ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E M261《M261型2 75英寸烈性炸药火箭弹头》.pdf

上传人:towelfact221 文档编号:449171 上传时间:2018-11-16 格式:PDF 页数:6 大小:182.24KB
下载 相关 举报
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第1页
第1页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第2页
第2页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第3页
第3页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第4页
第4页 / 共6页
ARMY MIL-W-63468 A (7)-2000 WARHEAD 2 75 INCH ROCKET H E  M261《M261型2 75英寸烈性炸药火箭弹头》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-W-63468A (AR) AMENDMENT 7 25 April 2000 SUPERSEDING AMENDMENT 6 13 November 1996 MILITARY SPECIFICATION WARHEAD, 2.75 INCH ROCKET, H.E.: M261 This amendment forms a part of MIL-W-63468A(AR) , dated 7 October 1983, and is approved for use by the U.S. Army Armament Research, Development, and Engin

2、eering Center and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Paragraph 2.1.1, SPECIFICATIONS, MILITARY, Add: “QAC-1415 - Rocket, 2.75 Inch/Hydra-70: Assembly, Packing and Testing”. Bottom of page: Add: “DISTRIBUTION STATEMENT A. Approved for public rele

3、ase; distribution is unlimited.” PAGE 2 (a) Paragraph 2.1.2: Delete section from MISSILE INTERIM .I to I. . . Alabama 35898. ) I. (b) Delete references to specification MIS-30862 and substitute QAC-1415. Make this substitution wherever it appears in this document. (c) Paragraph 2.1.2, Product Drawin

4、gs: Add: “12937865 - Packing and Marking for Container, Metal, for 2.75 Inch Rkt., M261/M267”. msc N/A 1 of 6 FSC 1340 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-M

5、IL-W-63468 (AR) Amendment 7 (d) Paragraph 2.1.2 : PUBLI CATIONS ITOP-1-2-601 (a) Delete paragraph Add : - Laboratory Inspection Schedules, International Test Operations Pro- cedures (ITOP) , TECOM“. PAGE 3 3.7. (b) Paragraph 3.9 : Delete “components“ and substitute “major components, assemblies, and

6、 subassemblies, such as:. pusher plate, M73 Grenade, flat flex lead, lead tape, auto jettison retaining rings, etc. I PAGE 4 Paragraph 3.16, first sentence: Delete and shall comply with the ballistic test as specified 4.5.8. PAGE 7 TABLE I. First Article Inspection: (a) Delete “102“ and Substitute “

7、108“ (four places). (b) Note (a) : Delete “leakage tests (6) and substitute “non-environmental (6) If. (Cl Delete Note (b) and substitute “The first article ballistic sample, with units from secured cargo (361, helicopter vibration (19) , and leakage test (6) , shall be rejected if two or more paylo

8、ads fail to eject, or 34 more grenades fail to function.“ PAGE 8 Paragraph 4.4.1.d. at the end of the sentence, add “except no more than six lots of warhead cases may be used within each individual warhead case interfix number from one manufacturer“. Paragraph 4.4.1 , last line : Delete “4,000 .“ an

9、d substitute 5 , 000. “ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-63468 (AR) Amendment 7 PAGE 10 Paragraph 4.4.2.2: (a) Critical category: Delete None defined“ and substi- tute Critical defect 1: Pulled arming pin (b) 100% 3.2 Gage“ . (b)

10、 Add Major defect 105: Presence of correct auto jetti- son retaining rings 100% 3.2 Visual (c)“. (c) Add Notes (b) and (cl: (b) To be performed just prior to grenade stacking. (c) No. 9 retaining ring is different from No. 1 - No. 8 retaining rings and it is color-coded. Inspection of the retaining

11、rings shall be performed after stacking, but before insertion of grenades into the warhead case. Count the number of parts (Retaining Ring, Auto Jettison No. 9 (12561496) and No. 8 (12561951) at the beginning and end of each shift. Check the difference of the two figures to ensure that it agrees wit

