ARMY MIL-T-45308A (4)-1976 TANK MAIN BATTLE 105MM GUN M60《M60型坦克105MM主战用枪》.pdf

上传人:progressking105 文档编号:448567 上传时间:2018-11-16 格式:PDF 页数:3 大小:119.50KB
下载 相关 举报
ARMY MIL-T-45308A (4)-1976 TANK MAIN BATTLE 105MM GUN M60《M60型坦克105MM主战用枪》.pdf_第1页
第1页 / 共3页
ARMY MIL-T-45308A (4)-1976 TANK MAIN BATTLE 105MM GUN M60《M60型坦克105MM主战用枪》.pdf_第2页
第2页 / 共3页
ARMY MIL-T-45308A (4)-1976 TANK MAIN BATTLE 105MM GUN M60《M60型坦克105MM主战用枪》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、1 - MIL-T-4530BA (Lo 23 = 7779906 0396502 T W c-23- so MIL-T-453EA (GRD) AMEND1mm 4 10 December i976 S WER SED1 NG AMENDKW 3 . 18 May 1973 HILITAFlY SPECIFICATION TANK, MAIN BATTLE, 105MM GUN, M60 This amendment forms a part of Military Specification MIL-T-k5308A(ORD), dated 27 December 1960. Page 1

2、, paragraph 2.1, line 2: Page land 2, paragraph 2.1: After “bids“ add “cr request for proposal,“ Delete the following documents and their titles: “MIL-S-10379; MIL-P-13525 i Mn-V-45349.“ Add the following documents in their proper order: “mL-P-514 - Plates, Identification, Instruction and Marking, B

3、lank. Requirements for Equipnent.“ MIL-STD-461 - Electromagnetic Interference Characteristics Page 3, paragraph 3.4: Page 4. Add paragraph: Delete, “and all applicable provisions of Specifi- cation MIL-V-45349.“ “3.4.7.3 Fuel shut-off valve. With the engine operating at 2000 to 2200 RPM, the engine

4、shall stop within five minutes frm the time the manual fuel “shut-off“ handle is placed in the “OFF“ position.“ Page 4, paragraph 3.5.1: Add the following sentence to end of paragfaph: “Fuel/water separator and primary fuel filter shall be bled of air by removing each respective bleed plug ani by op

5、erating the in-tank fuel pump. After air is bled, replace the bleed plugs.“ FSC-2350 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- -. MIL-T-4530A (4) 23 9777706 0376503 L U Page 10, par-aph 3.7.3.18. Delete and substitute: the vehicle is canted or

6、 pitched on slopes up to i5 degrees, the turret shall remain stable as specified In 3.7.3.U. of gun laying un a 0.25 mil stationary target as specified In 3.7.3.15, table II, except time limitation need not be met. capsble of traversing the turret at rate of 0.5 to 65.2 mils per second. chatter shal

7、l be allowed only when turret unbalance tends to cause turret rota- tion in the same direction of manual traverse. mance on level terrain shall not be affected In any manner a8 a result of vehicle operation on 10pe.“ 3.7.3.18 Turret and gun control systems, operaton on slopea. When n !he gun control

8、 system shall be capable The gun control system shall be Turret The gun control system perfor- ir Page 13, paragraph 3.8: Delete and substitute: “3.8 Electromagnetic inbrference. The vehicle shall conform to the electromagnetic interference requirements of MI-slD-461 for tactical equip- ment. “ Page

9、 13, paragraph 3.9.3: Delete and stibstitute: “3.9.3 Name, shipping and service data plates. Unless otherwise speci- fied (see 6.2), data plates shai conform to type III of MIL-P-514, with infor- mation 8s specified on the plate drawings.“ Page 2&. Add to Table M: Title “Fuel shut-off valve checkw P

10、aragraph No, 4,7.1.13 Place of hufacture “X“ Government Proving Ground nXn.- Page 24, table M: magnetic interference test.“ Delete “Radio suppression test“ and substitute “Electro- - Page 31. Add paragraph: “4.7.1.13 Fuel shut-off valve check. To deter- mine conformance to 3.4.7.3, with the engine o

11、perating at specified RPM, the fuel shut-off handle shall be placed In the “OFF“ position. engine stop operation shall be as specified.“ The time for the Page 34, paragraph 4.7.3.16: Delete and substitub: “4.7.3.16 Electromagnetic interference test, To determine conformance to 3.8, the vehicle shall

12、 be tested in accordance with the applicable provisions of MIL-STD- (see 6.4).“ Page 38, -8ph 6.4: Delete and substitute: “6.4 Electromagnetic interference test. The contracting officer should submit a copy of the report(s) required in 4.7.3,16 to the Cummanding General, U. S. Army Electronlcs Comma

13、nd, ATTN: MEL-RD-GF, Fort Monmouth, New Jersey 07703, for approval.“ - . . - . . . . . page2 of 3 pages Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-h5308A( ORD) AMENDMENT 4 Page 38, add the follaring paragraph: “6.5 International standardiz

14、ation agreement. Certain provisions (see 3.6.8) of this specification ere the subJect of international etanderdization agreement NAl STANAG 2805-A (Edition 3). When amendment, revision, or cancella- tion of this specification is proposed which will affect or violate the inter- national agreement con

15、cerned, the preparing activity will take appropriate recon- ciliation action through international standardization channels, including depart- mental standardization offices, if required .“ Page 38: Delete Notlce paragraph in its entirety. c us w ian : Army-AT -. .- *U. S. GCWERNMEM PRINTING OFFICC W77-703.020/981 Prepring activity: Army - AT Project No. 2350-A275 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1