ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E M261《M261型2 75英寸烈性炸药火箭弹头》.pdf

上传人:towelfact221 文档编号:449171 上传时间:2018-11-16 格式:PDF 页数:6 大小:182.24KB
下载 相关 举报
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第1页
第1页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第2页
第2页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第3页
第3页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第4页
第4页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-W-63468A (AR) AMENDMENT 7 25 April 2000 SUPERSEDING AMENDMENT 6 13 November 1996 MILITARY SPECIFICATION WARHEAD, 2.75 INCH ROCKET, H.E.: M261 This amendment forms a part of MIL-W-63468A(AR) , dated 7 October 1983, and is approved for use by the U.S. Army Armament Research, Development, and Engin

2、eering Center and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Paragraph 2.1.1, SPECIFICATIONS, MILITARY, Add: “QAC-1415 - Rocket, 2.75 Inch/Hydra-70: Assembly, Packing and Testing”. Bottom of page: Add: “DISTRIBUTION STATEMENT A. Approved for public rele

3、ase; distribution is unlimited.” PAGE 2 (a) Paragraph 2.1.2: Delete section from MISSILE INTERIM .I to I. . . Alabama 35898. ) I. (b) Delete references to specification MIS-30862 and substitute QAC-1415. Make this substitution wherever it appears in this document. (c) Paragraph 2.1.2, Product Drawin

4、gs: Add: “12937865 - Packing and Marking for Container, Metal, for 2.75 Inch Rkt., M261/M267”. msc N/A 1 of 6 FSC 1340 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-M

5、IL-W-63468 (AR) Amendment 7 (d) Paragraph 2.1.2 : PUBLI CATIONS ITOP-1-2-601 (a) Delete paragraph Add : - Laboratory Inspection Schedules, International Test Operations Pro- cedures (ITOP) , TECOM“. PAGE 3 3.7. (b) Paragraph 3.9 : Delete “components“ and substitute “major components, assemblies, and

6、 subassemblies, such as:. pusher plate, M73 Grenade, flat flex lead, lead tape, auto jettison retaining rings, etc. I PAGE 4 Paragraph 3.16, first sentence: Delete and shall comply with the ballistic test as specified 4.5.8. PAGE 7 TABLE I. First Article Inspection: (a) Delete “102“ and Substitute “

7、108“ (four places). (b) Note (a) : Delete “leakage tests (6) and substitute “non-environmental (6) If. (Cl Delete Note (b) and substitute “The first article ballistic sample, with units from secured cargo (361, helicopter vibration (19) , and leakage test (6) , shall be rejected if two or more paylo

8、ads fail to eject, or 34 more grenades fail to function.“ PAGE 8 Paragraph 4.4.1.d. at the end of the sentence, add “except no more than six lots of warhead cases may be used within each individual warhead case interfix number from one manufacturer“. Paragraph 4.4.1 , last line : Delete “4,000 .“ an

9、d substitute 5 , 000. “ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-63468 (AR) Amendment 7 PAGE 10 Paragraph 4.4.2.2: (a) Critical category: Delete None defined“ and substi- tute Critical defect 1: Pulled arming pin (b) 100% 3.2 Gage“ . (b)

10、 Add Major defect 105: Presence of correct auto jetti- son retaining rings 100% 3.2 Visual (c)“. (c) Add Notes (b) and (cl: (b) To be performed just prior to grenade stacking. (c) No. 9 retaining ring is different from No. 1 - No. 8 retaining rings and it is color-coded. Inspection of the retaining

11、rings shall be performed after stacking, but before insertion of grenades into the warhead case. Count the number of parts (Retaining Ring, Auto Jettison No. 9 (12561496) and No. 8 (12561951) at the beginning and end of each shift. Check the difference of the two figures to ensure that it agrees wit

12、h the amount of grenade assemblies produced during the s hi f t . “ PAGE 11 Paragraph 4.4.2.3: (a) Major defect 109: Delete and substitute: “Leakage test 6 - 3.16 4.5.6“. (b) Add Major defect 110: “Ballistic test 36 - 3.18 4.5.8“ . (c) Add 4.4.2.4 (included as Page lla) . PAGE 12 (a) Paragraph 4.5.1

13、, second sentence, Delete and substitute: “Verify that all major components , assemblies , and sub- assemblies, such as: pusher plate, M73 Grenade, flat flex lead, lead tape, auto jettison retaining rings, etc., are present and properly placed, that all grenades are safe, and that no foreign materia

14、l is present.“ (b) Paragraph 4.5.2 I second sentence : Delete “2.75 Inch Rocket Motors“ - and substitute “2.75 inch MK66 rocket motors“. (c) Paragraph 4.5.2 : Delete “box“ and “boxes“ and substitute “box or metal container“ or “boxes or metal containers“ where applicable (8 places). Provided by IHSN

15、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-d o - m cd 2 2 5 .C ? -? m m Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-63468A (AR) Amendment 7 PAGE 13 Paragraph 4.5.2, 2nd last paragraph, line 3: After “c

16、ontainers“ add “(fiber containers are not required if fastpack is used)“. PAGE 14 (a) Paragraph 4.5.2, last paragraph, line 3: Delete “intact and securely in place).“ and substitute “intact and not manually removable) . (b) Paragraph 4.5.3, third paragraph: Delete “The packed shipping boxes . . . Re

17、sonance testing does not apply.“ and substitute The packed shipping boxes or metal containers shall be subjected to the vibration test in accordance with paragraph 4.1, and with Figures on pages: 8-3, B-4, and B-5 (40 min./axis) ; B-6, B-7, and B-8 (32 min./axis) , International Test Operations Proc