12、h the amount of grenade assemblies produced during the s hi f t . “ PAGE 11 Paragraph 4.4.2.3: (a) Major defect 109: Delete and substitute: “Leakage test 6 - 3.16 4.5.6“. (b) Add Major defect 110: “Ballistic test 36 - 3.18 4.5.8“ . (c) Add 4.4.2.4 (included as Page lla) . PAGE 12 (a) Paragraph 4.5.1

13、 second sentence, Delete and substitute: “Verify that all major components , assemblies , and sub- assemblies, such as: pusher plate, M73 Grenade, flat flex lead, lead tape, auto jettison retaining rings, etc., are present and properly placed, that all grenades are safe, and that no foreign materia

14、l is present.“ (b) Paragraph 4.5.2 I second sentence : Delete “2.75 Inch Rocket Motors“ - and substitute “2.75 inch MK66 rocket motors“. (c) Paragraph 4.5.2 : Delete “box“ and “boxes“ and substitute “box or metal container“ or “boxes or metal containers“ where applicable (8 places). Provided by IHSN

15、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-d o - m cd 2 2 5 .C ? -? m m Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-63468A (AR) Amendment 7 PAGE 13 Paragraph 4.5.2, 2nd last paragraph, line 3: After “c

16、ontainers“ add “(fiber containers are not required if fastpack is used)“. PAGE 14 (a) Paragraph 4.5.2, last paragraph, line 3: Delete “intact and securely in place).“ and substitute “intact and not manually removable) . (b) Paragraph 4.5.3, third paragraph: Delete “The packed shipping boxes . . . Re

17、sonance testing does not apply.“ and substitute The packed shipping boxes or metal containers shall be subjected to the vibration test in accordance with paragraph 4.1, and with Figures on pages: 8-3, B-4, and B-5 (40 min./axis) ; B-6, B-7, and B-8 (32 min./axis) , International Test Operations Proc

18、edures (ITOP) , 1-2-601, dated O1 March 1988. Resonance testing does not apply.“ PAGE 16 Paragraph 4.5.6: (a) Second line: (i) Delete “512.1“ and substitute “512,. (2) Delete “for first article testing only.“ (b) End of paragraph, Add: To inspect the cargo compart- ment, unthread the base plug in th

19、e rear of the warhead, and remove the nose cone and base nose cone assemblies. If one or more warheads fail to meet the requirement, the test shall be considered a failure. This test is to be conducted for first article testing and until two consecutive lots have complied with the acceptance criteri

20、a specified. After satisfying this requirement, the leakage test shall be performed on every subsequent third lot only. Should the lot fail the acceptance criteria, the contractor shall be required to return to the two consecutive lot procedures above.“ Paragraph 4.5.8: Delete and substitute: “4.5.8

21、 Ballistic test. The tactical requirement for the warhead is to provide proper delivery of M73 grenades into target areas from 1000 to 6000 meters from the launching heli- copter. Performance shall be evaluated by ground launching a sample of 36 M261 warheads, assembled with MK66 Mod 1 or Mod 2 moto

22、rs, from any of the compatible launchers into a permanently contaminated field. Twelve warheads shall be conditioned at -5OO + 5O F, 12 warheads at +70 k 15O F, and 12 warheads at +150 - 5O F for a minimum period of 8 hours. Firing and fuze Provided by IHSNot for ResaleNo reproduction or networking

23、permitted without license from IHS-,-,-MIL-W-63468 (AR) Amendment 7 charging shall be accomplished by means of a Government- approved ballistic firing test set, using approximate fuze time settings to achieve airburst ranges of 1000, 3000, and 6000 meters. Time from launch to cargo ejection, and num

24、ber of grenade functions, shall be detected and recorded. If three or more payloads fail to eject, or 22 or more grenades fail to function, the lot shall be rejected.“ PAGE 19 Paragraph 6.3: Delete US Army Armament Research and Development Command, ATTN: DRDAR-QAF-I, Dover, NJ 07801.“ and substitute

