHS-,-,-MIL-P-70b75 13 m 77777Ob 035bb73 O m 0 a* MIL-P-70675 (AR) 4.1.1 Responsibility Cor compliance. All items must meet all requirementcof section 3 and 5. The inspection set forth in this specification shall become a part of the contractors

23、 overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for accestance comply with all requirements of the contract. Sam

24、pling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item. a. First Ar

25、ticle Inspection b. Quality Conformance Inspection 4.3 First article inspection. 4.3.1 -111 Submission. The contractor shall submit a first article sample, as designated by the Contracting Officer, for evaluation in accordance with the provisions of 4.3.2 and 4.3.3. The first article sample shall co

26、nsist of the parts/assemblies listed below in the quantities indicated. Part Description Drawing Quant?arts. In place of normal sanpling an6 insGections associated with the Classification of Defects, and after a curing time for the parts has been approved (See Note 1). The Contractor may, itith the

27、appraval of the Government, select a sample of three (3) parts (as molded) from each cavity to be fully inspected dimensioaally (all dimensions on drawing) t3 qualify a new or reworked cavity for use iii production. The molded ?arts shall carry the individaal cavity identification. As a control of e

28、ach cavity during production, the above quantity of parts Erom each cavity shall be inspected for at least the defects listed in 4.4.2.1 after continuous production of each 5,000 parts or at the end of each week, whichever occurs Eirst. Of the three (3) samples, one (1) sample shll be the last part

29、produced. If any defective parts are found during qualification of the cavity, the cavity producing the defective part will not be used in production. If any defective paris are found when inspection is performed for the control of the cavity, the cavity producing the efective part shali be removed

30、from 2roduction. Further, that portion of 2roduction since the last control check shall be returned to the contractor for inspection or each se2xate type of defect according to MIL-STD-105, using an AQL of 0.40 percent for each major defect and an AQL of 0-65 percent for each minor defect. All cavit

31、ies removed fom production because OE some fault, may after reworking, be returned to sroduction sroviding they pass the qualification test above. The contractor may request a change of inspection frequency groviding he ?resents objective evidence to the contracting officer to substantiate the reque

32、st. Contractor design of gages and test equfpent required to perform the inspectians listed herein shall be forlrarded to Commander, AMCCOM, Picatinny Arsenal, New Jersey 07806-5000, ATTN: MGMC-QAT-I (D) for approval prior to manufacture of equipment. The noted subparagraphs identify those items and

33、 minimum inspections subject to the requirements of this paragraph. 3 NOTE 1: In establishing a curing time, dimensionally check ten (10) parts from each cavity at periodic intervals (e.g. every 30, 60 etc. mins.) until dimensional stability is attained. The curing time will be from the time the par

34、t comes out of the mold until dimensional stability is attained. The inspection data used in determining the curing time shall be sent to AMCCOM, Picatinny Arsenal, New Jersey 07806-5000, ATTN: ANSIC-QAT-M (D). When a new cavity is substituted, an old cavity reworked, or the material or cycle time c

35、hanged, a new curing time shall be established and approved. $ 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-78675 (AR) 4.5 Methods of inspection. 4.5.1 Non-activated voltage. Each battery cell of the power supply assembly shall be checked

36、 for conformance with the requirements of 3.3.1 when measured by a 10 megohm input impedance voltmeter. (Non-destructive test) 4.5.2 Shorting bar resistance. The continuity-resistance of each shorting bar circuit shall be measured, using an approved ohmmeter. Observation shall be made for compliance

37、 with requirements of 3.3.2. (Non-destructive test) 4.5.3 Battery lead pull test. A five (5) pound plus two (2) pound force shall be applied to each lead in a direction parallel to the lead using approved test equipment. Observation shall be made for comsliance with requirements of 3.4. 4.5.4 Batter

38、y lead weld integrity. Visual examination of the lead welds shall be performed at a minimum of lox magnification. Observation shall be made for compliance with the requirement of 3.5. 4.5.5 Shorting bar and connector assembly solder workmanship. -_I_ Soldering and inspection shall conform to MIL-S-4

39、5743. Visual examination shall be performed at a minimum of lox magnification. Observation shall be made for compliance with requirements of 3.6.1. (Non-destructive test) subjected toty procedure of MIL-S-45743. Observation shall be made for compliance with requirements of 3.6.2. (Des truc tive test

40、) 4.5.6 Solderability. The power supply assembly leads shaZ1 be O 5. PACKAGING 5.1 Preservation and packaginq. The Power Supply Assembly shall be preserved and packaged in accordance with MIL-STD-1169, level C. 5.2 Packing. Packing of the assemblies shall be in accordance with MIL-STD-1169 level C.

41、5.3 Marking. Marking shall be in accordance with MIL-STD-1169. Lotting shall comply with MIL-STD-1168. 5.4 Shippinq. When shipments from more than one lot are shipped as a carload, each lot shall be kept separate than the division between lots clearly indicated to prevent mixing of lots in transit.

42、17 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4 - MIL-P-70675 13 H 7979706 0356707 7 H 6. NOTES 6.1 Intended use. The component(s) covered by this specification is intended for use in the M718Al/M74lAl Electronic Assemblies. 6.2 -.-. Ordering da

43、ta. II.- See Section 6.1 of MIL-A-48078. 6.3 *-I_- Submission of inspection equipment designs for approval. See MIL-A-48078. Submit equzment designs as required, to Commander, ARDEC, aTTN: AMSMC-QAT-I (Dj , Picatinny Arsenal, New Jersey 07806-5000. This address will be specified on the Contract Data

44、 Requirements List, DD Form 1423 in the contract. Unless otherwise specified, data item DI-R-1714 will apply. 6.4 Submission -l_l of results of contractor-conducted examinations -I- and tests. Unless otherwise specified by the Contracting Officer, the contractor shall forward requested records of ex

45、aminations of tests to Commander, ARDEC, ATTN: AMSMC-QAT-M (D) , Picatinny Arsenal, New Jersey 07806-5000. 6.5 Distribution of ammunition data cards. Distribution of data carils shall include the following: Commander, ARDEC, ATTN: AMSMC-QAT-I4 (D), Picatinny Arsenal, New Jersey 07806-5000. 6.6 Drawi

46、ngs. Drawings listed in Section 2 of this specification under the heading U.C. Armament Research, Development and Engineering Center (ARDEC)# may include drawings prepared by, and identified as Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal (ARRADCOM) or Picatinny Arsenal drawings. Technic

47、al data originally prepared by these activities is now under the cognizance of ARDEC. 6.7 Subject -I term (key word) listings. Mines, AT Power Supply Assembly Pull Test, Battery Lead Weld Custodian : Army-AR Preparing activity: Army-AR (Project 1345-A 390) 18 *U. S. GOVERNMENT PRINTING OFFICE: 1989-604-0331 10079 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1