18、edures (ITOP) , 1-2-601, dated O1 March 1988. Resonance testing does not apply.“ PAGE 16 Paragraph 4.5.6: (a) Second line: (i) Delete “512.1“ and substitute “512,. (2) Delete “for first article testing only.“ (b) End of paragraph, Add: To inspect the cargo compart- ment, unthread the base plug in th

19、e rear of the warhead, and remove the nose cone and base nose cone assemblies. If one or more warheads fail to meet the requirement, the test shall be considered a failure. This test is to be conducted for first article testing and until two consecutive lots have complied with the acceptance criteri

20、a specified. After satisfying this requirement, the leakage test shall be performed on every subsequent third lot only. Should the lot fail the acceptance criteria, the contractor shall be required to return to the two consecutive lot procedures above.“ Paragraph 4.5.8: Delete and substitute: “4.5.8

21、 Ballistic test. The tactical requirement for the warhead is to provide proper delivery of M73 grenades into target areas from 1000 to 6000 meters from the launching heli- copter. Performance shall be evaluated by ground launching a sample of 36 M261 warheads, assembled with MK66 Mod 1 or Mod 2 moto

22、rs, from any of the compatible launchers into a permanently contaminated field. Twelve warheads shall be conditioned at -5OO + 5O F, 12 warheads at +70 k 15O F, and 12 warheads at +150 - 5O F for a minimum period of 8 hours. Firing and fuze Provided by IHSNot for ResaleNo reproduction or networking

23、permitted without license from IHS-,-,-MIL-W-63468 (AR) Amendment 7 charging shall be accomplished by means of a Government- approved ballistic firing test set, using approximate fuze time settings to achieve airburst ranges of 1000, 3000, and 6000 meters. Time from launch to cargo ejection, and num

24、ber of grenade functions, shall be detected and recorded. If three or more payloads fail to eject, or 22 or more grenades fail to function, the lot shall be rejected.“ PAGE 19 Paragraph 6.3: Delete US Army Armament Research and Development Command, ATTN: DRDAR-QAF-I, Dover, NJ 07801.“ and substitute

25、 U.S Army Armament Research, Development, and Engineering Center, Attn: AMSTA-AR-QAC-S, Picatinny Arsenal, NJ 07806- 5000. “ The margins of this amendment are marked with vertical lines to indicate where changes to the previous amendment were made. This was done as a convenience only, and the Govern

26、ment assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the require- ments of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR Preparing activity: Army-AR . (Project 1340-1020) h Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • STAS 11657-1980 Simple way overhead conveyers with pressed chain UPRIGHT CURVES Typification《简单式压链轮式高架输送机 垂直曲线 分类体系 》.pdf STAS 11657-1980 Simple way overhead conveyers with pressed chain UPRIGHT CURVES Typification《简单式压链轮式高架输送机 垂直曲线 分类体系 》.pdf
  • STAS 11658-1980 Simple way overhead conveyers with pressed chain WHEELED WHIPSTOCK Typification《压链轮式转向器架空传送的简单方法 分类体系 》.pdf STAS 11658-1980 Simple way overhead conveyers with pressed chain WHEELED WHIPSTOCK Typification《压链轮式转向器架空传送的简单方法 分类体系 》.pdf
  • STAS 11659-1980 Simple way overhead conveyers with pressed chain ROLLER WHIPSTOCK Typification《简单方法的带加压链锁的架空输送机 辊转向器 分类体系》.pdf STAS 11659-1980 Simple way overhead conveyers with pressed chain ROLLER WHIPSTOCK Typification《简单方法的带加压链锁的架空输送机 辊转向器 分类体系》.pdf
  • STAS 11660-1980 Simple way overhead conveyers with pressed chain WHEELED STRETCHING DEVICES Typification《简单方法的带加压链锁的架空输送机 轮式拉伸装置 分类体系》.pdf STAS 11660-1980 Simple way overhead conveyers with pressed chain WHEELED STRETCHING DEVICES Typification《简单方法的带加压链锁的架空输送机 轮式拉伸装置 分类体系》.pdf
  • STAS 11661-1980 Simple way overhead conveyers with pressed chain ROLLER STRETCHING DEVICES Typification《简单式的带有压制的链传动轮拉伸装置的架空输送机 分类体系 》.pdf STAS 11661-1980 Simple way overhead conveyers with pressed chain ROLLER STRETCHING DEVICES Typification《简单式的带有压制的链传动轮拉伸装置的架空输送机 分类体系 》.pdf
  • STAS 11662-1980 Simple way overhead conveyerswith pressed chain CORNER DRIVE STATIONS Typification《简单方法的带加压链锁角传动站的架空输送机 分类体系 》.pdf STAS 11662-1980 Simple way overhead conveyerswith pressed chain CORNER DRIVE STATIONS Typification《简单方法的带加压链锁角传动站的架空输送机 分类体系 》.pdf
  • STAS 11662-1986 Chain overhead conveyers DRIVING STATIONS Main parameters《链架空输送机驱动站 主要参数 》.pdf STAS 11662-1986 Chain overhead conveyers DRIVING STATIONS Main parameters《链架空输送机驱动站 主要参数 》.pdf
  • STAS 11663-1980 Simple way overhead conveyers with pressed chain DRIVE STATION WITH TRACK Typification《简单式的带有压链传动站轨迹的架空输送机 分类体系 》.pdf STAS 11663-1980 Simple way overhead conveyers with pressed chain DRIVE STATION WITH TRACK Typification《简单式的带有压链传动站轨迹的架空输送机 分类体系 》.pdf
  • STAS 11664-1980 General use belt conveyers ELECTRODRUMS Typfication《普通带式输送机进行电镀 分类体系 》.pdf STAS 11664-1980 General use belt conveyers ELECTRODRUMS Typfication《普通带式输送机进行电镀 分类体系 》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1