25、 U.S Army Armament Research, Development, and Engineering Center, Attn: AMSTA-AR-QAC-S, Picatinny Arsenal, NJ 07806- 5000. “ The margins of this amendment are marked with vertical lines to indicate where changes to the previous amendment were made. This was done as a convenience only, and the Govern

26、ment assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the require- ments of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR Preparing activity: Army-AR . (Project 1340-1020) h Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 8600-7-2012 Endoscopes Medical endoscopes and endotherapy devices Basic requirements for medical endoscopes of water-resistant type《内窥镜 医用内窥镜和内疗器件 耐水型医用内窥镜用基本要求》.pdf BS ISO 8600-7-2012 Endoscopes Medical endoscopes and endotherapy devices Basic requirements for medical endoscopes of water-resistant type《内窥镜 医用内窥镜和内疗器件 耐水型医用内窥镜用基本要求》.pdf
  • BS ISO 8601-2005 Data elements and interchange formats Information interchange Representation of dates and times《数据元和交换格式 信息交换 日期和时间表示法》.pdf BS ISO 8601-2005 Data elements and interchange formats Information interchange Representation of dates and times《数据元和交换格式 信息交换 日期和时间表示法》.pdf
  • BS ISO 8605-2001 Textile-glass-reinforced plastics - Sheet moulding compound (SMC) - Basis for specification《玻璃纤维增强塑料 片状模塑料(SMC) 规格依据》.pdf BS ISO 8605-2001 Textile-glass-reinforced plastics - Sheet moulding compound (SMC) - Basis for specification《玻璃纤维增强塑料 片状模塑料(SMC) 规格依据》.pdf
  • BS ISO 8608-2016 Mechanical vibration Road surface profiles Reporting of measured data《机械振动 路面纵断面 测量数据的报告》.pdf BS ISO 8608-2016 Mechanical vibration Road surface profiles Reporting of measured data《机械振动 路面纵断面 测量数据的报告》.pdf
  • BS ISO 8622-1998 Cinematography - Magnetic sound records on 70 mm motion-picture release prints with magnetic stripes - A-chain reproduction characteristics《电影技术 磁带声迹70mm电.pdf BS ISO 8622-1998 Cinematography - Magnetic sound records on 70 mm motion-picture release prints with magnetic stripes - A-chain reproduction characteristics《电影技术 磁带声迹70mm电.pdf
  • BS ISO 8625-4-2011 Aerospace Fluid systems Vocabulary General terms and definitions relating to control actuation systems《航空航天 液体系统 词汇 和控制 驱动系统相关的一般术语和定义》.pdf BS ISO 8625-4-2011 Aerospace Fluid systems Vocabulary General terms and definitions relating to control actuation systems《航空航天 液体系统 词汇 和控制 驱动系统相关的一般术语和定义》.pdf
  • BS ISO 8636-2-2008 Machine tools - Test conditions for bridge-type milling machines - Testing of the accuracy - Travelling bridge (gantry-type) machines《机床 桥式铣床的试验条件 精度测试.pdf BS ISO 8636-2-2008 Machine tools - Test conditions for bridge-type milling machines - Testing of the accuracy - Travelling bridge (gantry-type) machines《机床 桥式铣床的试验条件 精度测试.pdf
  • BS ISO 8639-2016 Glass-reinforced thermosetting plastics (GRP) pipes and fittings Test methods for leaktightness and proof of structural design of flexible joints《玻璃增强热固性塑.pdf BS ISO 8639-2016 Glass-reinforced thermosetting plastics (GRP) pipes and fittings Test methods for leaktightness and proof of structural design of flexible joints《玻璃增强热固性塑.pdf
  • BS ISO 8640-1-2004 Textile machinery and accessories - Flat warp knitting machines - Vocabulary of basic structure and knitting elements《纺织机械与附件 平经编机 基础结构和编织机件的词汇》.pdf BS ISO 8640-1-2004 Textile machinery and accessories - Flat warp knitting machines - Vocabulary of basic structure and knitting elements《纺织机械与附件 平经编机 基础结构和编织机件的词汇》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1