1、I INCH-POUND I EiLIGT-45169E(AL) -1 4 January 1993 MILITARY SPECIFICATION This mtmnt form a part of ML-T-45169E, dated 17 January 1992, and is appraved for use by the Us Anny Anmmnt Research, Developmt and Engineering Center, Department of Army and is available for use by all Deparhrients and Agenci
2、es of the Deparhrient of Defense PAGE 1 Beneficial comrrrrts block, line 4: change “SMCAR-ESF-S“ To 5M2AR-m-P“. PAGE 6 3.6.5,: relief valve. the tank, when the tank reaches a pressure in the range of 135 to 165 pig. The safew pressure relief valve shall autariatically reset itself at a pressure of n
3、ot less than 75 pig.“. Delete 3.6.5 in its entirety am3 substitute: “3.6.5 Safety valve. The tank shall be fitted with a safety pressure The safety pressure relief valve shall release the pressure in PAGE 9 4.6.4,: Delete 4.6.4 in its entirety and substitute: “4.6.4 Safety pressure relief vaive test
4、. This test shall be performed on each lot off dist;rialtian AMCC N/A Licensed by Information Handling ServicesMIET-45169E -1 4.6.7,: pbd the follawing paragraph: “4.6.7 Capcity and weiqht test. These tests shall be perfoinied only during first article testing. water thraigh the most convenient open
5、ing. measure the full content of the fluid. least 8.5 gallons, Weigh the tank assanbly -lete with hose, gauges, fittings, chucks, and handles. The weight of the tank assanbly shall not exceed 42 pounds. The weight scale shall be accurate within 1 percent. Failure of the tank capacity to masure at le
6、ast 8.5 gallons or meet the weight -ts of 42 pounds or less shall be cause for rejection.“. Canpletely fill the interior of the tank with Bnpty the water fran the tank and aie fluid content shall masure at PAGE 10 5.1.1*3,: Delete 5.1.1.3 in its entirety and substitute: “5.1.1.3 nit Packs. The unit
7、method of protection for the basic tank shall confom to mthcd I of MIGP-116. . Ilie gage crystal shall be cuvmx with a piece of fiberhmd conforming to PPP-F-320, type CF, class weather-resistant, variety SW, grade optional. with tap conforming to PPP-T-60, type optional. valve, air hose and safety v
8、alve shall mmin connect& to the basic unit. Wrap parts with cushioning mterial conforming to PPP-C-843, type II. all pressure in tank and seal all openings with tap or plastic cap-plugs mnfoming to PPP-T-60, type IV or MIGC-5501, resmvely. an attached ccsnponents in a fiberboard box conforming to PP
9、P-E!-636, class weather-resistant. aie tank shall be brad inside the unit container with fiberboard of PPP-F-320 fod into pads or cut shapes. Any technical publicaticms furnished shall be packaged in accordance with mthod IC-1 and placed inside the unit container. II. sec3ure the fiberboard in place aie pressure gage, filler Release Place the tank custodians ArrrsT-x PREPARING ACTMTY: Project No. 4940-A652 Army-& User activity Army-m 2 Licensed by Information Handling Services